Document List by Author

Peter Fritschel of LIGO - Massachusetts Institute of Technology is listed as an author on the following documents:
(List events moderated by Peter Fritschel)

LIGO-Number Title Author(s) Topic(s) Last Updated
D1500300-v3 aLIGO VOPO Oven Fabrice Matichard et al. Basic R&D
Squeezer
23 Oct 2024
E1400177-x0 aLIGO, ISC, Fast Shutter Peter Fritschel Sensing and Control
16 Oct 2024
D0902838-v5 Advanced LIGO Optical Layout Peter Fritschel et al. Detector
System Engineering
03 Jan 2017
E1400180-x0 aLIGO, ISC, Electronics Racks Peter Fritschel Sensing and Control
28 Aug 2024
M060323-v17 LIGO Laboratory Charter Hannah Hansen et al. Operations
Policies
Organizational Relations
NSF
Operations Business
Management
05 Aug 2024
E1700123-v1 ECR: Decommission HAM-ISI (HAM table) Optical Levers (Oplev) Peter Fritschel Seismic Isolation
System Engineering
31 Jul 2024
T1100472-v36 ADC and DAC Channel Usage for ISC Daniel Sigg et al. Sensing and Control
24 Jul 2024
T2200287-v3 Report of the LSC Post-O5 Study Group Peter Fritschel et al. Reports
Upgrades
A#
07 May 2024
D1500016-v6 ETM Low Voltage Low Noise Electro-Static Driver Main Board Rich Abbott et al. Sensing and Control
17 Nov 2023
T2300137-v2 Report from the Heavy Suspension Workshop @ MIT Brian Lantz et al. Suspensions
A#
19 Oct 2023
T080192-v1 Displacement Noise in Advanced LIGO Triple Suspensions Matthew Evans et al. Modelling
Conceptual Design
Suspensions
03 Oct 2023
E1200199-x0 aLIGO, ISC, Photodetectors and Sensors Daniel Sigg et al. Sensing and Control
21 Sep 2023
D1700361-v3 Layout of SLC Baffles with new 2017 SLiC Baffles Eduardo Sanchez et al. Integration
System Engineering
22 Jun 2023
E1200159-v1 aLIGO, SQZ, SQZT0 Daniel Sigg et al. Squeezer
23 Apr 2023
G2300838-v1 Update on LIGO Instruments (for OpenLVKEM, April 2023) Peter Fritschel Detector
13 Apr 2023
T2300041-v1 A♯ Strain Sensitivity Kevin Kuns et al. Conceptual Design
Upgrades
27 Jan 2023
G2202195-v1 Update on LIGO Instruments (for OpenLVKEM, Dec 2022) Peter Fritschel Reports
15 Dec 2022
E1200201-x0 aLIGO, ISC, Electronics, Analog Rich Abbott et al. Sensing and Control
06 Dec 2022
T2200384-v2 The LSC Instrument Science White Paper (2022-2023 edition) Peter Fritschel et al. Basic R&D
04 Dec 2022
E1200156-x0 aLIGO, ISC, Electronics Daniel Sigg et al. Sensing and Control
11 Nov 2022
G2200853-v2 Core Optics and Point Absorber Mitigation GariLynn Billingsley et al. Core Optics
Reviews
03 Nov 2022
T960120-x0 Misalignment-Beam Jitter Coupling in LIGO Peter Fritschel Document Migration
15 Sep 2022
D1500295-v4 OPO Suspension (OPOS, VOPO, VIP) Overall Assembly Drawing Fabrice Matichard et al. Basic R&D
Squeezer
12 Sep 2022
M2100169-v2 Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 Sheila Rowan et al. Core Optics
A+
Basic R&D
Upgrades
Technical Review Board
Memorandum
04 Aug 2022
T990089-v1 Characterization and comparison of a potential new (SUS) local sensor Peter Fritschel et al. Sensing and Control
Basic R&D
30 Jun 2022
E1200198-x0 aLIGO, ISC, Opto-Mechanical Layouts Daniel Sigg et al. Sensing and Control
16 May 2022
G2200736-v1 Update on the LIGO, Virgo, and KAGRA detector upgrades for O4 Anamaria Effler et al. Meeting
28 Apr 2022
E1500359-v1 aLIGO, SQZ Lisa Barsotti et al. Squeezer
17 Mar 2022
E1200157-x0 aLIGO, ISC, Real-Time Systems Daniel Sigg et al. Sensing and Control
08 Feb 2022
E1200174-x0 aLIGO, ISC, Electronics, Wiring & Cabling Design Daniel Sigg et al. Sensing and Control
19 Jan 2022
T2100298-v2 Instrument Science White Paper 2021 Peter Fritschel et al. Basic R&D
14 Oct 2021
E1200166-x0 aLIGO, ISC, TransMon Daniel Sigg et al. Sensing and Control
25 Mar 2021
T990013-x0 Diagnostics Test Software Daniel Sigg et al. Sensing and Control
Data Acquisition System
Document Migration
Data and Computing
30 Nov 2010
E1500362-v11 aLIGO, SQZ, Electronics Block Diagram Lisa Barsotti et al. Final Design
Squeezer
06 Feb 2017
D1900281-v9 Overview of Frequency-Dependent Squeezing layout for O4: HAM7, HAM8, SQZT0, SQZT7, SQZT8 Lee McCuller et al. Preliminary Design
A+
Squeezer
03 Nov 2020
E1500358-v2 aLIGO, SQZ, Preliminary Design Documents Lisa Barsotti et al. Preliminary Design
Squeezer
03 Nov 2020
G030460-v1 DC Readout for Advanced LIGO Peter Fritschel Sensing and Control
24 Sep 2020
T2000407-v3 Instrument Science White Paper 2020 Peter Fritschel et al. Detector
Integration
Basic R&D
Upgrades
31 Aug 2020
G1501317-v8 How we know GW150914 was NOT an injection Matthew Evans Data quality / vetoes
10 Aug 2020
T1500514-v3 LIGO Instrument Report in connection with GW150914 Peter Fritschel Detector
07 Aug 2020
T1900279-v2 Filter Cavity Optics Substrates Lee McCuller et al. Core Optics
A+
03 Aug 2020
T0900582-v7 Gas Damping Monte Carlo Matthew Evans et al. Core Optics
Detector
Vacuum
Suspensions
25 Jul 2020
M000154-x0 Technical Evaluation of Alternative Design Concepts for the LIGO-II Seismic Isolation System Rich Abbott et al. Document Migration
16 Jul 2020
E1200170-x0 aLIGO, ISC, ISC Daniel Sigg et al. Sensing and Control
13 Jul 2020
G1902305-v5 Point absorbers in aLIGO coating Slawomir Gras et al. Core Optics
16 Jun 2020
E1900177-v2 High-reliability Ultra-fast Mechanical Shutter Rich Abbott et al. Sensing and Control
Basic R&D
13 May 2020
E2000017-v1 A+ Output Mode Cleaner Coating Specifications Ken Strain et al. Core Optics
A+
17 Jan 2020
T1900416-v1 Filter Cavity Preliminary ISC design Lee McCuller et al. Preliminary Design
A+
Squeezer
09 Jan 2020
E1100267-v1 6 inch Vacuum Viewport Window Peter Fritschel Vacuum
Auxiliary Optics
25 Mar 2011
E1400099-x0 aLIGO LSC RF Photodetector Peter Fritschel et al. Sensing and Control
30 Oct 2019
P1900316-v1 Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO David Reitze et al. Detector
Activity
Basic R&D
11 Oct 2019
G952003-x0 Barry Controls STACIS Isolators: Their performance at MIT and Considerations forTheir Use in LIGO Gabriela Gonzalez et al. Seismic Isolation
Document Migration
18 Sep 2019
T1900410-v1 Desired results of the Cosmic Explorer engineering study Rana Adhikari et al. Vacuum
Conceptual Design
Observatory Facilities
09 Jul 2019
E1900147-v1 MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR GariLynn Billingsley et al. A+
Auxiliary Optics
07 Jun 2019
E1900146-v1 MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR GariLynn Billingsley et al. A+
Auxiliary Optics
07 Jun 2019
T070061-v1 AOS: Stray Light Control (SLC) Design Requirements Michael Smith et al. Document Migration
03 Jan 2011
E1200161-x0 aLIGO, ISC, ISCTEY Daniel Sigg et al. Sensing and Control
05 Dec 2018
E1200160-x0 aLIGO, ISC, ISCTEX Daniel Sigg et al. Sensing and Control
05 Dec 2018
T0900144-v7 Adv. LIGO Arm Length Stabilization Design Sam Waldman et al. Sensing and Control
Final Design
08 Nov 2018
T1400768-v3 Science Frame Sample Rates for PEM channels Peter Fritschel System Engineering
19 Oct 2018
T1800042-v5 The A+ design curve Lisa Barsotti et al. A+
Conceptual Design
11 Oct 2018
D1400301-v15 ETM and ITM ESD Low Voltage Driver Block Diagrams Rich Abbott et al. Sensing and Control
04 Oct 2018
D1100909-v5 Input Optics Electronics Layout Peter Fritschel et al. Data Acquisition System
Final Design
Input Optics
30 Apr 2012
T1600302-v2 aLIGO sensitivity projections for O2 Valery Frolov et al. Commissioning
17 Sep 2018
D1500297-v8 SQZ in-air optics table Lisa Barsotti et al. Basic R&D
Squeezer
30 Aug 2018
E1400110-x0 ISC RF Photodetector Design Documentation Peter Fritschel et al. Sensing and Control
08 Aug 2018
E1800071-x0 Top Level Grouping of AMD documentation, prepared for TRB review 2017-18 Sebastien Biscans et al. Operations
System Engineering
27 Jul 2018
P1400177-v6 Advanced LIGO Peter Fritschel et al. Final Design
17 Jul 2018
P080071-x0 Thermo-optic noise in coated mirrors for high-precision optical measurements Matthew Evans et al. Document Migration
Public relations
02 Jul 2018
T1800044-v5 Updated Advanced LIGO sensitivity design curve Lisa Barsotti et al. Detector
Modelling
12 Jun 2018
P1700260-v13 Improving astrophysical parameter estimation via offline noise subtraction for Advanced LIGO Jenne Driggers et al. Detector
Cleaning
25 May 2018
P1500260-v15 The Sensitivity of the Advanced LIGO Detectors at the Beginning of Gravitational Wave Astronomy Denis Martynov et al. Commissioning
10 Feb 2018
D1600319-v2 AS Port Fast Shutter Protection Block Diagram Peter Fritschel Sensing and Control
31 Jan 2018
G1800030-v1 LIGO: The Instruments that Launched Gravitational-wave Astronomy Peter Fritschel Requirements
23 Jan 2018
D1600493-v1 Layout of Stray Light Control Baffles Peter Fritschel System Engineering
05 Dec 2017
E1500012-v2 ECR: Move IO input beam PZT-mount from periscope to PSL/IO table surface Peter Fritschel et al. Input Optics
17 Jul 2017
P1500147-v1 What's next for LIGO? Report from the 1st Dawn Workshop 7-8 May 2015, Silver Spring, MD Stefan Ballmer et al. Meeting
27 Jun 2017
E1200168-x0 aLIGO, ISC, TransMonEY Daniel Sigg et al. Sensing and Control
07 Jun 2017
E1200167-x0 aLIGO, ISC, TransMonEX Daniel Sigg et al. Sensing and Control
07 Jun 2017
E1500361-x0 aLIGO, SQZ, VOPO Lisa Barsotti et al. Preliminary Design
Squeezer
17 Apr 2017
T1000310-v2 Passive Isolation Stack for HAM1 (HAM7) in Advanced LIGO Peter Fritschel Sensing and Control
Seismic Isolation
28 Mar 2017
E1400219-x0 LHO ISC Electronics Racks Peter Fritschel Sensing and Control
02 Mar 2017
P1600285-v21 Validating gravitational-wave detections: The Advanced LIGO hardware injection system Christopher Biwer et al. Detector
20 Feb 2017
E1600262-v4 aLIGO OMC: Spare OMC production plan Koji Arai et al. Assembly
Sensing and Control
09 Dec 2016
E1500015-x0 ETM and ITM Low Voltage Electro-Static Driver Documentation Peter Fritschel Sensing and Control
Suspensions
03 Oct 2016
T1600059-v2 New RCG 3.0 DAQ Decimation (Downsampling) Filters Peter Fritschel Data Acquisition System
09 Aug 2016
T1400719-v1 A Note on the DAQ Decimation (Downsampling) Filters (Prior to RCG 3.0) Peter Fritschel Data Acquisition System
09 Aug 2016
T1500075-v1 A Note on the RCG Decimation (IOP Upsampling / Downsampling) Filters (Prior to RCG 3.0) Peter Fritschel Data Acquisition System
09 Aug 2016
T1600066-v1 New RCG 3.0 Decimation (IOP Upsampling / Downsampling) Filter for 16 kHz models Peter Fritschel Data Acquisition System
09 Aug 2016
G1600769-v5 Projected sensitivities towards aLIGO+ Lisa Barsotti et al. Upgrades
07 Jul 2016
T1300503-v4 Redesign of quad UIM coil driver and magnet size to reduce magnetic coupling Norna Robertson et al. Final Design
Suspensions
14 Jun 2016
T1200479-v2 (UK) Electrostatic Driver (HV ESD) Range and Noise Peter Fritschel Sensing and Control
Modelling
Suspensions
System Engineering
08 Jun 2016
P150914-v14 Observation of Gravitational Waves from a Binary Black Hole Merger LIGO Scientific Collaboration et al. GW Bursts
Compact Binaries
04 Apr 2016
E1600102-x0 PI damping, Reference material Peter Fritschel Sensing and Control
31 Mar 2016
E1600100-x0 Parametric Instability Active Damping Peter Fritschel Sensing and Control
31 Mar 2016
E1600101-x0 PI damping, Electronics Peter Fritschel Sensing and Control
31 Mar 2016
G1600209-v1 P150914 Figure 3 LIGO Scientific Collaboration et al. Detector
Education, Outreach
25 Feb 2016
L1500103-v1 Technical Review Board (TRB) report: Should We Insulate the Beamtube? Dennis Coyne et al. Vacuum
Technical Review Board
System Engineering
15 Dec 2015
T070089-v1 Wide angle scatter from LIGO arm cavities Michael Zucker et al. Basic R&D
Auxiliary Optics
System Engineering
19 Oct 2015
T1500484-v2 Maximum ETM displacement for Hardware Injections, pre-O1 Peter Fritschel Modelling
System Engineering
18 Sep 2015
E0900113-v3 Compensation Plate Electro Static Drive gold coating specification GariLynn Billingsley Core Optics
Final Design
02 Sep 2015
E0900112-v3 Compensation Plate Barrel gold coating specification GariLynn Billingsley Core Optics
Final Design
02 Sep 2015
E1500349-v1 ECR: Changes to science frame channels for H1 and L1 Peter Fritschel Data Acquisition System
14 Aug 2015
E1500343-v1 ECR: Add sensor channel from EOM driver to science frames Peter Fritschel Sensing and Control
Input Optics
13 Aug 2015
T060075-v1 HAM Seismic Isolation Requirements Peter Fritschel Seismic Isolation
Requirements
Modelling
Suspensions
02 Aug 2015
D1500172-v1 PI Band Pass Filter Carl Adams et al. Fabrication
31 Jul 2015
T1500343-v1 Concept for a bounce & roll mode damper for the quad suspensions Peter Fritschel Basic R&D
Suspensions
02 Jul 2015
M1500035-v3 Advanced LIGO Project Closeout Acceptance David Shoemaker et al. Detector
Reports
06 May 2015
T1400335-v2 Ultra-fast Optical Shutter Design Peter Fritschel et al. Sensing and Control
29 Apr 2015
T1100490-v1 Forward scatter comparison CP06 and CP03 GariLynn Billingsley et al. Core Optics
Subsystem Test
31 Mar 2015
E990303-v1 Seismic Isolation Subsystem Design Requirements Document Dennis Coyne et al. Seismic Isolation
Requirements
Modelling
Conceptual Design
31 Mar 2015
G010017-x0 LIGO II Seismic Isolation Subsystem (SEI) Design Requirements Review Peter Fritschel et al. Document Migration
27 Mar 2015
T020033-x0 Initial LIGO Seismic Isolation Upgrade Design Requirements Document Dennis Coyne et al. Document Migration
25 Mar 2015
E1500156-v2 Arm Length Stabilisation Acceptance Documentation Bram Slagmolen et al. Sensing and Control
Installation
25 Mar 2015
E1500008-v2 ISC Output Mode Cleaner: Acceptance Documentation Koji Arai et al. Sensing and Control
17 Mar 2015
T1100291-v2 aLIGO ISC Whitening Chassis Test Procedure Rich Abbott et al. Sensing and Control
System Test
16 Mar 2015
E1500178-x0 ISC Slow Controls: Acceptance Documentation Peter Fritschel Sensing and Control
Reviews
14 Mar 2015
E1500172-x0 Summary of COC fabrication acceptance review Peter Fritschel Core Optics
Reviews
12 Mar 2015
T1300354-v3 Scattered light noise due to the ETM coating ripple Peter Fritschel et al. Modelling
System Engineering
11 Mar 2015
Q1500012-v1 Waiver: unapproved source and no material certs for some small Viton o-rings Peter Fritschel Sensing and Control
Vacuum
Quality Assurance
System Engineering
11 Mar 2015
L1200291-v5 TRB Report: Recommendation related to the discrepancy between single version of the quad ITM suspensions and the optical layout which calls for a left and right handed versions Calum Torrie et al. Installation
System Engineering
11 Mar 2015
E1101087-v3 aLIGO OMC Mounting Prisms Sam Waldman et al. Sensing and Control
Requirements
08 Mar 2015
T000053-v1 aLIGO Universal Suspension Subsystem Design Requirements Dennis Coyne Conceptual Design
Suspensions
08 Mar 2015
E1300794-v1 ECR: New naming scheme for OMC channels Peter Fritschel Sensing and Control
Change Control
08 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Sensing and Control
Integration
Basic R&D
05 Mar 2015
E1200169-x0 aLIGO, ISC, ALS Daniel Sigg et al. Sensing and Control
04 Mar 2015
L1500028-v1 Documentation of Two Hour Lock Milestone for H1 Peter Fritschel et al. Integration
02 Mar 2015
T1000276-v5 Output Mode Cleaner (OMC) Design Koji Arai et al. Sensing and Control
Final Design
02 Mar 2015
E1500050-v1 ISC Fast Shutters: Acceptance Documentation Peter Fritschel et al. Sensing and Control
26 Feb 2015
T010075-v3 Advanced LIGO Systems Design Peter Fritschel et al. System Engineering
17 Feb 2015
T980068-x0 Length Sensing & Control Subsystem Final Design Detector Isc Grp et al. Sensing and Control
Final Design
14 Feb 2015
E1400479-v1 ISC In-Vacuum Optics Tables: Acceptance Documentation Peter Fritschel Sensing and Control
Reviews
12 Feb 2015
E1200165-x0 aLIGO, ISC, HAM3 Daniel Sigg et al. Sensing and Control
11 Feb 2015
E1200163-x0 aLIGO, ISC, HAM1 Daniel Sigg et al. Sensing and Control
11 Feb 2015
P1400234-v3 In-situ Characterization of the Thermal State of Resonant Optical Interferometers via Tracking of their Higher Order Mode Resonances Chris Mueller et al. Sensing and Control
Commissioning
09 Feb 2015
M070025-x0 Record of Decision/Agreement (RODA) - Decision to adopt Hartmann sensors over WLISMI sensors for Advanced LIGO TCS Peter Fritschel et al. Document Migration
23 Jan 2015
T1500016-v2 Design overview for the new test mass electro-static driver Peter Fritschel et al. Sensing and Control
Requirements
Suspensions
23 Jan 2015
E1400395-v1 ISC Optics Tables (ISCT): Acceptance Documentation Peter Fritschel Sensing and Control
Reviews
22 Jan 2015
E1400391-x0 aLIGO, ISC, Fast Shutter Controls Rich Abbott et al. Sensing and Control
21 Jan 2015
E1500003-v1 ISC Electronics Racks and Cabling: Acceptance Documentation Peter Fritschel et al. Sensing and Control
Reviews
21 Jan 2015
E1200173-x0 aLIGO, ISC, Electronics, Physical Layout Daniel Sigg et al. Sensing and Control
21 Jan 2015
T1500001-v2 Noise requirement for the test mass electro-static driver Peter Fritschel Sensing and Control
Requirements
Suspensions
20 Jan 2015
T0900265-v1 Requirements and Interfaces for the ETM Transmission Monitor Suspension and Telescope Sam Waldman et al. Sensing and Control
Detector
Auxiliary Optics
19 Jan 2015
T1400727-v1 Installation procedure for ISC components in HAM1 Peter Fritschel Sensing and Control
Installation
22 Dec 2014
E1200164-x0 aLIGO, ISC, HAM6 Daniel Sigg et al. Sensing and Control
19 Dec 2014
E1300878-v4 ISC HAM Tip-Tilt Suspension Acceptance Documentation Bram Slagmolen et al. Sensing and Control
Installation
15 Dec 2014
P000008-x0 Readout and Control of a Power-Recycled Interferometric Gravitational Wave Antenna Rolf Bork et al. Document Migration
09 Dec 2014
E1200162-x0 aLIGO, ISC, ISCT End Daniel Sigg et al. Sensing and Control
04 Dec 2014
E1400081-v1 ISC RF System, Acceptance Documentation Peter Fritschel et al. Sensing and Control
Reviews
04 Dec 2014
E1300827-v2 ISC RF Demodulators and Phase Frequency Discriminators, Acceptance Rich Abbott et al. Sensing and Control
04 Dec 2014
E1200158-x0 aLIGO, ISC, ISCT1 Daniel Sigg et al. Sensing and Control
03 Dec 2014
E1200171-x0 aLIGO, ISC, ASC Daniel Sigg et al. Sensing and Control
01 Dec 2014
E1300862-x0 aLIGO, ISC, Tip-Tilt Mirror Mounts Peter Fritschel et al. Sensing and Control
27 Nov 2014
G1400938-v1 Mechanical Loss of Vacuum Compatible Epoxies for Tuned Mass Dampers Gregg Harry et al. Basic R&D
19 Nov 2014
G1400397-v2 Advanced LIGO Integration: timeline scenario for 2014 Peter Fritschel Integration
12 Nov 2014
D1400372-v1 Simple diagram of ALS optical layout Adam Mullavey et al. Sensing and Control
04 Nov 2014
E1200155-x0 aLIGO, ISC, Optical & Opto-Mechanical Components and Assemblies Daniel Sigg et al. Sensing and Control
06 Oct 2014
D1200690-v5 Laser PD Calibrator Head Rich Abbott et al. Sensing and Control
Subsystem Test
18 Sep 2014
E1400194-v1 ISC Common Mode Servo & Common Mode Summing Node: Acceptance Documentation Peter Fritschel et al. Sensing and Control
11 Sep 2014
G1401078-v1 Advanced LIGO Commissioning Overview Peter Fritschel Commissioning
27 Aug 2014
T050036-v4 Pre-Stabilized Laser Design Requirements Richard Savage et al. Requirements
Laser Systems
20 Aug 2014
E1400145-v1 ISC Custom Photodetectors: Acceptance Documentation Peter Fritschel et al. Sensing and Control
Reviews
19 Aug 2014
P1100090-v5 Tip-Tilt Mirror Suspension: Beam Steering for the Advanced LIGO Sensing and Control Signals Bram Slagmolen et al. Sensing and Control
Basic R&D
11 Aug 2014
T1100402-v3 ISC RF Photodetector Design: LSC & WFS Rich Abbott et al. Sensing and Control
Final Design
07 Aug 2014
D1002416-v5 Common Mode Servo Block Diagram Peter Fritschel Sensing and Control
05 Aug 2014
E1300854-v3 ISC Custom Optics, Acceptance Lisa Barsotti et al. Sensing and Control
05 Aug 2014
E1400011-v2 ISC Beam Diverters: Acceptance Documentation Peter Fritschel Sensing and Control
05 Aug 2014
E1300973-v2 ISC Signal Conditioning Electronics, Acceptance Peter Fritschel et al. Sensing and Control
05 Aug 2014
L1400119-v1 Documentation of Two Hour Lock Milestone for L1 Peter Fritschel et al. Integration
30 Jul 2014
G1400730-v1 Some notes on the electro-static drives Peter Fritschel Sensing and Control
Suspensions
01 Jul 2014
E1300803-x0 Changes Resulting from the L1 DRMI Testing Peter Fritschel et al. Integration
Commissioning
20 Jun 2014
E1300628-x0 aLIGO, Integration Testing, Input Mode Cleaner Test Daniel Sigg et al. Integration
19 Jun 2014
E1300419-v1 ECR: Add half-wave plate to REFL beam path in HAM1 Peter Fritschel Sensing and Control
Change Control
19 Jun 2014
E1300676-v1 ECR - Extraction of PSL beam in HAM1 through central viewport Lisa Barsotti et al. Sensing and Control
Installation
19 Jun 2014
T1400011-v1 Integration Testing: Systems meeting discussion, 15 Jan 2014 Peter Fritschel Integration
Commissioning
18 Jun 2014
T1300174-v2 Commissioning Advanced LIGO’s HIFO-Y Daniel Sigg et al. Integration
Commissioning
System Engineering
18 Jun 2014
L1300176-v1 Executive Summary of the LHO HIFO-Y Test Daniel Sigg et al. Integration
18 Jun 2014
T1100201-v4 Commissioning the Advanced LIGO L1 Input Mode Cleaner Peter Fritschel et al. Integration
Input Optics
18 Jun 2014
T1400368-v1 Advanced LIGO Operations Commissioning Plan Peter Fritschel et al. Commissioning
11 Jun 2014
D0902796-v4 Quad IQ Demodulator Chassis Rich Abbott et al. Fabrication
30 May 2014
T1400053-v2 Integration testing report for the L1 DRMI Peter Fritschel et al. Integration
19 May 2014
T010007-v5 Cavity Optics Suspension Subsystem Design Requirements Mark Barton et al. Requirements
Suspensions
17 May 2014
T1400317-v1 Arm Length Stabilization (ALS) Vertex Detection System Peter Fritschel Sensing and Control
05 May 2014
T1000264-v7 List of ISC Photodetectors in Advanced LIGO Peter Fritschel et al. Sensing and Control
01 Apr 2014
E1200425-x0 aLIGO, ISC, Electronics, Whitening/VGA Module Peter Fritschel Sensing and Control
18 Mar 2014
T1400223-v1 UIM Coil Driver modifications for larger range Peter Fritschel Sensing and Control
Suspensions
18 Mar 2014
G960270-x0 PNI Status and Plans - Science & Integration Meeting, 12-13 December 1996 Peter Fritschel Document Migration
14 Mar 2014
G960183-x0 Alignment Sensing/Control Design Requirements Review Peter Fritschel et al. Document Migration
13 Mar 2014
G960105-x0 Interferometry for Gravity Wave Detection Peter Fritschel Document Migration
13 Mar 2014
T1400196-v1 ISC RFPD Resonant Circuit Optimizer Code Rich Abbott et al. Sensing and Control
Final Design
10 Mar 2014
E1200539-x0 aLIGO, ISC, In-Vacuum QPD Koji Arai et al. Sensing and Control
04 Mar 2014
E1400103-x0 aLIGO ASC RF Photodetector (WFS) Peter Fritschel et al. Sensing and Control
04 Mar 2014
T070189-v3 Design Specifications for the OMC Suspension Norna Robertson et al. Requirements
Suspensions
07 Feb 2014
T1200307-v4 Early aLIGO Configurations: example scenarios toward design sensitivity Lisa Barsotti et al. Commissioning
15 Jan 2014
E1200835-x0 aLIGO, ISC, In-Vacuum Beam Diverter Peter Fritschel Sensing and Control
08 Jan 2014
T070236-v1 Interferometer Sensing and Control Design Requirements Peter Fritschel Sensing and Control
13 Dec 2013
T1200437-v3 Advanced LIGO Interferometer Integration Peter Fritschel et al. Integration
Commissioning
11 Dec 2013
T0900423-v4 ISC Quadrant Photodetector Design Rich Abbott et al. Sensing and Control
Basic R&D
09 Dec 2013
D1200105-v2 Breadboard OMC aLIGO Sam Barnum et al. Sensing and Control
Conceptual Design
22 Nov 2013
E1300819-v2 ISC HAM6 Fast Shutter Hardware Chain Rich Abbott et al. Sensing and Control
Conceptual Design
30 Oct 2013
G1300952-v1 aLIGO Output Mode Cleaner: Design, Fabrication, and Installation Rich Abbott et al. Sensing and Control
Final Design
Fabrication
Installation
20 Sep 2013
E1300711-x0 aLIGO, ISC, Opto-Mechanics: In-vacuum bases Peter Fritschel Sensing and Control
10 Sep 2013
L1200261-v2 Executive Summary of the One Arm Test Daniel Sigg et al. Integration
16 Aug 2013
E1200196-x0 aLIGO, ISC, Block Diagrams Daniel Sigg et al. Sensing and Control
08 Aug 2013
G1300524-v1 The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition Adam Mullavey et al. Sensing and Control
Commissioning
09 Jul 2013
E1300516-x0 DCN for ALS End Station Periscopes Bram Slagmolen et al. Sensing and Control
Fabrication
01 Jul 2013
T1300558-v1 L1 DRMI Measurements: a checklist Peter Fritschel et al. System Test
Commissioning
18 Jun 2013
D1002803-v5 End Station ISC Electronics Layout Peter Fritschel Sensing and Control
30 Apr 2012
G960044-x0 Phase Noise Interferometer: Motivation & Objectives - Presentation at NSF Review of the MIT Component of the LIGO Project, 20-22 March 1996 Peter Fritschel Document Migration
08 May 2013
C1107192-v8 Statement of Work for aLIGO OMC Optics Sam Waldman et al. Sensing and Control
Fabrication
03 May 2013
E1101086-v6 OMC Optical Prisms Sam Waldman et al. Sensing and Control
Requirements
03 May 2013
G950051-x0 Barry Controls Isolators: Are they Useful for LIGO? Peter Fritschel Document Migration
02 May 2013
G940035-x0 MIT Technical Program - NSF Cost Review Presentation Peter Fritschel Document Migration
26 Apr 2013
G930062-x0 Interferometer Topology Decision: Summary and Viewgraph Presentations Peter Fritschel et al. Document Migration
18 Apr 2013
D1100170-v4 Vertex ISC Electronics Layout Peter Fritschel et al. Sensing and Control
11 Apr 2013
T1100080-v3 Commissioning Advanced LIGO's First Arm Cavity Daniel Sigg et al. Integration
Commissioning
System Engineering
17 Mar 2013
E1200836-v1 aLIGO Optical Lever Longitudinal-to-Angle Coupling Coefficients Peter Fritschel et al. Auxiliary Optics
20 Feb 2013
L1300018-v2 Summary of the L1 Input Mode Cleaner Testing Peter Fritschel et al. Integration
16 Feb 2013
D1000653-v4 TOP LEVEL ISC Equipment Block Diagram Rich Abbott et al. Sensing and Control
Conceptual Design
31 Jan 2013
G1201295-v2 Magnetic coupling to test mass suspensions. Peter Fritschel Integration
Suspensions
Subsystem Test
02 Jan 2013
D1200662-v2 Gain factors for ISC RF detectors and signal conditioning chain Peter Fritschel Sensing and Control
08 Nov 2012
D1200749-v3 AL Mass Replacement for ECD Magnet Assembly Sam Barnum et al. Sensing and Control
Final Design
12 Oct 2012
C1204586-v2 Statement of Work: Fabrication of Hermetically Sealed Electronics Enclosures Peter Fritschel et al. Procurements
19 Sep 2012
T050271-x0 Considerations regarding magnet strengths for the Advanced LIGO test mass quadruple suspensions Peter Fritschel Preliminary Design
Suspensions
11 Sep 2012
M1200276-v1 RODA: Increase of Schnupp Asymmetry from 5 cm to 8 cm Peter Fritschel et al. Final Design
System Engineering
06 Aug 2012
T1200351-v1 Correction to the inspiral range calculation in GWINC Peter Fritschel et al. GW source predictions
Modelling
Compact Binaries
16 Jul 2012
E1200683-v2 End Station Rack Naming Convention Rich Abbott et al. Final Design
System Engineering
12 Jul 2012
E950087-x0 LIGO Detector Subsystem Review Report Design Requirements Review ASC Bill Althouse et al. Document Migration
12 Jun 2012
E950085-x0 Design Requirements Review - Suspension Bill Althouse et al. Document Migration
12 Jun 2012
G1200588-v1 aLIGO Integration status for 23 May 2012 meeting Peter Fritschel Integration
23 May 2012
E1200172-x0 aLIGO, ISC, IMC Daniel Sigg et al. Sensing and Control
29 Apr 2012
D1200658-x0 Flexible Tube Mount, 10in, ISC Table, aLIGO Sam Barnum et al. Auxiliary Optics
Final Design
27 Apr 2012
T1000298-v2 Advanced LIGO Length Sensing and Control Final Design Guido Mueller et al. Sensing and Control
Final Design
09 Apr 2012
E1200122-x0 aLIGO, ISC Rich Abbott et al. Sensing and Control
21 Mar 2012
E1200195-x0 aLIGO, ISC, System Overview Daniel Sigg et al. Sensing and Control
09 Feb 2012
E1101095-v4 Advanced LIGO Output Mode Cleaner Coating Specifications Sam Waldman et al. Sensing and Control
Conceptual Design
31 Jan 2012
T1100062-v6 aLIGO I&Q Demodulator Test Procedure Rich Abbott et al. Sensing and Control
Subsystem Test
09 Jan 2012
E1101088-v4 aLIGO OMC Curved Optics Specification Sam Waldman et al. Sensing and Control
Requirements
06 Dec 2011
T1100448-x0 Input Optics Power Control Rich Abbott et al. Final Design
Input Optics
22 Aug 2011
T010103-v1 aLIGO Suspension System Conceptual Design Russell Jones et al. Conceptual Design
Suspensions
09 Jun 2011
G1100462-v2 ISC Technical Status - NSF 2011 Peter Fritschel Sensing and Control
Reviews
05 May 2011
G1100505-v2 Plenary 3 Advanced LIGO Technical Description, Part I, April 2011 NSF Review Peter Fritschel Reviews
05 May 2011
G1100445-v3 Plenary 5 Integration Planning - NSF 2011 Valery Frolov et al. Sensing and Control
05 May 2011
C1102245-v4 Statement of Work for 6 inch Vacuum Viewport Windows Peter Fritschel Procurements
Auxiliary Optics
08 Apr 2011
E1000246-v6 6.0 inch Vacuum Viewport Specification Michael Smith et al. Final Design
21 Mar 2011
T1000175-v2 Thinner Compensation Plates for reduced Squeeze film damping Matthew Evans et al. Sensing and Control
Core Optics
Change Control
Vacuum
Suspensions
Technical Review Board
System Engineering
14 Dec 2010
C1001195-v5 Statement of Work - Quad I&Q RF Demodulator Rich Abbott et al. Fabrication
22 Sep 2010
T1000251-v1 Report of the Committee to Compare the Scientific Cases for AHLV and HHLV B Sathyaprakash et al. Modelling
Collaboration
Reports
Astrophysics / Multi-messenger
02 Jun 2010
E0900111-v1 Test Mass Barrel gold coating specification - obsolete Peter Fritschel Core Optics
Auxiliary Optics
Final Design
System Engineering
26 May 2010
P070082-v4 LIGO: The Laser Interferometer Gravitational-Wave Observatory Peter Fritschel Detector
21 Mar 2010
T060156-v1 Enhanced LIGO Sam Waldman et al. Sensing and Control
18 Nov 2009
P070044-x0 Effects of mode degeneracy in the LIGO Livingston Observatory recycling cavity Brian O'Reilly et al. Document Migration
Public relations
14 Oct 2009
T070247-v1 AdvLIGO Interferometer Sensing and Control Conceptual Design Peter Fritschel Sensing and Control
Conceptual Design
14 Sep 2009
T080208-v1 Stable Recycling Cavities for Advanced LIGO Guido Mueller et al. Activity
01 Jun 2009
M080371-v1 RODA: Arm Length Stabilization system to use end-station injection of a 532 nm beam, and PDH cavity sensing. Peter Fritschel System Engineering
16 Mar 2009
M0900025-v1 RODA: Decision to reduce the beam size on the ITMs to 5.3 cm Peter Fritschel Activity
System Engineering
16 Feb 2009
G080541-x0 Mechanical Mode Damping for Parametric Instability Control - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam Dennis Coyne et al. Document Migration
01 Oct 2008
G080551-x0 Adv. LIGO Arm Length Stabilisation - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam Rana Adhikari et al. Document Migration
01 Oct 2008
G080391-x0 Technical Status of Advanced LIGO - PAC 24 Meeting @ LIGO Hanford Observatory, June 24-25, 2008 Dennis Coyne et al. Document Migration
27 Jun 2008
T080146-x0 Specification and Drawing Review Notes for Input Optics Long Lead Procurement Readiness Review GariLynn Billingsley et al. Document Migration
11 Jun 2008
G080255-x0 ISC Requirements and Conceptual Design Review Presentation Peter Fritschel Document Migration
21 Apr 2008
T080053-x0 Comments and Questions and Responses on the BOSEM FDR and FRR, and Responses Betsy Weaver et al. Document Migration
06 Mar 2008
T040199-x0 Dimensions for Advanced LIGO Fused Silica Test Masses Peter Fritschel Document Migration
05 Feb 2008
T070303-x0 Arm Cavity Finesse for Advanced LIGO Rana Adhikari et al. Document Migration
21 Dec 2007
T070248-x0 Advanced LIGO Input Optics Preliminary Design Review Report Dennis Coyne et al. Document Migration
06 Nov 2007
T010067-x0 Noise from Fizeau effect Peter Fritschel et al. Document Migration
24 Oct 2007
G070254-x0 The Big Bang Observer: High Laser Power for Gravitational-wave Astrophysics William Folkner et al. Document Migration
23 Oct 2007
T070207-x0 OMC Structure Frequencies –Results and Interpretation Peter Fritschel et al. Document Migration
17 Sep 2007
G070166-x0 OMC Design Considerations - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 Rich Abbott et al. Document Migration
11 Jul 2007
G070372-x0 Advanced LIGO Subsystem Descriptions - NSF Review of Advanced LIGO Dennis Coyne et al. Document Migration
06 Jul 2007
G070401-x0 Ground Based Gravitational Wave Interferometers Peter Fritschel Document Migration
15 Jun 2007
G070217-x0 Advanced LIGO ISC Overview - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 Peter Fritschel Document Migration
02 Apr 2007
G070216-x0 Stochastic Analysis Group Overview - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 Peter Fritschel Document Migration
02 Apr 2007
G070191-x0 Modulation Scheme for Advanced LIGO - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 Rana Adhikari et al. Document Migration
27 Mar 2007
T060272-x0 Length Sensing and Control for AdLIGO Rana Adhikari et al. Document Migration
23 Feb 2007
T060257-x0 Conceptual Design of a Double Pendulum for the Output Mode Cleaner Dennis Coyne et al. Document Migration
10 Jan 2007
G050566-x0 LIGO Commissioning and Run Plans, 2005 NSF Review Peter Fritschel Document Migration
21 Dec 2006
G060481-x0 Length Sensing and Control of AdLIGO - LSC Meeting, August 14-17th, 2006 @ Louisiana State University Rana Adhikari et al. Document Migration
18 Aug 2006
G060226-x0 Advanced LIGO Subsystems - NSF Review of Advanced LIGO Project Dennis Coyne et al. Document Migration
08 Aug 2006
G010379-x0 Advance LIGO Suspensions Subsystem Design Requirements Review Peter Fritschel et al. Document Migration
23 Jun 2006
T010175-x0 Spatial Dependence of Force in Initial LIGO OSEMs O D'arcy et al. Document Migration
02 Jun 2006
T050252-x0 Enhancements to the LIGO S5 Detectors Rana Adhikari et al. Document Migration
02 Feb 2006
T050168-x0 40m DC readout review, report and recommendations Peter Fritschel et al. Document Migration
08 Sep 2005
G050371-x0 Commissioning Report - LSC Meeting, August 14th - 17th, Hanford WA Peter Fritschel Document Migration
17 Aug 2005
G050254-x0 S5 Run Performance Goals - PAC 18 Meeting, May 18-19th, 2005 Peter Fritschel et al. Document Migration
19 May 2005
G050259-x0 Initial LIGO Improvements & Advanced LIGO - PAC 18 Meeting, May 18-19th, 2005 Peter Fritschel Document Migration
18 May 2005
G050109-x0 Initial LIGO Upgrades - LSC Meeting, March 20-23, 2005, Livingston LA Peter Fritschel Document Migration
28 Mar 2005
T050040-x0 Fields in the Recycling Cavity at LIGO Livingston Observatory Erika D'ambrosio et al. Document Migration
10 Mar 2005
T040172-x0 LOS Output Electronics Modifications Rana Adhikari et al. Document Migration
15 Sep 2004
T040008-x0 Optical loss due to suspension mounting flats (Advanced LIGO) Peter Fritschel Document Migration
09 Aug 2004
G040143-x0 S2/S3 Calibration - LSC Meeting, March 15 - 18th, Livingston, LA Rana Adhikari et al. Document Migration
18 Mar 2004
G040066-x0 LIGO Commissioning Update - LSC Meeting, March 15 - 18th, Livingston, LA Peter Fritschel Document Migration
18 Mar 2004
T010097-x0 Auxiliary Suspended Optics Displacement Noise Requirements Peter Fritschel Document Migration
21 Jan 2004
T030290-x0 Description of the Angular Sensing and Control (ASC) System in H1 During the Third LIGO Science Run (S3) Stefan Ballmer et al. Document Migration
05 Jan 2004
T030250-x0 Combining the LIGO H1-H2, H1-L1 and H2-L1 Stochastic Background Measurements Optimally During Triple Coincident Operations Sukanta Bose et al. Document Migration
11 Dec 2003
G030555-x0 Vibration Reduction in ISC Periscope - LSC Meeting, November 10th - 13th, Hanford WA Peter Fritschel et al. Document Migration
18 Nov 2003
G030640-x0 Acoustic Mitigation Status for S3 - LSC Meeting, November 10th - 13th, Hanford WA Douglas Cook et al. Document Migration
14 Nov 2003
G030605-x0 Calibration: S2 update, S3 preliminaries - LSC Meeting, November 10th - 13th, Hanford WA Rana Adhikari et al. Document Migration
14 Nov 2003
G030608-x0 The Angular Control System at LHO: Current Status - LSC Meeting, November 10th - 13th, Hanford WA Stefan Ballmer et al. Document Migration
14 Nov 2003
T030004-x0 Shot noise and optical gain of the H1 interferometer Peter Fritschel Document Migration
10 Nov 2003
T030094-x0 LOS Coil Driver & Universal Dewhitening Filter Revisions Peter Fritschel Document Migration
06 Nov 2003
G030426-x0 S2 Calibration Rana Adhikari et al. Document Migration
14 Oct 2003
G030429-x0 Adv LIGO and retrofit seismic isolation research update - LSC Meeting, August 18th - 21st, Hannover, Germany Rich Abbott et al. Document Migration
14 Oct 2003
G030527-x0 Tasks After S3 - Commissioning Meeting Peter Fritschel et al. Document Migration
14 Oct 2003
G030268-x0 Advanced LIGO Systems Design & Interferometer Sensing & Optics Peter Fritschel Document Migration
18 Sep 2003
G030433-x0 LIGO Commissioning Report - LSC Meeting, August 18th - 21st, Hannover, Germany Peter Fritschel Document Migration
15 Sep 2003
G030414-x0 Hydraulic External Pre-Isolation, Progress on the Seismic Retrofit - LSC Meeting, August 18th - 21st, Hannover, Germany Rich Abbott et al. Document Migration
20 Aug 2003
T030097-x0 Calibration of the LIGO detectors for the First LIGO Scientific Run Rana Adhikari et al. Document Migration
28 May 2003
G030241-x0 LSC Changes in Preparation of High Power Operations Matthew Evans et al. Document Migration
07 May 2003
G030068-x0 LIGO Commissioning Update - LSC Meeting, March 17th - 20th, Livingston, LA Peter Fritschel et al. Document Migration
31 Mar 2003
G030116-x0 External Pre-Isolation Progress on the Seismic Retrofit - LSC Meeting, March 17th - 20th, Livingston, LA Rich Abbott et al. Document Migration
27 Mar 2003
G030010-x0 Tasks after S2 Peter Fritschel et al. Document Migration
10 Mar 2003
T020166-x0 Detecting a Stochastic Background of Gravitational Radiation - Background Information Bruce Allen et al. Document Migration
29 Jan 2003
G020482-x0 Commissioning - NSF Annual Review Peter Fritschel Document Migration
22 Oct 2002
T900044-x0 Status of the Fixed-Mass Interferometer Coupled Cavity Experiment Peter Fritschel et al. Document Migration
22 Oct 2002
T940079-x0 Phase Noise Interferometer Design Review Peter Fritschel Document Migration
10 Oct 2002
G020455-x0 Interferometer Sensing and Control (ISC) Peter Fritschel Document Migration
09 Oct 2002
G020345-x0 Second Generation LIGO Interferometers, SPIE Astronomical Instruments Conference Peter Fritschel Document Migration
07 Oct 2002
G020330-x0 Advanced LIGO Sensing - LSC Meeting, August 19th - 22nd, Hanford WA Peter Fritschel et al. Document Migration
23 Aug 2002
G020376-x0 Stochastic Upper Limit Group E7 Report - LSC Meeting, August 19th - 22nd, Hanford WA Bruce Allen et al. Document Migration
21 Aug 2002
T020115-x0 Stochastic Sources Upper Limit Group E7 Report Bruce Allen et al. Document Migration
19 Aug 2002
G020272-x0 Advanced LIGO Systems & ISC - PAC 12 Meeting, MIT Peter Fritschel Document Migration
17 Jul 2002
G020287-x0 LIGO Commissioning - PAC 12 Meeting Presentation Peter Fritschel et al. Document Migration
17 Jul 2002
G020268-x0 Commissioning, Part II - PAC 12 Meeting Peter Fritschel Document Migration
03 Jul 2002
G020230-x0 Staged Approach to Advanced LIGO Implementation Dennis Coyne et al. Document Migration
07 May 2002
T010140-x0 Digital Suspension Filter Design Peter Fritschel Document Migration
18 Apr 2002
G020144-x0 Low-frequency Cutoff in Advanced LIGO - LSC Meeting, March 20 - 23, Livingston LA Peter Fritschel Document Migration
08 Apr 2002
T020034-x0 Low-frequency Cutoff for Advanced LIGO Dennis Coyne et al. Document Migration
01 Apr 2002
G010396-x0 Intersite Environmental Correlations: E3 and E4 Investigations, Part 2: Bursts Nelson Christensen et al. Document Migration
13 Nov 2001
T010017-x0 Proposal to Set an Upper Limit on Stochastic Sources Using LIGO Engineering Data Bruce Allen et al. Document Migration
27 Aug 2001
G010286-x0 E3/E4 PEM Correlations, Part 1 - LSC Meeting August 13 - 16, Hanford WA Nelson Christensen et al. Document Migration
22 Aug 2001
G010302-x0 Advanced LIGO Systems Design and Requirements - LSC Meeting August 13 - 16, Hanford WA Peter Fritschel Document Migration
15 Aug 2001
G010242-x0 Advanced LIGO Systems Requirements Review Peter Fritschel Document Migration
17 Jul 2001
G010201-x0 The Second Generation LIGO Interferometers Peter Fritschel Document Migration
05 Jun 2001
G010200-x0 Pursuing Gravitational Wave Astrophysics with LIGO - University of Maryland Seminar, April 27, 2001 Peter Fritschel Document Migration
16 May 2001
T000072-x0 Proposal for Remote Control of Laser Power into 2km LHO Mode Cleaner Peter Fritschel et al. Document Migration
04 May 2001
G010086-x0 Global Control Issues for Advanced LIGO Quad Suspensions - LSC Meeting March 14 -17 2001 Livingston, LA Peter Fritschel Document Migration
21 Mar 2001
G010085-x0 Advanced LIGO Prestabilized Laser Requirements - LSC Meeting March 14 -17 2001 Livingston, LA Peter Fritschel Document Migration
21 Mar 2001
T970150-x0 LIGO Detector Subsystem Review Report: Design Requirements Review - Core Optics Support Subsystem Mike Fine et al. Document Migration
12 Mar 2001
G000428-x0 GW Readout Techniques - LIGO II System Requirements Meeting, MIT, May 18-19 2000 Peter Fritschel Document Migration
05 Mar 2001
T010022-x0 Minutes of the Core Optics Subgroup, 02-15-01 Helena Armandula et al. Document Migration
28 Feb 2001
G000316-x0 LIGO II: The Second Generation Interferometers Peter Fritschel Document Migration
03 Nov 2000
G000225-x0 Sensing and Control for LIGO II - LSC Meeting at Hanford, August 15-17, 2000 Peter Fritschel et al. Document Migration
15 Sep 2000
T000074-x0 DAC Output Signal Conditioning: Dewhitening and Anti-Imaging Filter Design Peter Fritschel et al. Document Migration
27 Jul 2000
T000062-x0 LIGO II System Requirements Meeting Summary Peter Fritschel et al. Document Migration
02 Jun 2000
G000112-x0 LHO 2km Cavity Commissioning: Servo Characterization and Performance Peter Fritschel Document Migration
11 May 2000
G000028-x0 Characterization of the LHO 2km Cavities Peter Fritschel Document Migration
09 May 2000
G000006-x0 LHO Mode Cleaner Commissioning Status - Director`s Review Peter Fritschel Document Migration
02 Mar 2000
T990125-x0 Mode Cleaner Installation & Test Plan Peter Fritschel Document Migration
11 Feb 2000
T990085-x0 Local Damping in the SOS & LOS Suspensions Peter Fritschel Document Migration
03 Nov 1999
G990053-x0 LIGO II: Requirements and Configurations, PAC6 Meeting Presentation, 20-21 May 1999 Peter Fritschel Document Migration
29 Jun 1999
G990036-x0 Global Diagnostics System Final Design Review Rolf Bork et al. Document Migration
12 May 1999
T980020-x0 GDS Reflective Memory Organization, Rev. A David Barker et al. Document Migration
26 Apr 1999
G980111-x0 Length Sensing/Control Final Design Review (FDR) Edward Daw et al. Document Migration
11 Sep 1998
G980109-x0 ASC Wavefront Sensing Final Design Review Peter Fritschel et al. Document Migration
11 Sep 1998
T970218-x0 Mode Cleaner Length/Frequency Control Design, Rev. 02 Peter Fritschel et al. Document Migration
19 May 1998
G980071-x0 ASC Initial Alignment Subsystem (IAS) Final Design Review (FDR) Peter Fritschel et al. Document Migration
04 May 1998
T970145-x0 Performance of VCO/AOM Frequency Shifter Peter Fritschel et al. Document Migration
21 Apr 1998
G970247-x0 The LIGO Project: Progress & Plans Peter Fritschel Document Migration
25 Mar 1998
T980004-x0 LIGO Channel Count Peter Fritschel et al. Document Migration
23 Mar 1998
T970228-x0 Performance of VCP/AOM Frequency Shifter Peter Fritschel et al. Document Migration
30 Jan 1998
G970192-x0 Length Sensing and Control (LSC) Subsystem Preliminary Design Review (PDR) Peter Fritschel et al. Document Migration
31 Jul 1997
T970122-x0 Length Sensing and Control (LSC) Subsystem Preliminary Design Peter Fritschel et al. Document Migration
22 Jul 1997
T960058-x0 Length Sensing & Control (LSC) Design Requirements Peter Fritschel et al. Document Migration
22 Jul 1997
T900017-x0 A Prototype Michelson Interferometer with Fabry-Perot Cavities Peter Fritschel et al. Document Migration
17 Jul 1997
T900009-x0 The Rigid Inline-Modulated Interferometer at MIT: A Summary of Results Peter Fritschel et al. Document Migration
02 Jul 1997
T900010-x0 Beam Imaging Diagnostic Systems Michael Burka et al. Document Migration
02 Jul 1997
T940066-x0 Optical Distortion in Gsanger Pockels Cells Peter Fritschel et al. Document Migration
28 Apr 1997
T970060-x0 Alignment Sensing/Control (ASC) Preliminary Design Peter Fritschel et al. Document Migration
24 Feb 1997
T952007-x0 Alignment Sensing/Control (ASC) Design Requirements Document Peter Fritschel et al. Document Migration
24 Feb 1997
T960174-x0 Summary of the Eddy Current Damping Experiment Peter Fritschel et al. Document Migration
31 Oct 1996
T960134-x0 Alignment Sensing/Control Conceptual Design. Peter Fritschel et al. Document Migration
26 Aug 1996
T960139-x0 Shot Noise Sensitivity of the Length Control Error Signals Peter Fritschel Document Migration
13 Aug 1996
T960122-x0 Proposed Initial Detector MC and RC Baseline Lengths Peter Fritschel et al. Document Migration
25 Jul 1996
E960027-x0 Report on the Design Requirements Review Core Optics Components Jordan Camp et al. Document Migration
12 Jun 1996
T960027-x0 Length Sensing and Control Subsystem Conceptual Design Description Jordan Camp et al. Document Migration
20 May 1996
T950108-x0 Conceptual Lay-Out for a 10 W Single Frequency, Prestabilized Nd:YAG Laser Alex Abramovici et al. Document Migration
20 Oct 1995
T950046-x0 Performance of the Barry Controls, Inc. STACIS Active Isolation System Peter Fritschel et al. Document Migration
24 Jul 1995

Number of documents found: 378


DCC Version 3.4.3, contact Document Database Administrators