Document List by Topic

These documents on Quality Assurance (subtopic of Management) are available:
(List events on Quality Assurance)

LIGO-Number Title Author(s) Topic(s) Last Updated
E1500377-v1 ETM10 Figure Measurement GariLynn Billingsley Quality Assurance
Core Optics
17 Apr 2024
E1200503-v1 IMCF-09 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200504-v1 IMCF-08 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200505-v1 IMCF-07 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200458-v1 IMCF-06 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200459-v1 IMCF-05 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200440-v1 IMCF-03 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200441-v1 IMCF-04 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200339-v2 IMCF-02 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
E1200338-v1 IMCF-01 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
23 Jan 2018
T1700533-v1 Collection of contamination flakes scraped off of LHO XMB Chandra Romel Vacuum
Quality Assurance
Cleaning
05 Dec 2017
E1500376-v1 ETM13 Figure Measurement GariLynn Billingsley Quality Assurance
Core Optics
16 Aug 2017
E1200964-v1 ERM-04 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
21 May 2015
E1500065-x0 BS03 Polish waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
31 Mar 2015
E1500149-v1 ETM11 HR coating pinhole, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500132-x0 ETM09 HR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500131-x0 ETM08 HR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500130-x0 ITM08 AR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500129-x0 ITM04 AR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500127-x0 ITM03 AR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500126-x0 ITM09 AR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500124-x0 ETM08 ETM AR coating waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500122-v1 ETM AR coating acceptance ETM08 and ETM12 GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500121-v1 ETM08 and ETM09 Pinhole in HR GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500118-x0 SR302 Polish Defect side and bevel fracture, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500117-x0 SR302 Polish Defect Incorrect arrow and serial number placement, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500116-x0 SR301 Polish Defect Incorrect arrow and serial number placement, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500115-x0 SR301 Polish Defect side and bevel fracture, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500114-x0 PR303 Polish Defect waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500112-x0 ITM06 Polish waiver, Bevel Defect GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500109-x0 ITM01 Polish waiver, excess defects GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500108-x0 ETM14 Polish waiver, excess defects GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500107-x0 ETM11 Polish waiver, Barrel scuff GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500106-x0 ETM13 Polish waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500103-x0 ETM09 Coating, 532 nm reflection waiver. GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500102-x0 ETM08 Coating, 532 nm reflection waiver. GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500100-x0 ITM04 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500099-x0 ETM14 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500098-x0 ETM11 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500096-x0 ETM09 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500095-x0 ETM08 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500094-x0 ITM09, Mounting flat fracture, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500093-x0 ITM09 Coating, Haze on AR surface, waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500092-x0 ITM06 Coating, Haze on AR surface GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500089-x0 ITM10 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500088-x0 ITM09 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500087-x0 ITM07 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500086-x0 ITM06 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500084-x0 ITM03 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500083-x0 ITM01 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500082-x0 ETM16 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500081-x0 ETM15 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500080-x0 ETM14 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500079-x0 ETM13 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500077-x0 ETM11 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500076-x0 ETM10 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500075-x0 ETM09 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500074-x0 ETM08 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500073-x0 ETM07 Coating, ripple waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500072-x0 ETM07 Coating, spherical aberration waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500071-x0 ETM07 Coating, 532 nm reflection waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500070-x0 ETM03 Polish waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500069-x0 CP09 Absorption waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500068-x0 BS06 Absorption waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500067-x0 BS05 Polish waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500066-x0 BS04 polish waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500064-x0 BS04 AR Absorption waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500063-x0 BS03 AR Absorption waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500062-x0 BS02 AR Absorption waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
E1500061-x0 BS01 AR Absorption waiver GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
11 Mar 2015
Q1500021-v1 Waiver: DLC mount cleaning Sam Waldman Vacuum
System Engineering
Quality Assurance
Sensing and Control
11 Mar 2015
Q1500020-v1 Waiver: optics cleaning Sam Waldman Vacuum
System Engineering
Quality Assurance
Sensing and Control
11 Mar 2015
Q1500019-v1 Waiver: air bake 50 barrel nuts Brian O'Reilly Vacuum
System Engineering
Quality Assurance
Seismic Isolation
11 Mar 2015
Q1500018-v1 Waiver: air bake 4 dowel pins for HAM-ISI actuator assy Brian O'Reilly Vacuum
System Engineering
Quality Assurance
Seismic Isolation
11 Mar 2015
Q1500017-v1 Need waiver for large parts Kyle Ryan Vacuum
System Engineering
Quality Assurance
Seismic Isolation
11 Mar 2015
Q1500016-v1 Need waiver for Al in SS Kyle Ryan Vacuum
System Engineering
Quality Assurance
11 Mar 2015
Q1500015-v1 Cleaning Procedure Waiver Request for AR Coated and Uncoated Viewports Bartie Rivera Vacuum
System Engineering
Quality Assurance
11 Mar 2015
Q1500013-v1 Waiver: dry machine, no clean and bake, 2 clamps for TMS Virginio Sannibale Vacuum
System Engineering
Quality Assurance
Auxiliary Optics
11 Mar 2015
Q1500012-v1 Waiver: unapproved source and no material certs for some small Viton o-rings Peter Fritschel Vacuum
System Engineering
Quality Assurance
Sensing and Control
11 Mar 2015
Q1500011-v1 Waiver: no impulse response, dynamic testing of the L1 BS with Elliptical Baffle Calum Torrie System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500009-v1 Waiver: class B cleaning of AOSEM positioning brackets for the L1 PR3 SUS assembly Gary Traylor Vacuum
System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500008-v1 Waiver Request from Suspensions - room temp out-gassing cure of EP-30-2 on ITM-Y only Calum Torrie et al. Vacuum
System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500007-v1 Waiver: Class A Waiver Request for 6 blanks at LLO Calum Torrie Vacuum
System Engineering
Quality Assurance
11 Mar 2015
Q1500006-v1 Waiver: no elevated temperature bake of adhesive for PR3 IM Matthew Heintze Vacuum
System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500004-v1 Waiver: to roughen surface of HLTS pen mass in situ Calum Torrie Vacuum
System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500003-v1 Waiver: EP30 heat cure waiver for L1 SR3 Janeen Romie Vacuum
System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500002-v1 Waiver: no bake for the H1 SR3 magnet repair Betsy Weaver Vacuum
System Engineering
Quality Assurance
Suspensions
11 Mar 2015
Q1500001-v1 Waiver: Class B cleaning of 3 Alu parts for the SLC Elliptical Baffle Calum Torrie Vacuum
System Engineering
Quality Assurance
Auxiliary Optics
11 Mar 2015
M070383-v1 cleaning waiver for ELI L1, 2" REO beamsplitter in HAM4 Dennis Coyne Vacuum
System Engineering
Quality Assurance
Sensing and Control
11 Mar 2015
L070089-v1 Request for advice/waivers on some Input Optics elements Dennis Coyne Quality Assurance
Input Optics
11 Mar 2015
E1500170-x0 Core Optics Fabrication Acceptance links aLIGO GariLynn Billingsley Quality Assurance
Core Optics
11 Mar 2015
G1300955-x0 dcc 3.1.0 release test document number three Cleveland Mak et al. System Test
Quality Assurance
Temporary Test Document
02 Oct 2013
E1200706-v1 ITM-04 Fiducial Line Measurements Jeffrey Lewis Quality Assurance
Core Optics
28 Nov 2012
Q0900001-v5 Advanced LIGO Supplier Quality Requirements Jeffrey Lewis et al. Quality Assurance
11 Mar 2011
Q1100003-v1 Acceptable Quality Level (AQL) for Inspection of LIGO Components Jeffrey Lewis et al. Quality Assurance
11 Feb 2011
Q1100001-v1 Request for Deviation Jeffrey Lewis et al. Quality Assurance
25 Jan 2011
T1000380-v1 Caltech WYKO pixel calibration GariLynn Billingsley Quality Assurance
Core Optics
Subsystem Test
09 Jul 2010
T1000306-v1 Standard Ordering Information for Printed Circuit Boards Rich Abbott et al. Assembly
Quality Assurance
15 Jun 2010
G1000056-v1 Intro to LIGO and the role of cleanliness in LIGO vacuum fabrications Michael Zucker Vacuum
Requirements
Quality Assurance
28 Jan 2010
F080008-v8 Advanced LIGO Inventory Database PO/Line Parts Import Template Dwayne Giardina et al. Commissioning
Quality Assurance
Procurements
Installation
Operations Business
10 Jun 2009
Q0900002-v1 ICS Load Management Workflows Mick Flanigan Requirements
Quality Assurance
Procurements
19 May 2009

Number of documents found: 101


DCC Version 3.4.3, contact Document Database Administrators