LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
T1400296-v10 |
Conceptual Design of a Larger Beamsplitter Suspension |
Norna Robertson et al. |
Conceptual Design
Suspensions
Basic R&D
|
23 Sep 2024 |
T1000164-v4 |
Calculation and measurement of the OSEM actuator sweet spot position |
Mark Barton |
Suspensions
Subsystem Test
|
23 May 2020 |
T1400030-v1 |
aLIGO HTTS Controls Design Description |
Mark Barton et al. |
Preliminary Design
Suspensions
|
19 Nov 2020 |
T1400029-v1 |
aLIGO HAUX Controls Design Description |
Mark Barton et al. |
Preliminary Design
Suspensions
|
19 Nov 2020 |
T020205-v1 |
Models of the Advanced LIGO Suspensions in Mathematica™ |
Mark Barton |
Modelling
Suspensions
|
30 Apr 2012 |
T1300595-v1 |
Estimate of thermal and seismic noise from aLIGO quad suspension blade springs |
Liam Cunningham et al. |
Suspensions
Basic R&D
|
08 Dec 2023 |
E1000495-x0 |
aLIGO SUS QUAD Testing and Commissioning Documentation |
Derek Bridges et al. |
Assembly
Commissioning
Suspensions
Subsystem Test
|
29 Mar 2023 |
T1400446-x0 |
aLIGO SUS Pendulum Dynamics Modeling |
Mark Barton |
Modelling
Suspensions
|
17 Mar 2023 |
T080188-v2 |
Models of the Advanced LIGO Suspensions in MATLAB |
Mark Barton et al. |
Modelling
Suspensions
|
24 Aug 2022 |
T040072-v1 |
Triple Model Pendulum Parameter Descriptions and Naming Convention |
Jeffrey Kissel et al. |
Document Migration
|
30 Nov 2021 |
E030518-v22 |
HSTS Assembly Procedure |
Janeen Romie et al. |
Assembly
Suspensions
|
07 Mar 2013 |
E1000006-v24 |
Advanced LIGO Quad Suspension Metal-Build Assembly Procedure |
Joe ODell et al. |
Assembly
Suspensions
Installation
|
06 Aug 2020 |
G080254-x0 |
Proposal for baseline change from ribbons to fibres in monolithic stage |
Mark Barton |
Document Migration
|
20 Jul 2020 |
T1100438-v1 |
Report on fiducial line position measurements for ETM04 |
Gerardo Moreno et al. |
Core Optics
Suspensions
Installation
|
01 Jul 2020 |
T1100404-v4 |
Note to support corrected jig settings-calculations for off-set fiducial lines of ETM04 |
Marielle van Veggel et al. |
Suspensions
Installation
|
01 Jul 2020 |
T0900286-v3 |
AOSEM FDD: Advanced LIGO OSEM Final Design Document |
Bobby Moore et al. |
Suspensions
|
10 Jul 2019 |
E1100860-v4 |
AOSEM Electronic Noise Test Procedure |
Mark Barton |
Suspensions
Subsystem Test
|
10 Jul 2019 |
T040027-v2 |
Conceptual Design of Beamsplitter Suspension for aLIGO |
Norna Robertson et al. |
Conceptual Design
Suspensions
|
14 Mar 2019 |
T0900083-v1 |
Modeling Cable Noise in LIGO |
Julian Earl Freed-Brown et al. |
Modelling
Final Design
Suspensions
|
16 Oct 2018 |
E1101030-v3 |
AOSEM Electronic Noise Test Data |
Mark Barton |
Suspensions
Subsystem Test
|
17 May 2018 |
T020059-v3 |
Are Reaction Chains Needed for aLIGO HAM Optics? |
Norna Robertson et al. |
Modelling
Sensing and Control
Seismic Isolation
Requirements
Document Migration
Suspensions
|
13 Feb 2018 |
T0900103-v2 |
Hysteresis and pitch mode Q in the quad noise prototype and possible implications for thermal noise |
Mark Barton |
Modelling
Final Design
Suspensions
|
28 Jul 2017 |
E1300860-v2 |
Quick Start Guide for Advanced LIGO Suspensions |
Janeen Romie et al. |
Operations
Suspensions
|
17 Dec 2016 |
D1000759-v3 |
Advanced LIGO SUS ETM Production Monolithic Assembly |
Russell Jones et al. |
Assembly
Final Design
Suspensions
|
12 Jul 2016 |
E1000752-v5 |
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) |
Margot Hennig et al. |
Suspensions
Installation
|
08 Mar 2016 |
E1200343-v96 |
OSEM Chart |
Stuart Aston et al. |
Assembly
Suspensions
Subsystem Test
|
22 Oct 2015 |
T1300876-v4 |
Violin Mode Frequency/Q Summary as predicted by Models |
Mark Barton |
Final Design
Suspensions
|
08 Mar 2015 |
E1400151-x0 |
3rd IFO SUS ETMY Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400150-x0 |
3rd IFO SUS ETMX Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400149-x0 |
3rd IFO SUS ITMY Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400148-x0 |
3rd IFO SUS ITMX Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400146-x0 |
H1 SUS ITMX Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1400147-x0 |
H1 SUS ITMY Acceptance Document |
Norna Robertson et al. |
Suspensions
|
11 Feb 2015 |
E1000521-x0 |
aLIGO SUS Quad Suspension Monolithic Build Test Reports |
Derek Bridges et al. |
Reports
Suspensions
Subsystem Test
|
01 Feb 2015 |
E1000517-x0 |
aLIGO SUS Quad Suspension Metal Build Test Reports |
Derek Bridges et al. |
Reports
Suspensions
Subsystem Test
|
01 Feb 2015 |
T1100616-v2 |
Buoyancy correction for suspensions |
Mark Barton et al. |
Suspensions
Installation
|
07 Jan 2015 |
E1000496-x0 |
aLIGO SUS BSFM Testing and Commissioning Documentation |
Derek Bridges et al. |
Assembly
Commissioning
Suspensions
Subsystem Test
|
25 Nov 2014 |
E1400161-v1 |
H1 SUS HLTS SR3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
06 Nov 2014 |
E1200633-v2 |
aLIGO SUS Operations Manual |
Mark Barton et al. |
Operations
Suspensions
|
23 Sep 2014 |
T1300926-v2 |
HLTS Violin Mode Q |
Mark Barton |
Modelling
Suspensions
Subsystem Test
|
09 Sep 2014 |
T1200418-v4 |
LLO MC2 Violin Mode Q |
Mark Barton et al. |
Modelling
Suspensions
Subsystem Test
Integration
|
09 Sep 2014 |
E1400124-v1 |
H1 SUS HSTS SR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400123-v1 |
H1 SUS HSTS SRM Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400122-v2 |
H1 SUS HSTS PR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400121-v4 |
H1 SUS HSTS PRM Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400120-v3 |
H1 SUS HSTS MC3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400118-v2 |
H1 SUS HSTS MC1 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400119-v1 |
H1 SUS HSTS MC2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400129-x0 |
3rd IFO SUS HSTS SR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400128-x0 |
3rd IFO SUS HSTS SRM Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400127-x0 |
3rd IFO SUS HSTS PR2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400126-x0 |
3rd IFO SUS HSTS MC3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400125-x0 |
3rd IFO SUS HSTS MC2 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
05 Sep 2014 |
E1400187-v4 |
SUS Acceptance Data Summary |
Mark Barton |
Fabrication
Suspensions
|
04 Sep 2014 |
E1400157-x0 |
3rd IFO SUS BS Acceptance Document |
Norna Robertson et al. |
Suspensions
|
04 Sep 2014 |
E1400159-x0 |
3rd IFO SUS HLTS PR3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
04 Sep 2014 |
T020011-x0 |
Suspension model comparisons |
Mark Barton et al. |
Document Migration
|
11 Jul 2014 |
T1400448-v1 |
Single Pendulum Parameter Descriptions and Naming Conventions |
Jeffrey Kissel et al. |
Modelling
Suspensions
|
07 Jul 2014 |
G1400629-v2 |
Overview of Mathematica and Matlab suspension modeling assets |
Mark Barton |
Modelling
Suspensions
|
11 Jun 2014 |
T1400185-x0 |
aLIGO Resonances |
Mark Barton |
Modelling
Subsystem Test
|
03 Jun 2014 |
T010007-v5 |
Cavity Optics Suspension Subsystem Design Requirements |
Mark Barton et al. |
Requirements
Suspensions
|
17 May 2014 |
E1400160-x0 |
3rd IFO SUS HLTS SR3 Acceptance Document |
Norna Robertson et al. |
Suspensions
|
30 Apr 2014 |
E1400158-x0 |
3rd IFO SUS OMC Acceptance Document |
Norna Robertson et al. |
Suspensions
|
30 Apr 2014 |
T1400293-x0 |
Suspension Alignment Offsets and Gains |
Mark Barton et al. |
Modelling
Suspensions
|
21 Apr 2014 |
T1200415-v1 |
aLIGO LHO Resonances |
Mark Barton |
System Test
Subsystem Test
|
03 Mar 2014 |
T0900060-v2 |
OMC Suspension Final Design Document |
Jay Heefner et al. |
Final Design
Suspensions
|
20 Feb 2014 |
T1400155-x0 |
aLIGO LLO Resonances |
Mark Barton |
Subsystem Test
|
18 Feb 2014 |
G1400012-v2 |
Adding ECD to Matlab/Mathematica SUS models |
Mark Barton |
Modelling
Suspensions
|
15 Jan 2014 |
T1300948-v3 |
LLO ETMY post-welding pitch value: actions and lessons |
Norna Robertson et al. |
Suspensions
Installation
|
13 Dec 2013 |
T1200416-v2 |
First Contact and its Effect on Pitch of Optics |
Mark Barton |
Modelling
Core Optics
Suspensions
Installation
|
09 Dec 2013 |
T1200385-v2 |
LLO BS Prism Gluing Issue and Resolution |
Janeen Romie et al. |
Modelling
Suspensions
Installation
|
18 Oct 2013 |
T1000012-v6 |
HAM Large Triple Suspension (HLTS) Final Design Document |
Norna Robertson et al. |
Final Design
Suspensions
|
17 Oct 2013 |
T0900435-v9 |
HAM Small Triple Suspension (HSTS) Final Design Document |
Norna Robertson et al. |
Final Design
Suspensions
|
10 Sep 2013 |
G1300830-v1 |
sustools.py, a Python module for SUS |
Mark Barton |
Commissioning
Suspensions
|
12 Aug 2013 |
E1000277-v13 |
Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) |
Marielle van Veggel et al. |
Final Design
Suspensions
|
25 Jul 2013 |
T1300534-v1 |
Exploration of the best way of applying longitudinal force at the quad test mass using the top mass actuators |
Mark Barton |
Modelling
Suspensions
|
13 Jun 2013 |
E1300502-x0 |
H1 SUS MC1 Acceptance Document |
Arnaud Pele et al. |
Suspensions
|
30 May 2013 |
E1300505-x0 |
H1 SUS MC2 Acceptance Document |
Mark Barton et al. |
Suspensions
|
30 May 2013 |
E1300504-x0 |
H1 SUS MC3 Acceptance document |
Mark Barton et al. |
Suspensions
|
30 May 2013 |
F1000008-v9 |
Quad Suspension Assembly Process Traveler Template |
Mark Barton et al. |
Assembly
Fabrication
Suspensions
|
25 Apr 2013 |
E040457-x0 |
SPECIFICATION: Advanced LIGO Safety Stop Design Requirements |
Mark Barton et al. |
Document Migration
|
14 Dec 2005 |
G1100769-v2 |
QUAD Testing Outline, Phase 2B |
Jeffrey Kissel et al. |
Core Optics
Commissioning
Fabrication
System Test
Suspensions
Subsystem Test
System Engineering
Basic R&D
Auxiliary Optics
|
25 Mar 2013 |
E1300178-v1 |
Pilot Hang Jig Settings Spreadsheet |
Mark Barton et al. |
Assembly
Suspensions
|
13 Mar 2013 |
E1000829-v6 |
BS/FM Prism Gluing Jig Settings Calculation Spreadsheet |
Marielle van Veggel et al. |
Suspensions
Installation
|
16 Jan 2013 |
E1000520-x0 |
aLIGO SUS Quad Suspension Monolithic Build Testing Procedure |
Derek Bridges et al. |
Suspensions
Subsystem Test
|
17 Oct 2012 |
E000038-x0 |
Document Change Notice (DCN) |
Mark Barton et al. |
Document Migration
|
28 Jun 2012 |
T080096-v1 |
Wire Attachment Points and Flexure Corrections |
Norna Robertson et al. |
Modelling
Suspensions
Subsystem Test
|
04 May 2012 |
T1100455-v2 |
Analysis of position/voltage data on a BOSEM |
Mark Barton et al. |
Suspensions
Subsystem Test
|
21 Feb 2012 |
G050239-v1 |
Suspension Modeling in Mathematica™ |
Mark Barton |
Modelling
Suspensions
|
06 Feb 2012 |
T1100621-v1 |
Moments of inertia etc for a wedged optic with flats |
Mark Barton |
Core Optics
Suspensions
Basic R&D
Auxiliary Optics
|
14 Dec 2011 |
E990197-x0 |
HSTS HLTS Magnet/Standoff Assembly Quality Conformance Worksheet |
Helena Armandula et al. |
Document Migration
|
10 Dec 2011 |
T1000345-v2 |
The Design of the IGR MKII Strength Testing Machine |
Russell Jones et al. |
Suspensions
Basic R&D
|
11 Oct 2011 |
D1101707-v3 |
Shelf, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
D1101706-v2 |
Horizontal Mount, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
D1101705-v2 |
Vertical Mount, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
D1101704-v2 |
Slide Bracket Mount, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
D1101703-v2 |
Slide-Horizontal Mount, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
D1101701-v2 |
Cup, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
D1101702-v2 |
JIG, Eddy current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Final Design
Suspensions
|
15 Sep 2011 |
E1100816-x0 |
SOW, JIG, Eddie current damper, UIM Tooling, aLIGO |
Sam Barnum et al. |
Fabrication
Suspensions
|
28 Aug 2011 |
T010103-v1 |
aLIGO Suspension System Conceptual Design |
Russell Jones et al. |
Conceptual Design
Suspensions
|
09 Jun 2011 |
F1000025-v1 |
Quad Suspension Metal Build Test Report Template |
Mark Barton et al. |
Assembly
Reports
Suspensions
Subsystem Test
|
19 Apr 2011 |
E1000498-x0 |
aLIGO SUS BOSEM Testing Documentation |
Derek Bridges et al. |
Suspensions
Subsystem Test
Incoming Inspection
|
04 Mar 2011 |
E1000500-x0 |
aLIGO SUS Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Commissioning
Suspensions
Subsystem Test
|
28 Feb 2011 |
E080426-v1 |
Advanced LIGO ERGO Arm Hazard Analysis |
Gregg Harry et al. |
Core Optics
Installation
|
06 Mar 2009 |
E1000516-x0 |
aLIGO SUS Quad Suspension Assembly Process Travelers |
Derek Bridges et al. |
Assembly
Suspensions
|
05 Oct 2010 |
E1000510-x0 |
aLIGO SUS BSC Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Assembly
Final Design
Commissioning
Suspensions
Subsystem Test
|
04 Oct 2010 |
E1000511-x0 |
aLIGO SUS HAM Suspension Test Stand and Electronics Testing and Commissioning Documentation |
Derek Bridges et al. |
Assembly
Commissioning
Suspensions
Subsystem Test
|
04 Oct 2010 |
T080245-v1 |
ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI |
Russell Jones et al. |
Suspensions
Subsystem Test
|
13 Jul 2010 |
T1000274-v1 |
Mathematica model of BS suspension (triple model cases 20081113bsZZ and 20081113bsNWZZ) |
Mark Barton |
Modelling
Suspensions
|
25 May 2010 |
T1000263-v1 |
Mathematica/Matlab model of ETM/ITM suspension (quad model case 20090819TM) |
Mark Barton |
Modelling
Suspensions
|
20 May 2010 |
T0900627-v2 |
Quad Suspension Cable Modeling in Mathematica™ |
Mark Barton |
Modelling
Final Design
Suspensions
|
01 Mar 2010 |
T1000049-v3 |
Procedure for monolithic rehang at LASTI |
Douglas Cook et al. |
Suspensions
Subsystem Test
|
25 Feb 2010 |
T1000041-v1 |
Electrostatic Drive Soldering Procedure |
Richard Mittleman et al. |
Fabrication
|
01 Feb 2010 |
P080006-x0 |
The Seismic Attenuation System (SAS) for the Advanced LIGO gravitational wave interferometric detectors |
David Ottaway et al. |
Document Migration
Public relations
|
21 Oct 2009 |
T0900391-v1 |
Pulling/Welding Procedure (LASTI, September 2009) |
Mark Barton |
Suspensions
Subsystem Test
|
08 Oct 2009 |
T070005-v1 |
Fibre Pulling and Welding Machine Electronics |
Mark Barton |
Suspensions
|
01 Oct 2009 |
G0900507-v2 |
Overview of monolithic suspension work for Advanced LIGO |
Timothy Bodiya et al. |
Suspensions
Basic R&D
|
19 Jun 2009 |
T0900203-v2 |
Assembly procedure of monolithic part of the suspension for advanced LIGO |
Giles Hammond et al. |
Preliminary Design
|
09 Jun 2009 |
T0900211-x0 |
Welding tests at Glasgow (5-8 May 2009) |
Marielle van Veggel et al. |
Final Design
Suspensions
|
06 May 2009 |
T0900055-v1 |
Rehang of the Quad NP with glass masses but metal wires (January 12-23 2009) |
Douglas Cook et al. |
Suspensions
|
29 Apr 2009 |
T080059-v1 |
Tilt tests on the RAL noise prototype – part 2 |
Ian Wilmut et al. |
Suspensions
Basic R&D
|
02 Mar 2009 |
T080048-v2 |
The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes |
Ken Strain et al. |
Final Design
System Test
Suspensions
|
27 Feb 2009 |
T030135-x0 |
Controls Prototype: - Measurements on the Mode Cleaner Triple Pendulum at Caltech |
Mark Barton et al. |
Document Migration
|
16 Jul 2008 |
T080152-x0 |
Questions preliminary design review of silica masses for advanced LIGO |
Mark Barton et al. |
Document Migration
|
20 Jun 2008 |
T070101-x0 |
Dissipation Dilution |
Mark Barton |
Document Migration
|
04 Jun 2008 |
T080047-x0 |
The review of production drawings for the ALIGO ETM Penultimate Mass: support notes |
Mark Barton et al. |
Document Migration
|
23 Apr 2008 |
T080091-x0 |
Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage |
Mark Barton et al. |
Document Migration
|
21 Apr 2008 |
T060135-x0 |
Design development of the SUS ETM structures |
Mark Barton et al. |
Document Migration
|
14 Mar 2008 |
T060113-x0 |
Welding and cleaning specification for SUS ETM structures |
Mark Barton et al. |
Document Migration
|
14 Mar 2008 |
T050257-x0 |
Quad Pendulum Controls Prototype - Identification of Modes |
Mark Barton |
Document Migration
|
04 Mar 2008 |
T080023-x0 |
Test prism glueing on disc insert plates |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080020-x0 |
ALIGO NP-Type: Preparations of prism bonding at LASTI on 11th - 17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080041-x0 |
ALIGO NP-type - Report on prism bonding at LASTI on 11th -17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T070305-x0 |
ALIGO NP-Type: Report on Ear Bonding at LASTI on 10th -14th December 2007 |
Helena Armandula et al. |
Document Migration
|
16 Jan 2008 |
G070444-x0 |
Production and characterisation of fused silica suspension ribbons for Advanced LIGO - 7th Edoardo Amaldi Conference on Gravitational Waves, July 8 -14 2007, Sydney Australia |
Mark Barton et al. |
Document Migration
|
21 Dec 2007 |
T070298-x0 |
ALIGO NP-Type: Preparations of Ear Bonding at LASTI on 10th -14th December 2007 |
Helena Armandula et al. |
Document Migration
|
06 Dec 2007 |
G070782-x0 |
Overview of pendulum parameter sets of 12/13/06 for TM, ERM and CP |
Mark Barton |
Document Migration
|
07 Nov 2007 |
G070662-x0 |
Update on AdvLIGO UK project - UK perspective - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany |
Mark Barton |
Document Migration
|
29 Oct 2007 |
T070227-x0 |
Torsional modes in suspension fibres/ribbons |
Mark Barton et al. |
Document Migration
|
27 Sep 2007 |
T070138-x0 |
Ribbon/Fibre Length Budget |
Mark Barton et al. |
Document Migration
|
25 Sep 2007 |
E070164-x0 |
Test report on flatness of `B` ears for Advanced LIGO NP-type monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
E070163-x0 |
Test report on `A` ears for Advanced LIGO NP-type monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
T070158-x0 |
Tooling-induced deformation of ears for Advanced LIGO monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
T060088-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM structures using ANSYS workbench |
Mark Barton et al. |
Document Migration
|
07 Aug 2007 |
T060087-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM Structures using ANSYS Classic beam models |
Mark Barton et al. |
Document Migration
|
07 Aug 2007 |
T050255-x0 |
Investigation into Blade Torsion, Blade Lateral Flexibility, and the Effect They Have on Blade and Wire Performance |
Mark Barton et al. |
Document Migration
|
06 Jun 2007 |
G070283-x0 |
Pendulum Modeling in Mathematica and Matlab |
Mark Barton |
Document Migration
|
17 May 2007 |
T070075-x0 |
Nonlinear Pitch Effects and Potential Capsize in the Quad Suspension Noise Prototype |
Mark Barton |
Document Migration
|
29 Mar 2007 |
T060242-x0 |
Characterization and intensity stabilization of a high-power CO2 laser for fiber-pulling |
Mark Barton et al. |
Document Migration
|
13 Nov 2006 |
E030546-x0 |
SPECIFICATION - Suspension Controls Prototype Test Plan |
Mark Barton et al. |
Document Migration
|
25 Oct 2006 |
T050215-x0 |
Monolithic stage conceptual design for Advanced LIGO ETM/ITM |
Helena Armandula et al. |
Document Migration
|
25 Sep 2006 |
T060147-x0 |
Bonding, Ear, Ribbon/Fibre PDR - Response to Committee Report |
Helena Armandula et al. |
Document Migration
|
23 Jun 2006 |
G060086-x0 |
Modeling of the AdvLIGO Quad Pendulum Controls Prototype - LSC Meeting, March 19-22, 2006, Hanford WA |
Mark Barton |
Document Migration
|
14 Apr 2006 |
T050237-x0 |
Advanced LIGO Preliminary Frequency Analysis of the Quadruple Pendulum Controls Prototype (second) Structure |
Mark Barton et al. |
Document Migration
|
13 Apr 2006 |
T060039-x0 |
Caltech controls method for suspending masses |
Mark Barton et al. |
Document Migration
|
10 Apr 2006 |
T060059-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM Structures |
Mark Barton et al. |
Document Migration
|
16 Mar 2006 |
G050496-x0 |
Effect of wire stiffness on pitch modes and correction thereof |
Mark Barton |
Document Migration
|
10 Oct 2005 |
G050442-x0 |
E2E Modeling of Violin Mode - LSC Meeting, August 14th - 17th, Hanford WA |
Mark Barton et al. |
Document Migration
|
19 Aug 2005 |
G050316-x0 |
Update on Aspects of the Suspension Design for Advanced LIGO |
Helena Armandula et al. |
Document Migration
|
28 Jun 2005 |
T030278-x0 |
Advanced LIGO SUS Preliminary Frequency Analysis of the Mode Cleaner Structure |
Mark Barton et al. |
Document Migration
|
07 Apr 2005 |
T050010-x0 |
Monolithic Suspension Workshop (Glasgow Jan 2005): Minutes & Actions |
Helena Armandula et al. |
Document Migration
|
15 Feb 2005 |
G040402-x0 |
AdvLIGO Modecleaner Design and Testing Status - LSC Meeting, August 16th-19th, 2004, Hanford WA |
Mark Barton |
Document Migration
|
20 Aug 2004 |
T040143-x0 |
Cross-coupling in quadruple pendulum suspension |
Mark Barton et al. |
Document Migration
|
10 Aug 2004 |
E021000-x0 |
SPECIFICATION - Earthquake and Safety Stop Design Requirements |
Mark Barton et al. |
Document Migration
|
09 Aug 2004 |
E030513-x0 |
LASTI Prototype Suspension Controller Operation Manual |
Mark Barton |
Document Migration
|
09 Aug 2004 |
T040028-x0 |
Investigation of Wire Lengths in Advanced LIGO Quadruple Pendulum Design for ETM/ITM |
Mark Barton et al. |
Document Migration
|
25 Feb 2004 |
G030385-x0 |
Suspension Eddy Current Damper Assembly |
Mark Barton et al. |
Document Migration
|
12 Sep 2003 |
G030350-x0 |
Triple Update - LSC Meeting, August 18th - 21st, Hannover, Germany |
Mark Barton et al. |
Document Migration
|
09 Sep 2003 |
G020250-x0 |
Advanced LIGO Suspension Model in Mathematica - Elba 2002 |
Mark Barton |
Document Migration
|
30 May 2002 |
G020135-x0 |
Advanced SUS Model in Mathematica - LSC Meeting, March 20 - 23, Livingston LA |
Mark Barton |
Document Migration
|
28 Mar 2002 |
G020029-x0 |
Conceptual Design for Advanced LIGO Suspensions - LSC Meeting, March 20 - 23, Livingston LA |
Mark Barton et al. |
Document Migration
|
28 Mar 2002 |
E970154-x0 |
Component Specification - Large Optics Suspension Balancing |
Mark Barton et al. |
Document Migration
|
25 Apr 2001 |
G010043-x0 |
Status of LIGO - Aspen Winter Conference on Gravitational Waves and Their Detection |
Mark Barton |
Document Migration
|
23 Feb 2001 |
G000328-x0 |
LIGO Seminar 10/27/00: Tuning the LIGO I Suspension Controllers - A Work in Progress |
Mark Barton et al. |
Document Migration
|
20 Nov 2000 |
T000119-x0 |
Use of Magnets in the Suspension Design |
Mark Barton |
Document Migration
|
10 Nov 2000 |
T970189-x0 |
Pitch Adjustment Magnets for LOS and SOS |
Mark Barton |
Document Migration
|
03 Oct 2000 |
T000003-x0 |
Suspension Controller Tuning Procedure, Rev. A |
Mark Barton et al. |
Document Migration
|
18 Sep 2000 |
T970187-x0 |
Surface Vectors for Optics in Local Coordinates |
Mark Barton |
Document Migration
|
29 Jun 2000 |
G000097-x0 |
Methodology for Determining the Sensing and Actuation Matrices of the Test Masses |
Mark Barton et al. |
Document Migration
|
11 May 2000 |
G000073-x0 |
Suspension Diagonalization in LIGO I |
Mark Barton et al. |
Document Migration
|
10 May 2000 |
T990075-x0 |
Proposal of a Seismic Attenuation System (SAS) for the LIGO Advanced Configuration (LIGO-II) |
Mark Barton et al. |
Document Migration
|
22 Dec 1999 |
T990076-x0 |
Answers to "Isolation Criteria for the LIGO-II Seismic Isolation System" (LIGO-E990304-01-D) |
Mark Barton et al. |
Document Migration
|
22 Dec 1999 |
G970130-x0 |
Large Optics Suspension Final Design Review, 25 September 1997 |
Mark Barton et al. |
Document Migration
|
28 Jan 1999 |
T980084-x0 |
Transfer Function and Drift Measurments on First Article HAM |
Mark Barton et al. |
Document Migration
|
23 Oct 1998 |
T970175-x0 |
A Test for Excess Noise in the Hytec Constrained-Layer Coil Springs |
Mark Barton et al. |
Document Migration
|
14 Nov 1997 |
T970158-x0 |
Large Optics Suspension (LOS) Final Design (Mechanical System), Rev. 06 |
Mark Barton et al. |
Document Migration
|
11 Nov 1997 |