Document List by Author
Home
Recent Changes
Topics
Login
Adam Mullavey
of LIGO - Livingston Observatory
is listed as an author on the following documents:
LIGO-Number
Title
Author(s)
Topic(s)
Last Updated
D1800270-v2
H1 ALS X-End Station Optical Table Layout (ISCTEX) - LHO actual installation
Aidan Brooks
et al.
Auxiliary Optics
04 Apr 2024
D1800271-v3
L1 ALS X-End Station Optical Table Layout (ISCTEX) - LLO actual installation
Aidan Brooks
et al.
Auxiliary Optics
04 Apr 2024
E2000162-v1
Review Report Final ISC Design for the A+ Filter Cavity
Daniel Sigg
et al.
Squeezer
30 Mar 2020
D1201103-v16
ISCT1 Optical Layout
Adam Mullavey
et al.
Sensing and Control
Installation
19 Jan 2015
E1900373-v1
Review Report Preliminary ISC Design for the A+ Filter Cavity
Daniel Sigg
et al.
Sensing and Control
09 Jan 2020
E1900223-v1
Review Report Design Requirements and Concept for the A+ ISC Filter Cavity and Relay Optics
Daniel Sigg
et al.
A+
Sensing and Control
15 Nov 2019
D1201448-v9
ISCTEX Optical Layout
Bram Slagmolen
et al.
Sensing and Control
Installation
16 Mar 2015
T0900144-v7
Adv. LIGO Arm Length Stabilization Design
Sam Waldman
et al.
Sensing and Control
Final Design
08 Nov 2018
T1000042-v2
aLIGO ISC Beam Steering - Tip-Tilt Mirror Design
Bram Slagmolen
et al.
Sensing and Control
Final Design
11 Aug 2014
T1700343-v1
Non-Linear Angular Noise Coupling into Differential Arm Length
Brian Seymour
et al.
Sensing and Control
19 Feb 2018
P1600285-v21
Validating gravitational-wave detections: The Advanced LIGO hardware injection system
Christopher Biwer
et al.
Detector
20 Feb 2017
T1400349-v13
Documentation of the Advanced LIGO Hardware Injection Infrastructure
Eric Thrane
et al.
Data analysis software
Data quality / vetoes
Compact Binaries
Continuous Wave
Computing/archiving
Stochastic
GW Bursts
26 Oct 2016
E1500291-x0
aLIGO, INJ
Eric Thrane
et al.
Calibration
Compact Binaries
Continuous Wave
Detector Characterization
Stochastic
GW Bursts
27 Jul 2016
E1500272-v2
ECR: Move HAM6 BDV2 and corresponding V-beam dump to the upstream of QPD sled and beam splitter.
Keita Kawabe
et al.
System Engineering
Sensing and Control
Installation
25 Jun 2015
T1200471-v7
PSL and ALS Mode Matching Solution on ISCT1 for the Half Interferometer (HIFO) Test - OBSOLETE
Alberto Stochino
et al.
Basic R&D
25 Mar 2015
T1500012-v1
L1 OMC Controls
Adam Mullavey
et al.
Sensing and Control
08 Mar 2015
P1400105-v5
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer
Alexa N Staley
et al.
Sensing and Control
Basic R&D
Integration
05 Mar 2015
G1400710-v1
L1 TransMonEY Telescope Focal Tuning Results
Adam Mullavey
et al.
Commissioning
Auxiliary Optics
21 Jan 2015
T1400429-v1
As Built TransMon EY Telescope and Table (L1)
Adam Mullavey
et al.
Sensing and Control
Installation
21 Jan 2015
G1400530-v1
L1 TransMon GREEN QPD sleds tuning (both EX and EY)
Adam Mullavey
et al.
Sensing and Control
Installation
21 Jan 2015
T1100603-v2
TMS Telescope Alignment Procedure
Keita Kawabe
et al.
Installation
Final Design
Auxiliary Optics
17 Nov 2014
D1400372-v1
Simple diagram of ALS optical layout
Adam Mullavey
et al.
Sensing and Control
04 Nov 2014
P1100090-v5
Tip-Tilt Mirror Suspension: Beam Steering for the Advanced LIGO Sensing and Control Signals
Bram Slagmolen
et al.
Sensing and Control
Basic R&D
11 Aug 2014
T1300126-v1
IMC Autolocker
Adam Mullavey
et al.
Commissioning
Sensing and Control
18 Jun 2014
G1300524-v1
The Arm Length Stabilisation System for Advanced LIGO Lock Acquisition
Adam Mullavey
et al.
Commissioning
Sensing and Control
09 Jul 2013
T1300499-v1
ALS mode matching solutions
Kiwamu Izumi
et al.
Sensing and Control
29 May 2013
T0900096-v1
Tip-Tilt Mirror Specifications and Design
Bram Slagmolen
et al.
Sensing and Control
Basic R&D
24 Apr 2012
G0900577-v3
Arm Length Stabilization for Advanced Gravitational Wave Detectors
Daniel Shaddock
et al.
Sensing and Control
Conceptual Design
11 Oct 2009
E080345-x0
Process Traveler - Tip Tilt Steel Parts
Adam Mullavey
Document Migration
22 Nov 2008
E080383-x0
Process Traveler - Tip Tilt Neo35 Magnets
Adam Mullavey
Document Migration
22 Nov 2008
E080495-x0
Process Traveler - LLO OMC Tip Tilts
Adam Mullavey
Document Migration
22 Nov 2008
E080414-x0
Process Traveler - Nickel Plated Screws
Adam Mullavey
Document Migration
22 Nov 2008
E080346-x0
Process Traveler - Tip Tilt Aluminium Parts
Adam Mullavey
Document Migration
22 Nov 2008
E080474-x0
Process Traveler - LLO TT replacement parts
Adam Mullavey
Document Migration
22 Nov 2008
T080139-x0
Adv. LIGO Arm Cavity Pre-Lock Acquisition System
Yoichi Aso
et al.
Document Migration
23 Oct 2008
G080551-x0
Adv. LIGO Arm Length Stabilisation - LSC/Virgo Collaboration Meeting, September 22-25, 2008, Amsterdam
Rana Adhikari
et al.
Document Migration
01 Oct 2008
E080098-x0
Process Traveler - Tip Tilt Suspension Bars
Adam Mullavey
Document Migration
12 May 2008
E080082-x0
Process Traveler - TOSEM Backplate
Adam Mullavey
Document Migration
12 May 2008
E080077-x0
Process Traveler - Socket Cap Screws
Adam Mullavey
Document Migration
25 Apr 2008
Number of documents found: 39
Home
Recent Changes
Topics
Login
DCC
Version 3.4.3
, contact
Document Database Administrators