Document List by Author

Betsy Weaver of LIGO - Hanford Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
E1400310-v2 aLIGO Availability Estimate Dennis Coyne Operations
System Engineering
02 May 2024
D060218-v2 BOSEM Betsy Weaver et al. Preliminary Design
Suspensions
28 Jul 2020
D060217-v1 BOSEM PD Assembly Betsy Weaver Suspensions
28 Jul 2020
D060216-v1 BOSEM IRLED Assembly Betsy Weaver Suspensions
28 Jul 2020
D060117-v1 BOSEM PD Sleeve Betsy Weaver Suspensions
28 Jul 2020
D060116-v1 BOSEM IRLED Sleeve Betsy Weaver Suspensions
09 Mar 2016
D060115-v1 BOSEM IRLED Lens Retainer Betsy Weaver Suspensions
28 Jul 2020
D060114-v1 BOSEM PD Retainer Betsy Weaver Suspensions
28 Jul 2020
D060113-v1 BOSEM IRLED Retainer Betsy Weaver Suspensions
28 Jul 2020
D060112-v1 BOSEM PD Carrier Betsy Weaver Suspensions
28 Jul 2020
D060111-v1 BOSEM IRLED Carrier Betsy Weaver Suspensions
28 Jul 2020
D060110-v1 BOSEM Adjuster Nut Betsy Weaver Suspensions
28 Jul 2020
D060109-v1 BOSEM Adjuster Shaft Betsy Weaver Suspensions
28 Jul 2020
D060107-v1 BOSEM Backplate Betsy Weaver Suspensions
28 Jul 2020
D060106-v1 BOSEM Coilformer Betsy Weaver Suspensions
28 Jul 2020
E2300136-v1 DCN Revised Disc Insert (welding puck) GariLynn Billingsley et al. Fabrication
Suspensions
15 May 2023
E960022-v25 LIGO Clean and Bake Methods and Procedures Betsy Weaver et al. Fabrication
Cleaning
Vacuum
03 May 2023
T060233-v7 BOSEM Assembly Specification Deepali Lodhia et al. Assembly
Suspensions
30 Jun 2022
T070107-v7 BOSEM Test Specification Stuart Aston et al. Commissioning
Suspensions
09 Mar 2016
E1300017-v8 First Contact Spray Application & Removal Procedure Calum Torrie et al. System Engineering
12 Aug 2021
E1400021-v7 Fiber Profile Data Summary Table Angus Bell et al. Suspensions
07 Apr 2014
E0900047-v23 LIGO Contamination Control Plan Betsy Weaver et al. Cleaning
Risk Management
Observatory Facilities
17 Sep 2020
E1000006-v24 Advanced LIGO Quad Suspension Metal-Build Assembly Procedure Joe ODell et al. Assembly
Suspensions
Installation
06 Aug 2020
E0900168-v6 Advanced LIGO OSEM Assembly Specification Bobby Moore et al. Suspensions
25 Apr 2012
T0900286-v3 AOSEM FDD: Advanced LIGO OSEM Final Design Document Bobby Moore et al. Suspensions
10 Jul 2019
T1000489-v9 Specification for LIGO Installation Cleanrooms John Worden et al. Procurements
Installation
01 Aug 2018
E1800029-v1 FTIR Analysis - PCAL Flat Baffle Panels PART 1 Betsy Weaver et al. Installation
15 Feb 2018
G1401291-v3 aLIGO HSTS Damping Loop Design Comparison Jeffrey Kissel et al. Modelling
Sensing and Control
Commissioning
Suspensions
Integration
25 May 2016
G1401290-v1 aLIGO HSTS "Level 2" Damping Loop Design Betsy Weaver et al. Modelling
Sensing and Control
Seismic Isolation
Commissioning
Suspensions
Integration
25 May 2016
E060243-v1 BOSEM Drawing Tree Betsy Weaver Suspensions
09 Mar 2016
E060262-v1 BOSEM Document Change Notice Betsy Weaver Suspensions
09 Mar 2016
T060137-v1 BOSEM Design Change Log Betsy Weaver et al. Suspensions
09 Mar 2016
E1000752-v5 Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) Margot Hennig et al. Suspensions
Installation
08 Mar 2016
G1600326-v1 Inside LIGO - Presented at CSIRO, Lindfield GariLynn Billingsley et al. Public Talk / Colloquium
22 Feb 2016
D1300461-v1 aLIGO PSL Reference Cavity Jodi Fauver et al. Laser Systems
19 Oct 2015
E1500348-v1 ECR: Add faster ASC INMON channels to DAQ Sheila Dwyer et al. Data Acquisition System
Sensing and Control
17 Aug 2015
G1500418-v3 Practical considerations for quad suspension upgrades Brett Shapiro et al. Basic R&D
23 Apr 2015
T1500177-v1 Inspect PUM Ears D090007 Serial number 0128 GariLynn Billingsley et al. Suspensions
17 Apr 2015
E1500024-v1 SUS Handtools List Betsy Weaver Suspensions
07 Apr 2015
Q1500008-v1 Waiver Request from Suspensions - room temp out-gassing cure of EP-30-2 on ITM-Y only Calum Torrie et al. Vacuum
Suspensions
Quality Assurance
System Engineering
11 Mar 2015
Q1500002-v1 Waiver: no bake for the H1 SR3 magnet repair Betsy Weaver Vacuum
Suspensions
Quality Assurance
System Engineering
11 Mar 2015
E1400472-v3 Test Mass In Situ Cleaning Procedure GariLynn Billingsley et al. Core Optics
System Engineering
15 Dec 2014
D0902031-v6 Advanced LIGO, SUS, Top Mass - REACTION CHAIN Joe ODell et al. Suspensions
18 Nov 2014
D1400130-x0 aLIGO SUS BS Final Build Parts and Assemblies Betsy Weaver Suspensions
Installation
06 Oct 2014
T080160-v1 Downtime Accounting in S5 Betsy Weaver et al. Document Migration
28 Jun 2014
E1400255-v2 aLIGO QUAD SUS Mass Weights - all metal assembly Betsy Weaver Assembly
Suspensions
16 Jun 2014
D1400110-x0 Drawing number reserved for 3IFO Assembly kits in ICS Betsy Weaver Suspensions
Installation
01 May 2014
E010126-x0 Document Change Notice (DCN) Betsy Weaver et al. Document Migration
25 Mar 2014
E010088-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
25 Mar 2014
E010083-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
25 Mar 2014
E990035-x0 OBSOLETE - Large Optics and COC`s Cleaning Procedures, Rev. C Betsy Weaver Document Migration
24 Mar 2014
T1300875-v1 LHO Witness plate wafer BSC2 Oct 15, 2013 Betsy Weaver System Engineering
12 Feb 2014
T1300874-v1 LHO Witness plate wafer BSC1 Oct 15, 2013 Betsy Weaver System Engineering
12 Feb 2014
E1100781-v4 BS Wire Length Spreadsheet Betsy Weaver Suspensions
12 Feb 2014
E1300915-v5 Silica Fibre Profile Template Travis Sadecki et al. Fabrication
Suspensions
16 Jan 2014
E1400006-v2 Fiber Profile Data - Doug/Travis Pull Dec 19, 2013 Fiber 1 Angus Bell et al. Suspensions
07 Jan 2014
T1300948-v3 LLO ETMY post-welding pitch value: actions and lessons Norna Robertson et al. Suspensions
Installation
13 Dec 2013
E1000277-v13 Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) Marielle van Veggel et al. Final Design
Suspensions
25 Jul 2013
E1000187-v14 LHO QUAD-3 Assembly Process Traveler Jeffrey Bartlett et al. Assembly
Suspensions
30 Apr 2013
D070219-v3 Advanced LIGO, SUS, Quad N-PType Wiring Harness, Mass Wire Clamp Base Joe ODell et al. Suspensions
29 Apr 2013
F1000008-v9 Quad Suspension Assembly Process Traveler Template Mark Barton et al. Assembly
Fabrication
Suspensions
25 Apr 2013
G1100769-v2 QUAD Testing Outline, Phase 2B Jeffrey Kissel et al. Core Optics
Commissioning
Fabrication
System Test
Suspensions
Subsystem Test
System Engineering
Basic R&D
Auxiliary Optics
25 Mar 2013
E1200888-v1 QUAD Reaction Chain Glass Build Procedure Betsy Weaver Suspensions
Installation
09 Oct 2012
T1200213-v1 ALIGO, SUS, Quad mechanical interference check list Betsy Weaver et al. Suspensions
14 Jul 2012
E010210-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E010209-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E010137-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E010131-x0 Document Change Notice (DCN) Betsy Weaver et al. Document Migration
03 Jul 2012
E010129-x0 Document Change Notice (DCN) Betsy Weaver et al. Document Migration
03 Jul 2012
E010109-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E010107-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E010092-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E010056-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Jul 2012
E000555-x0 Document Change Notice (DCN) for Large Optic Cleaning Procedure Helena Armandula et al. Document Migration
29 Jun 2012
E000460-x0 Small Optic Process Traveler Form, Rev. B Betsy Weaver Document Migration
28 Jun 2012
E990357-x0 Process Traveler Betsy Weaver et al. Document Migration
28 Jun 2012
E990180-x0 Process Traveler Betsy Weaver Document Migration
28 Jun 2012
E990179-x0 Process Traveler Betsy Weaver Document Migration
28 Jun 2012
T1100238-v2 Report on hydroxide catalysis bonding done at LHO in March and April 2011 Marielle van Veggel et al. Core Optics
Suspensions
Installation
02 Aug 2011
M990034-v2 OBSOLETE Richard Savage et al. Operations
Policies
Observatory Facilities
01 Aug 2011
E0900167-v4 Bill of Materials for the ETM / ITM Quad Suspension Assembly (Production) Joe ODell et al. Suspensions
12 Jul 2011
T1100081-v1 Shear strength testing of hydroxide catalysis bonded discs Marielle van Veggel et al. Basic R&D
22 Jun 2011
D080503-v3 ADVANCED LIGO, SUS, THIS, BEAM SPLITTER UPPER STRUCTURE, SHEAR PLATE Joe ODell et al. Suspensions
24 May 2011
D1003126-v1 QUAD 6mm Flag Spacer Betsy Weaver Suspensions
31 Mar 2011
D1003127-v1 QUAD 1/2" Flag Mount Screw Betsy Weaver Suspensions
31 Mar 2011
T1000716-v1 LHO QUAD2 Magnet Strength Measurements Andres Ramirez et al. Suspensions
29 Mar 2011
E1000175-v7 LHO QUAD-1 Assembly Process Traveler Jeffrey Bartlett et al. Suspensions
21 Jan 2011
C1001535-v7 Statement of Work for LIGO Installation Cleanrooms John Worden et al. Procurements
Installation
20 Jan 2011
C1001511-v11 SUS QUAD SOW for Storage Container Fabrication Betsy Weaver Fabrication
Suspensions
27 Oct 2010
D1002222-v7 SUS QUAD Upper Structure Storage Container Betsy Weaver Suspensions
08 Dec 2010
T1000669-v2 LHO BS/FM NdFeB Nickel Plated magnet measurements Andres Ramirez et al. Suspensions
08 Dec 2010
D080249-v1 FLOUREL PUSHER FLOUREL TRIMMER Betsy Weaver et al. Suspensions
07 Oct 2010
D080248-v1 ADJUSTABLE GUIDE FLOUREL TRIMMER Betsy Weaver et al. Suspensions
07 Oct 2010
D1002343-x0 SUS Magnetic Disc - Undersized Betsy Weaver Suspensions
02 Sep 2010
E1000267-v1 LHO FTIR Sampling Form - QUAD Lower Structures D060434 Betsy Weaver Suspensions
12 Aug 2010
E1000217-v1 LHO QUAD Lower Structure FTIR Post Bake, Repeat Betsy Weaver Suspensions
Incoming Inspection
11 Aug 2010
E1000266-v1 LHO FTIR Sampling Form - QUAD Lower Structures D060462 Betsy Weaver Suspensions
11 Aug 2010
C1000615-v11 HSTS Machine Parts SOW Betsy Weaver Procurements
Suspensions
23 Jul 2010
E1000243-v3 SU-312b Drawing table for HSTS machined Parts Alan Wilkins et al. Procurements
23 Jul 2010
C1000271-v8 SU-312a HSTS Structure SOW Betsy Weaver Procurements
Suspensions
08 Jun 2010
E1000107-v1 FTIR: LHO QUAD Pre-Air Bake Lower Structure Set Betsy Weaver Suspensions
11 May 2010
T1000240-v1 AOSEM Set Screw Torque Specification Rich Abbott et al. Suspensions
Basic R&D
06 May 2010
E1000100-v2 FTIR: QUAD Upper and Lower Structures Betsy Weaver Suspensions
08 Apr 2010
G1000024-v2 RAL Structure pictures Sleeve 004, Upper Structure 005 Betsy Weaver Suspensions
04 Mar 2010
D1000135-x0 BLADE CHARACTERIZATION TOOLING - BS/FM ADAPTER Betsy Weaver Suspensions
26 Jan 2010
E0900141-v1 HAM 6 - Tip Tilt Clamps Traveler Betsy Weaver Detector
12 May 2009
E080529-v1 LIGO Aqueous Parts Washer Betsy Weaver Observatory Facilities
24 Mar 2009
E080109-x0 Process Traveler - H1 ETMy magnet swap eLIGO Betsy Weaver Document Migration
22 Nov 2008
E080400-x0 Process Traveler - Misc Tip/Tilt fastener Betsy Weaver Document Migration
22 Nov 2008
E080107-x0 Process Traveler - counterweight fasteners Betsy Weaver Document Migration
22 Nov 2008
E080360-x0 Process Traveler - WHAM6 Beam Dump Hardware Betsy Weaver Document Migration
22 Nov 2008
E080108-x0 Process Traveler - H1 ETMx magnet swap eLIGO Betsy Weaver Document Migration
22 Nov 2008
T080113-x0 INSTALLATION SPECIFICATION - H1 ETMx Realignment After SmCo Magnet Re-installation Betsy Weaver Document Migration
12 May 2008
T080066-x0 INSTALLATION SPECIFICATION - Magnet Swap ETMs - Vent Plan ETMX Betsy Weaver Document Migration
09 May 2008
T080084-x0 INSTALLATION SPECIFICATION - Magnet Swap ETMs - Vent Plan Betsy Weaver Document Migration
09 May 2008
T080053-x0 Comments and Questions and Responses on the BOSEM FDR and FRR, and Responses Betsy Weaver et al. Document Migration
06 Mar 2008
E050153-x0 MMT14K04-1 – Cleaning Specifications Helena Armandula et al. Document Migration
07 Dec 2007
E070009-x0 Process Traveler - PMC glass body/prism Betsy Weaver Document Migration
03 Dec 2007
E060263-x0 Process Traveler - Misc VBO Betsy Weaver Document Migration
03 Dec 2007
E070167-x0 Process Traveler - eLIGO misc. bake load Betsy Weaver Document Migration
30 Nov 2007
E040128-x0 INSTALLATION SPECIFICATION - 2k HAM7 IOO Faraday Isolator and COS Baffle Installation Betsy Weaver et al. Document Migration
19 Jun 2007
T070122-x0 Facilities Modifications and Preparations Conceptual Design Betsy Weaver et al. Document Migration
19 Jun 2007
T070141-x0 LIGO Staging Building Modifications for Conversion to a Cleanroom Facility Betsy Weaver Document Migration
19 Jun 2007
E050120-x0 Process Traveler - Spare LOS Quartz Wire Standoffs Betsy Weaver Document Migration
31 May 2005
E040431-x0 WHAM7/ISCT7 REFL Beam Layout Post June 2004 FI Installation Betsy Weaver et al. Document Migration
21 Apr 2005
T010136-x0 The Input Optics As-Built Description Rana Adhikari et al. Document Migration
19 Apr 2005
E021000-x0 SPECIFICATION - Earthquake and Safety Stop Design Requirements Mark Barton et al. Document Migration
09 Aug 2004
E040223-x0 Document Change Notice (DCN) - WHAM7 IOO Table Layout Betsy Weaver Document Migration
26 May 2004
E030571-x0 Periscope Damper Notes Betsy Weaver Document Migration
03 Dec 2003
E010122-x0 Document Change Notice (DCN) for LHO 4k ETMy Installation and Related Tasks ( E010001-B-W) Larry Jones et al. Document Migration
05 Sep 2003
E020921-x0 Document Change Notice (DCN) for Small Optics Suspension Assembly Specification (E970037-E-D) Betsy Weaver Document Migration
05 Sep 2003
E030344-x0 Document Change Notice (DCN) for Small Optic Suspension Assembly Specification Betsy Weaver Document Migration
05 Sep 2003
T030134-x0 MC Notes from 1999 - Faraday Isolator Alignment Betsy Weaver et al. Document Migration
22 Jul 2003
T030132-x0 MC Notes from 1999 - Mode Cleaner Length Measurement Betsy Weaver et al. Document Migration
22 Jul 2003
E030348-x0 Chamber Component Configuration, WHAM7 June 19, 2003 Betsy Weaver Document Migration
22 Jul 2003
T030133-x0 MC Notes from 1999 - Mode Cleaner Power Measurements Betsy Weaver et al. Document Migration
22 Jul 2003
E030343-x0 Chamber Component Configuration, WBSC1, June 4, 2003 Betsy Weaver Document Migration
24 Jun 2003
E030342-x0 Chamber Component Configuration, WBSC3, June 3, 2003 Betsy Weaver Document Migration
24 Jun 2003
E030340-x0 2k MMT1 Wire Fix, HAM7 Incursion, Rev. A Betsy Weaver Document Migration
23 Jun 2003
E030341-x0 Chamber Component Configuration, WBSC7 Betsy Weaver Document Migration
18 Jun 2003
E010106-x0 Chamber Component Configuration HAM 7 May 18, 2001, Rev. A Stan Whitcomb et al. Document Migration
01 Nov 2002
E010108-x0 Chamber Component Configuration HAM9 May 25, 2001, Rev. A Betsy Weaver Document Migration
01 Nov 2002
G020396-x0 Environmental Disturbances (Including S1-Stoppers) - LSC Meeting, August 19th - 22nd, Hanford WA Betsy Weaver et al. Document Migration
05 Sep 2002
E020715-x0 HAM8 Chamber Component Configuration, July 9, 2002 Betsy Weaver Document Migration
24 Jul 2002
E020717-x0 BSC6 Chamber Component Configuration, April 2001 Betsy Weaver Document Migration
24 Jul 2002
E020712-x0 BSC4 Chamber Component Configuration May 2001 Betsy Weaver Document Migration
24 Jul 2002
E020721-x0 BSC8 Chamber Component Configuration, May 2001 Betsy Weaver Document Migration
24 Jul 2002
T010071-x0 Sensor/Actuator Recording Form for Measurements Taken at Feedthroughs Betsy Weaver Document Migration
12 Nov 2001
E010091-x0 Chamber Component Configuration HAM1 Mar/Apr 2001 Continued, Rev. A Betsy Weaver Document Migration
12 Nov 2001
E000029-x0 Large Optic Process Traveler Form, Rev. B Betsy Weaver et al. Document Migration
12 Nov 2001
E010130-x0 Chamber Component Configuration HAM 9 - 25 May 25 2001 Betsy Weaver Document Migration
26 Jul 2001
E010136-x0 Chamber Component Configuration, BSC 9, Jan 26, 2001 Betsy Weaver Document Migration
26 Jul 2001
E010124-x0 Chamber Component Configuration BSC10, July 5, 2001 Betsy Weaver Document Migration
25 Jul 2001
E010001-x0 Installation Specification - LHO Detector, Y-End Station, In-Chamber < > Installation Betsy Weaver et al. Document Migration
25 Jul 2001
E010082-x0 Chamber Component Configuration HAM2 Mar/Apr 2001 Betsy Weaver Document Migration
30 May 2001
E010087-x0 Chamber Component Configuration HAM1 Mar/Apr 2001 Betsy Weaver Document Migration
30 May 2001
E010084-x0 Chamber Component Configuration HAM2 Mar/Apr 2001 Cont. Betsy Weaver Document Migration
18 May 2001
E010085-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
15 May 2001
G000328-x0 LIGO Seminar 10/27/00: Tuning the LIGO I Suspension Controllers - A Work in Progress Mark Barton et al. Document Migration
20 Nov 2000
E000456-x0 Process Traveler Betsy Weaver Document Migration
17 Oct 2000
E000454-x0 Process Traveler Betsy Weaver Document Migration
17 Oct 2000
E000450-x0 Process Traveler - Large Optic Betsy Weaver Document Migration
17 Oct 2000
E000444-x0 Installation Specification: ETMy In-Situ Cleaning, Rev. A Betsy Weaver et al. Document Migration
03 Oct 2000
E000449-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
03 Oct 2000
T000005-x0 2k FMy Pendulum Q Betsy Weaver et al. Document Migration
29 Sep 2000
E990450-x0 Process Traveler Betsy Weaver Document Migration
15 Aug 2000
E990433-x0 Process Traveler Betsy Weaver Document Migration
15 Aug 2000
E000166-x0 Process Traveler Betsy Weaver Document Migration
15 Aug 2000
E000331-x0 Process Traveler Betsy Weaver Document Migration
08 Aug 2000
E000368-x0 Process Traveler Betsy Weaver Document Migration
08 Aug 2000
E000323-x0 Process Traveler Betsy Weaver Document Migration
08 Aug 2000
E000324-x0 Process Traveler Betsy Weaver Document Migration
08 Aug 2000
E000332-x0 Process Traveler Betsy Weaver Document Migration
08 Aug 2000
E000372-x0 Process Traveler Betsy Weaver Document Migration
08 Aug 2000
E000123-x0 Document Change Notice (DCN) Betsy Weaver Document Migration
21 May 2000
E000117-x0 Installation Specification: ETMy Realignment and Related Tasks Betsy Weaver et al. Document Migration
21 Mar 2000
E990431-x0 Process Traveler: COS Viewports Betsy Weaver Document Migration
01 Mar 2000
E990145-x0 Process Traveler Betsy Weaver Document Migration
01 Mar 2000
E990141-x0 Process Traveler Betsy Weaver Document Migration
01 Mar 2000
E990348-x0 Process Traveler for COS Spare Installation Hardware Betsy Weaver Document Migration
14 Oct 1999

Number of documents found: 180


DCC Version 3.4.3, contact Document Database Administrators