LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G2402406-v1 |
CEBEX program startup |
Michael Zucker |
Vacuum
Cosmic Explorer
Basic R&D
Collaboration
|
20 Nov 2024 |
C2400201-v2 |
Cosmic Explorer Beamtube Experiment (CEBEX) Commercial Items or Services Contract General Provisions |
Dolly Richards et al. |
Procurements
Cosmic Explorer
|
17 Oct 2024 |
D2300135-v4 |
SPECIFICATION CONTROL DRAWING: LIGO, VE, COMFORMANT VIEWPORTS. |
Madeline Lesovsky et al. |
Vacuum
Fabrication
System Engineering
|
27 Aug 2024 |
M1900142-v2 |
Annual project report, NSF PHY-1846142 "Worshop on large ultrahigh vacuum systems" |
Michael Zucker et al. |
Vacuum
NSF
Reports
|
21 Aug 2024 |
P2400360-v1 |
Comments on GWD Vacuum Workshop at CERN, March 27-29 2023 |
Fred Dylla et al. |
Vacuum
Proposals
Basic R&D
Advisory Boards (e.g., PAC, PAP, ...)
Collaboration
NSF
Upgrades
|
21 Aug 2024 |
E1800082-x0 |
Vacuum System |
Dennis Coyne et al. |
Vacuum
|
15 May 2024 |
C050128-x0 |
The LIGO Science Education Center`s Exterior Kinetic Pendulum Wall Exhibit |
Michael Zucker |
Document Migration
|
30 Apr 2024 |
G2300708-v2 |
Vacuum Requirements for 3G Gravitational Wave Antennae |
Michael Zucker |
Vacuum
Upgrades
|
06 Nov 2023 |
Q2300018-v1 |
Waiver: Exceptions to E0900048 for fabrication of custom ported spool |
Eduardo Sanchez et al. |
A+
System Engineering
|
26 May 2023 |
T952011-v1 |
Optical Pathlength Noise in Sensitive Interferometers Due to Residual Gas |
Rainer Weiss et al. |
Requirements
Vacuum
Document Migration
|
24 Apr 2023 |
P940008-x0 |
Measurement of Optical Path Fluctuations due to Residual Gas in the LIGO 40 Meter Interferometer |
Stan Whitcomb et al. |
Document Migration
|
18 Apr 2023 |
E1000046-v1 |
Vacuum System Viton O-ring Procurement Specification |
John Worden et al. |
Vacuum
|
02 Mar 2023 |
M080310-v1 |
Safety Bulletin: Kovar-Sealed Glass Vacuum Viewports |
Michael Zucker |
Document Migration
|
02 Feb 2023 |
D2100303-v1 |
A304 - FCES Elevations - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100302-v1 |
A303 - FCES Elevations - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100298-v1 |
A205 - Filter Cavity End Station - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
M2100169-v2 |
Panel Report LIGO A+ and Virgo AdV+ coating selection for O5 |
Sheila Rowan et al. |
Core Optics
A+
Basic R&D
Upgrades
Technical Review Board
Memorandum
|
04 Aug 2022 |
M2100135-v3 |
LIGO A+ and Virgo AdV+ selection process for O5 Test Mass Coating |
Michael Zucker et al. |
Core Optics
A+
Basic R&D
Upgrades
Technical Review Board
Memorandum
|
04 Aug 2022 |
M2100225-v1 |
Record of Agreement: O5 coating selection for LIGO A+ and Virgo AdV+ |
Michael Zucker et al. |
Core Optics
A+
Basic R&D
Advisory Boards (e.g., PAC, PAP, ...)
Collaboration
Upgrades
Technical Review Board
Memorandum
|
04 Aug 2022 |
D2100346-v1 |
S103 - FC Tube Enclosure B Foundation and Slab Plan - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100301-v1 |
A302 - FCTE Overall Elevations - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100294-v1 |
A200 - Overall Plan - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
D2100345-v1 |
S102 - Filter Cavity End Station FCES Foundation and Slab Plan - APLUS LHO Facilities Construction Drawing Index |
Anthony Simon et al. |
A+
Observatory Facilities
|
16 Nov 2021 |
P1900028-v4 |
Dawn IV: Global strategies for gravitational wave astronomy |
Jess McIver et al. |
Reports
|
15 Nov 2021 |
M1800264-v1 |
A+ Project Execution Plan |
Hannah Hansen et al. |
A+
|
13 Aug 2021 |
E1900261-v6 |
A+ Facility Modification Specification |
Michael Zucker et al. |
Procurements
A+
Observatory Facilities
|
16 Jun 2021 |
E0900398-v5 |
Advanced LIGO residual gas estimate |
Michael Zucker et al. |
Vacuum
|
02 Jun 2021 |
E0900402-v1 |
Specification for SS Plate |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
D0902635-v1 |
Annulus Piping Detail. |
John Worden et al. |
Vacuum
|
16 Sep 2020 |
M000154-x0 |
Technical Evaluation of Alternative Design Concepts for the LIGO-II Seismic Isolation System |
Rich Abbott et al. |
Document Migration
|
16 Jul 2020 |
T1200518-v1 |
Leak localization of the Y arm beamtube at LLO |
Michael Meyer et al. |
Vacuum
System Test
|
06 Jul 2020 |
M2000057-v1 |
Memorandum of Understanding between the US LIGO Laboratory and UK Partners in Advanced LIGO Plus (A+) |
David Reitze et al. |
A+
MOU
|
28 Apr 2020 |
T900007-x0 |
Transmission of Optical Power Transients by Fabry-Perot Cavities: Laser Power Stabilization and Ringdown Measurement Applications, Rev. 01 |
Michael Zucker |
Core Optics
Laser Systems
Basic R&D
Input Optics
|
09 Dec 2019 |
P1900316-v1 |
Cosmic Explorer: The U.S. Contribution to Gravitational-Wave Astronomy beyond LIGO |
David Reitze et al. |
Detector
Activity
Basic R&D
|
11 Oct 2019 |
G0900436-v1 |
eLIGO: So how's it turning out? |
Michael Zucker et al. |
Meeting
Detector
System Test
Integration
Commissioning
Upgrades
Installation
|
30 Jul 2019 |
T1900410-v1 |
Desired results of the Cosmic Explorer engineering study |
Rana Adhikari et al. |
Vacuum
Conceptual Design
Observatory Facilities
|
09 Jul 2019 |
G1900137-v2 |
LIGO Vacuum System Design, Construction, Features and Faults |
Michael Zucker et al. |
Vacuum
NSF
Upgrades
|
30 Apr 2019 |
G1900136-v2 |
Vacuum Requirements for Future Gravitational Wave Interferometers |
Michael Zucker et al. |
Vacuum
NSF
Upgrades
|
30 Apr 2019 |
P1900072-v1 |
Proceedings: NSF Workshop on Large Ultrahigh-Vacuum Systems for Frontier Scientific Research |
Fred Dylla et al. |
Vacuum
Proposals
Basic R&D
Advisory Boards (e.g., PAC, PAP, ...)
Collaboration
NSF
Upgrades
|
20 Mar 2019 |
G1801680-v1 |
Can you get there from here? |
David McClelland et al. |
A+
Proposals
Upgrades
|
31 Aug 2018 |
G1601435-v3 |
Getting an A+: Enhancing Advanced LIGO |
Michael Zucker et al. |
Sensing and Control
Seismic Isolation
Core Optics
Vacuum
A+
Proposals
Basic R&D
Collaboration
Conceptual Design
Suspensions
Squeezer
Observatory Facilities
System Engineering
|
24 Aug 2018 |
T1500202-v1 |
Optimization of beamtube pumping to mitigate acquired water vapor |
Michael Zucker |
Requirements
Vacuum
|
29 Mar 2018 |
G1702159-v2 |
The role of vacuum technology in discovering gravitational waves from merging black holes and neutron stars. |
Michael Zucker et al. |
Vacuum
Public Talk / Colloquium
|
06 Feb 2018 |
G1600769-v5 |
Projected sensitivities towards aLIGO+ |
Lisa Barsotti et al. |
Upgrades
|
07 Jul 2016 |
E021114-x0 |
RFI Mitigation Review Board Report |
Rich Abbott et al. |
Document Migration
|
12 Feb 2016 |
G1300176-v1 |
The LIGO Vacuum Equipment and Beam Tubes: Retrospective and Prospective |
Michael Zucker |
Vacuum
Public Talk / Colloquium
LIGO-India
|
03 Nov 2015 |
T070089-v1 |
Wide angle scatter from LIGO arm cavities |
Michael Zucker et al. |
Basic R&D
Auxiliary Optics
System Engineering
|
19 Oct 2015 |
E070288-x0 |
request for variance on vacuum procedure for IO supermirrors (request for vacuum waiver) |
Michael Zucker |
Document Migration
|
05 Mar 2015 |
T980068-x0 |
Length Sensing & Control Subsystem Final Design |
Detector Isc Grp et al. |
Sensing and Control
Final Design
|
14 Feb 2015 |
L1400202-v1 |
Design Review Report for the Test Mass Discharging System (TMDS) |
Scott McCormick et al. |
Vacuum
Final Design
Reports
Reviews
System Engineering
|
13 Jan 2015 |
P000008-x0 |
Readout and Control of a Power-Recycled Interferometric Gravitational Wave Antenna |
Rolf Bork et al. |
Document Migration
|
09 Dec 2014 |
T010061-x0 |
ISC Electrooptic Shutter: Angle and Temperature Tolerance |
Jameson Graef Rollins et al. |
Sensing and Control
Commissioning
|
14 Aug 2014 |
G990043-x0 |
LASTI Interferometer Facility at MIT: Program to Support LIGO II Upgrades - PAC6 Meeting Presentation, 20-21 May 1999 |
Michael Zucker |
Document Migration
|
16 May 2014 |
G990123-x0 |
MIT Group Roles in LIGO R&D and Construction - Presentation to MIT PAC Meeting, 19 November 1999 |
Michael Zucker |
Document Migration
|
18 Mar 2014 |
G960247-x0 |
LIGO R&D After Recycling/Phase Noise Measurements - Science & Integration Meeting, 12-13 December 1996 |
Gary Sanders et al. |
Document Migration
|
14 Mar 2014 |
G960219-x0 |
Detector Research and Development - NSF Technical Review, 22-24 October 1996 |
Michael Zucker |
Document Migration
|
14 Mar 2014 |
G960183-x0 |
Alignment Sensing/Control Design Requirements Review |
Peter Fritschel et al. |
Document Migration
|
13 Mar 2014 |
G960084-x0 |
Length Sensing & Control Subsystem Design Requirements Review, 30 April 1996 |
Jordan Camp et al. |
Document Migration
|
13 Mar 2014 |
T980121-v1 |
Preliminary results from Livingston VE vibration & acoustic testing |
Michael Zucker |
Vacuum
System Test
|
19 Feb 2014 |
T080067-v1 |
Protecting installed core optics from particulates |
Michael Zucker |
Basic R&D
System Engineering
|
01 Nov 2013 |
|
|
|
None
|
|
G960039-x0 |
Interferometer Sensing & Control |
Michael Zucker |
Document Migration
|
08 May 2013 |
G960038-x0 |
MIT LIGO: Global Functions and Responsibilities |
Michael Zucker |
Document Migration
|
08 May 2013 |
G950116-x0 |
Detector-Vacuum Equipment Interface Issues |
Michael Zucker |
Document Migration
|
03 May 2013 |
G950049-x0 |
Core Optic Wedges |
Michael Zucker |
Document Migration
|
02 May 2013 |
G950011-x0 |
LIGO Vacuum Equipment Scientific Requirements Overview |
Michael Zucker |
Document Migration
|
02 May 2013 |
G940006-x0 |
Auxiliary Laser Alignment System: Layout Exercise |
Michael Zucker |
Document Migration
|
23 Apr 2013 |
G920010-x0 |
Interferometer Description and R&D - Oversight Committee Meeting |
Doug Jungwirth et al. |
Document Migration
|
18 Apr 2013 |
E070124-v3 |
Septum Window Coating Specification |
Lisa Austin et al. |
Auxiliary Optics
Fabrication
|
18 Mar 2013 |
E1000065-v6 |
aLIGO TCS CO2 Laser Specification |
Mindy Jacobson et al. |
Preliminary Design
Auxiliary Optics
Final Design
|
20 Jun 2012 |
E960128-x0 |
LIGO Detector Subsystem Review Report - Preliminary Design Review, Control and Data System (CDS): Control and Monitoring (CM) |
Kent Blackburn et al. |
Document Migration
|
14 Jun 2012 |
E960126-x0 |
LIGO Detector Subsystem Review Report - Design Requirements Review, Physics Environment Monitoring (PEM) |
Rolf Bork et al. |
Document Migration
|
14 Jun 2012 |
E950085-x0 |
Design Requirements Review - Suspension |
Bill Althouse et al. |
Document Migration
|
12 Jun 2012 |
E950005-x0 |
LIGO Detector Subsystem Review Report: Design Requirements Review - Prestabilized Laser (PSL) & PSL Controls |
Alex Abramovici et al. |
Document Migration
|
12 Jun 2012 |
E0900006-v1 |
Review of HAM-ISI "Watchdog" safety software |
Sam Waldman et al. |
Seismic Isolation
Safety
Data Acquisition System
Suspensions
Data and Computing
System Engineering
|
01 Apr 2012 |
D1100053-x0 |
aLIGO TCS HWS Viewport Enclosure Assembly, Y-arm |
Cheryl Vorvick et al. |
Preliminary Design
Vacuum
Auxiliary Optics
Final Design
Fabrication
|
01 Nov 2011 |
D1003193-v3 |
aLIGO TCS Viewport Enclosure Assembly, H2 CO2 Laser Projection |
Cheryl Vorvick et al. |
Preliminary Design
Vacuum
Auxiliary Optics
Final Design
|
22 Aug 2011 |
C1105429-v3 |
SOW: Pilot Test, Vacuum Component Bakeout and Residual Gas Assay |
Richard Bagley et al. |
Procurements
Vacuum
Integration
Fabrication
Cleaning
|
17 Aug 2011 |
G930049-x0 |
Interferometer Topology and Control Systems: Alignment System Specifications - NSF Review, 7-10 June 1993 |
Michael Zucker |
Document Migration
|
22 Jul 2011 |
E0900410-v4 |
Vacuum Component List |
John Worden et al. |
Vacuum
|
21 Mar 2011 |
D1003195-x0 |
aLIGO TCS External Clamping Flange Assembly, CO2 Laser Projection |
Cheryl Vorvick et al. |
Preliminary Design
Vacuum
Auxiliary Optics
Final Design
|
03 Dec 2010 |
E0900411-v4 |
Specification for Vacuum Equipment Design and Fabrication |
John Worden et al. |
Vacuum
|
08 Apr 2010 |
G1000056-v1 |
Intro to LIGO and the role of cleanliness in LIGO vacuum fabrications |
Michael Zucker |
Requirements
Vacuum
Quality Assurance
|
28 Jan 2010 |
E960085-v2 |
Specification for O-Ring Procurement |
John Worden et al. |
Vacuum
Fabrication
|
22 Jan 2010 |
E0900439-v1 |
Specification for SS Bellows |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900431-v1 |
Specification for O-Ring Installation |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900430-v1 |
Specification for Cleanliness Testing |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900429-v1 |
Specification for Raw Material Handling |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
E0900428-v1 |
Specification for Welding Repairs |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
D0902728-v1 |
Tie Rod assembly 1 1/4 inch |
John Worden et al. |
Vacuum
|
12 Jan 2010 |
D0902687-v3 |
External Loads at Mid Station Spool |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
G0901032-v1 |
Photos of LIGO Facility |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D0900928-v2 |
D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO |
John Worden et al. |
Vacuum
Integration
System Engineering
|
11 Jan 2010 |
D0902727-v1 |
Tie Rod assembly 1 inch |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961105-v1 |
Grooved flange 84.25 inch (Ref V0494021) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961104-v1 |
Flange Grooved 72.25 inch (Ref V0494020 ) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D961111-v1 |
Flange 60.5 inch Grooved and Slotted |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
D970409-v1 |
Flange flat faced 60.5 inch (Ref V0494097) |
John Worden et al. |
Vacuum
|
11 Jan 2010 |
E0900408-v1 |
Specification for Welding Inspection. |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900404-v1 |
Specification for Vacuum component leak checking. |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900407-v2 |
Specification for Vacuum component Bake-Out |
John Worden et al. |
Vacuum
|
05 Jan 2010 |
E0900409-v1 |
Specification for Black Light Inspection. |
John Worden et al. |
Vacuum
|
29 Dec 2009 |
E0900403-v2 |
Specification for Vacuum component cleaning. |
John Worden et al. |
Vacuum
|
29 Dec 2009 |
D0902633-v1 |
Sample drawing package |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
D0902636-v1 |
Shipping Cover Air Purification System |
John Worden et al. |
Vacuum
|
07 Dec 2009 |
|
|
|
None
|
|
T070047-x0 |
Considerations for tracer gas in sealed SEI pods |
Michael Zucker |
Document Migration
|
21 Oct 2008 |
E070253-x0 |
ELI Septum Window Assembly and Installation Procedure |
Michael Zucker |
Document Migration
|
20 Nov 2007 |
T070257-x0 |
ELI EQ Stop Retrofit Procedure |
Michael Zucker |
Document Migration
|
20 Nov 2007 |
T070111-x0 |
Trapped volume venting guidelines |
Michael Zucker |
Document Migration
|
04 Jun 2007 |
G070070-x0 |
S5, S6 and S7 - LIGO/VIRGO Scientific Collaborations Meeting, Hilton Capitol Center, Baton Rouge LA, March 19-22, 2007 |
Michael Zucker |
Document Migration
|
27 Mar 2007 |
G060198-x0 |
A Status Report on the LIGO Interferometers -- APS Dallas, April 2006 |
Michael Zucker |
Document Migration
|
30 Nov 2006 |
G060393-x0 |
S5: The Show So Far - LSC Meeting, August 14-17th, 2006 @ Louisiana State University |
Michael Zucker |
Document Migration
|
16 Aug 2006 |
G060031-x0 |
LIGO Listens |
Michael Zucker |
Document Migration
|
08 Mar 2006 |
E050204-x0 |
LSC RFPD Compensation of Photocurrent Detuning Effect |
Rich Abbott et al. |
Document Migration
|
30 Aug 2005 |
G050254-x0 |
S5 Run Performance Goals - PAC 18 Meeting, May 18-19th, 2005 |
Peter Fritschel et al. |
Document Migration
|
19 May 2005 |
G050257-x0 |
The LIGO Science Education Center - PAC 18 Meeting, May 18-19th, 2005 |
Michael Zucker |
Document Migration
|
19 May 2005 |
T050064-x0 |
Thermal Compensation System Description |
Stefan Ballmer et al. |
Document Migration
|
10 May 2005 |
G030564-x0 |
LIGO Detector Performance - NSF Review, November 17th - 20th, Livingston, LA |
Michael Zucker |
Document Migration
|
25 Nov 2003 |
G030429-x0 |
Adv LIGO and retrofit seismic isolation research update - LSC Meeting, August 18th - 21st, Hannover, Germany |
Rich Abbott et al. |
Document Migration
|
14 Oct 2003 |
G030167-x0 |
Adaptive Thermal Compensator Retrofit for Initial LIGO Interferometers |
Ken Mason et al. |
Document Migration
|
10 Apr 2003 |
T030062-x0 |
Thermal Compensator Retrofit for LIGO I |
Ken Mason et al. |
Document Migration
|
10 Apr 2003 |
G030008-x0 |
LIGO Status: Operations and Detector Commissioning - TAMA Symposium |
Michael Zucker |
Document Migration
|
12 Feb 2003 |
G020539-x0 |
EMC Upgrade Cost & Staff Estimates - EMC Upgrade Review |
Michael Zucker |
Document Migration
|
25 Nov 2002 |
E020350-x0 |
EMC, Shielding and Grounding Retrofit Plan |
Jay Heefner et al. |
Document Migration
|
25 Nov 2002 |
E020825-x0 |
ROM Estimate for LIGO EMI Compliance Upgrade |
Michael Zucker |
Document Migration
|
25 Nov 2002 |
E020986-x0 |
LIGO Interferometer Electronics EMC Requirements |
Michael Zucker |
Document Migration
|
25 Nov 2002 |
G020300-x0 |
Lessons from NRAO Green Bank Site Visit |
Jay Heefner et al. |
Document Migration
|
25 Nov 2002 |
G020538-x0 |
LIGO Detector Electromagnetic Compatibility Upgrade - EMC Upgrade Review |
Jay Heefner et al. |
Document Migration
|
25 Nov 2002 |
G020296-x0 |
LIGO Gravitational Wave Detector: Overview & EMI Upgrade Issues |
Michael Zucker |
Document Migration
|
25 Nov 2002 |
T900047-x0 |
Interferometer Noise Caused by Fluctuations in Mirror Pointing (Interim Report) |
Seiji Kawamura et al. |
Document Migration
|
22 Oct 2002 |
T910032-x0 |
Design of Reflection-Locked Laser Frequency Control Systems: Part I, Error Sensing and Feedback Actuators |
Michael Zucker |
Document Migration
|
16 Oct 2002 |
T900032-x0 |
Interferometer Locking Servo Handbook |
Michael Zucker |
Document Migration
|
14 Oct 2002 |
T900033-x0 |
LIGO 40m Prototype Servo System Data Book |
Michael Zucker |
Document Migration
|
14 Oct 2002 |
G020448-x0 |
LIGO Advanced System Test Interferometer |
Michael Zucker |
Document Migration
|
09 Oct 2002 |
T020113-x0 |
H1 Common Mode Wavelength Control Overview |
Michael Zucker |
Document Migration
|
19 Aug 2002 |
G930050-x0 |
Interferometer Topology and Control Systems: Auxiliary Laser Alignment System - NSF Review, 7-10 June 1993 |
Michael Zucker |
Document Migration
|
14 Aug 2002 |
G930019-x0 |
LIGO Systems and System Integration: Interferometer Subsystems, Interfaces, Testing and Integration - NSF Review, 7-10 June 1993 |
Michael Zucker |
Document Migration
|
14 Aug 2002 |
G930017-x0 |
LIGO Systems and System Integration: Initial Interferometer Layout - NSF Review, 7-10 June 1993 |
Michael Zucker |
Document Migration
|
14 Aug 2002 |
T020097-x0 |
High Bandwidth FSS Card |
David Ottaway et al. |
Document Migration
|
24 Jul 2002 |
G020263-x0 |
LASTI Program Update - PAC 12 Meeting at MIT |
Michael Zucker |
Document Migration
|
17 Jul 2002 |
T020077-x0 |
Report of the Seismic Retrofit Review Panel |
Rana Adhikari et al. |
Document Migration
|
09 Jul 2002 |
T020063-x0 |
Informal Test of IR Detection Cards for Optical Table Alignment |
Michael Zucker |
Document Migration
|
07 May 2002 |
G020105-x0 |
LSC Periodic Source Detection & Flux Constraint Group (PULG) - LSC Meeting, March 20 - 23, Livingston LA |
Stuart Anderson et al. |
Document Migration
|
28 Mar 2002 |
G020068-x0 |
LIGO Advanced System Test Interferometer, Program Status Report - LSC Meeting, March 20 - 23, Livingston LA |
Michael Zucker |
Document Migration
|
28 Mar 2002 |
G020069-x0 |
Status Report: Adaptive Thermal Compensation & Determination of Thermophysical Constants - LSC Meeting, March 20 - 23, Livingston LA |
Michael Zucker |
Document Migration
|
28 Mar 2002 |
T010121-x0 |
LSC Photodetector Compensation and Test Procedure |
Michael Zucker |
Document Migration
|
14 Nov 2001 |
E010138-x0 |
LIGO LSC Photodetectors: Test Data Summary |
Michael Zucker |
Document Migration
|
24 Oct 2001 |
G010337-x0 |
Physical Test Signal Injection for End-to-End Pipeline Verification - LSC Meeting August 13 - 16, Hanford WA |
Michael Zucker |
Document Migration
|
17 Aug 2001 |
G010269-x0 |
LIGO Advanced System Test Interferometer (LASTI): Program Status Report - LSC Meeting August 13 - 16, Hanford WA |
Gregg Harry et al. |
Document Migration
|
17 Aug 2001 |
G010094-x0 |
The LIGO Advanced System Test Interferometer (LASTI) - LSC Meeting March 14 -17 2001 Livingston, LA |
Ken Mason et al. |
Document Migration
|
21 Mar 2001 |
G010148-x0 |
Thoughts On Test Signal Injection for UL Algorithm Efficiency & Pipeline Integrity Measurement - LSC Meeting March 14 -17 2001 Livingston, LA |
Michael Zucker |
Document Migration
|
21 Mar 2001 |
G010147-x0 |
Status Report: Adaptive Thermal Compensation & Sapphire Thermophysical Constants - LSC Meeting March 14 -17 2001 Livingston, LA |
Robert Bennett et al. |
Document Migration
|
21 Mar 2001 |
T970078-x0 |
Interferometer Diagnostics Tests and Tools |
David Shoemaker et al. |
Document Migration
|
12 Mar 2001 |
T010019-x0 |
LIGO Engineering Run: Periodic Gravitational Wave Flux Upper Limit Analysis Proposal |
Michael Zucker |
Document Migration
|
08 Mar 2001 |
T010020-x0 |
Core Optics Telecon, December 14, 2000 |
Helena Armandula et al. |
Document Migration
|
28 Feb 2001 |
G010015-x0 |
Adaptive Thermal Compensation Advanced Photodetectors Photon Drive |
Michael Zucker |
Document Migration
|
05 Feb 2001 |
G000203-x0 |
LIGO Advanced System Test Interferometer (LASTI) - Concept, Status, Plans |
Ken Mason et al. |
Document Migration
|
29 Jan 2001 |
G000155-x0 |
The LIGO Interferometer Sensing and Controls Systems - Marcel Grossman IX Meeting |
Michael Zucker |
Document Migration
|
31 Oct 2000 |
T000096-x0 |
Report of the LASTI Technical Advisory Committee: 17 August 2000 Meeting |
Ken Mason et al. |
Document Migration
|
18 Sep 2000 |
E000236-x0 |
Process Traveler - Viewport |
Michael Zucker |
Document Migration
|
15 Aug 2000 |
T970151-x0 |
ASC Initial Alignment Procedures |
Ken Mason et al. |
Document Migration
|
17 Jul 2000 |
T000040-x0 |
Cavity Length Noise Due to Beam Heating in LIGO II (Sapphire) |
Michael Zucker |
Document Migration
|
12 May 2000 |
G000116-x0 |
LIGO II Photodetectors and Adaptive Thermal Lensing Compensation for Core Optics |
Michael Zucker |
Document Migration
|
11 May 2000 |
G000024-x0 |
LIGO II Photodetector Requirements |
Michael Zucker |
Document Migration
|
09 May 2000 |
G000027-x0 |
LIGO Advanced System Test Interferometer (LASTI), Description & Status Report from LSC Meeting, March 16, 2000 |
David Shoemaker et al. |
Document Migration
|
24 Mar 2000 |
T000025-x0 |
LASTI LIGO II Mechanical Subsystems Tests: Objectives and Approach |
David Shoemaker et al. |
Document Migration
|
10 Mar 2000 |
G980049-x0 |
LIGO Science Collaboration (LSC) Meeting Presentations, 12-14 March 1998, Hanford: Detection Confidence & Statistical Analysis |
Lee Samuel Finn et al. |
Document Migration
|
01 Apr 1999 |
T990026-x0 |
Calibration of Optical Levers |
Michael Zucker |
Document Migration
|
22 Mar 1999 |
T990017-x0 |
Calibration of Initial Alignment Survey by Sighting Through Y1 Beam Tube Module |
Michael Zucker |
Document Migration
|
12 Mar 1999 |
G980111-x0 |
Length Sensing/Control Final Design Review (FDR) |
Edward Daw et al. |
Document Migration
|
11 Sep 1998 |
G980109-x0 |
ASC Wavefront Sensing Final Design Review |
Peter Fritschel et al. |
Document Migration
|
11 Sep 1998 |
T980062-x0 |
Spot Check of Glass Viewport Reflectances |
Michael Zucker |
Document Migration
|
07 Jul 1998 |
G980071-x0 |
ASC Initial Alignment Subsystem (IAS) Final Design Review (FDR) |
Peter Fritschel et al. |
Document Migration
|
04 May 1998 |
T980019-x0 |
ASC Initial Alignment Subsystem Final Design |
Ken Mason et al. |
Document Migration
|
28 Apr 1998 |
G980022-x0 |
Photodiodes for Initial and Advanced LIGO - LIGO Science Collaboration (LSC) Meeting, Hanford - 12-14 March 1998 |
Peter Csatorday et al. |
Document Migration
|
25 Mar 1998 |
G970192-x0 |
Length Sensing and Control (LSC) Subsystem Preliminary Design Review (PDR) |
Peter Fritschel et al. |
Document Migration
|
31 Jul 1997 |
T960126-x0 |
Magnet Size Considerations; Interference and Coil Power Dissipation |
Michael Zucker |
Document Migration
|
23 Jul 1997 |
T890034-x0 |
LIGO Support Facilities |
Alex Abramovici et al. |
Document Migration
|
22 Jul 1997 |
T890033-x0 |
Report on the LIGO Receivers/Facilities Interface - Electrical and Optical Feedthroughs for Phase A Vacuum Chambers |
Robert Spero et al. |
Document Migration
|
22 Jul 1997 |
T970122-x0 |
Length Sensing and Control (LSC) Subsystem Preliminary Design |
Peter Fritschel et al. |
Document Migration
|
22 Jul 1997 |
T890050-x0 |
Preliminary Report on Shark Sensor/Transducer Development |
Michael Zucker |
Document Migration
|
22 Jul 1997 |
E960098-x0 |
LIGO Detector Subsystem Review Report: Preliminary Design Review (PDR), Suspension System (SUS) |
Alex Abramovici et al. |
Document Migration
|
16 Jul 1997 |
T880062-x0 |
Zeroth Pass at `Receiver/Facility Interface` Questions |
Michael Zucker |
Document Migration
|
30 Jun 1997 |
T890010-x0 |
Updated Plan for Separate Suspension of Beamsplitter Components in the 40m Prototype |
Michael Zucker |
Document Migration
|
30 Jun 1997 |
T910011-x0 |
40m Vacuum System Backfill Checklist |
Michael Zucker |
Document Migration
|
06 Jun 1997 |
T900006-x0 |
Analog Visibility Monitor and Cavity Resonance Discriminator |
Michael Zucker |
Document Migration
|
06 Jun 1997 |
T910002-x0 |
MIT Electronic Circuit Designs |
Michael Zucker |
Document Migration
|
05 Jun 1997 |
T900002-x0 |
LIGO 40m Prototype Servo System Data Book |
Michael Zucker |
Document Migration
|
05 Jun 1997 |
T890006-x0 |
The Initial Report of the Caltech 40m Prototype Design Team |
Alex Abramovici et al. |
Document Migration
|
05 Jun 1997 |
G970152-x0 |
LIGO @ MIT: Transition to Operations and Advanced Detector R & D |
Michael Zucker |
Document Migration
|
02 Jun 1997 |
T970060-x0 |
Alignment Sensing/Control (ASC) Preliminary Design |
Peter Fritschel et al. |
Document Migration
|
24 Feb 1997 |
T960030-x0 |
Data Analysis Scenario and Data Flow Paradigm |
Kent Blackburn et al. |
Document Migration
|
24 Feb 1997 |
T960031-x0 |
CDS Online Diagnostic and Readout Functions |
Michael Zucker |
Document Migration
|
24 Feb 1997 |
T960183-x0 |
Impact of Anomalous N2 Outgassing from Viton Seals |
Michael Zucker |
Document Migration
|
30 Dec 1996 |
T960159-x0 |
ASC/IOO Interface and Design Support |
Michael Zucker |
Document Migration
|
04 Oct 1996 |
T960149-x0 |
Concept and Estimated Cost for Upgraded MIT R&D Vacuum System |
Michael Zucker |
Document Migration
|
12 Sep 1996 |
T960134-x0 |
Alignment Sensing/Control Conceptual Design. |
Peter Fritschel et al. |
Document Migration
|
26 Aug 1996 |
T920003-x0 |
Test Mass Suspension and Control Concept for Initial LIGO Receivers |
Seiji Kawamura et al. |
Document Migration
|
25 Jul 1996 |
T960122-x0 |
Proposed Initial Detector MC and RC Baseline Lengths |
Peter Fritschel et al. |
Document Migration
|
25 Jul 1996 |
T960038-x0 |
LSC Photodetector Development |
Michael Zucker |
Document Migration
|
19 Jul 1996 |
E960027-x0 |
Report on the Design Requirements Review Core Optics Components |
Jordan Camp et al. |
Document Migration
|
12 Jun 1996 |
T960027-x0 |
Length Sensing and Control Subsystem Conceptual Design Description |
Jordan Camp et al. |
Document Migration
|
20 May 1996 |
E960026-x0 |
LIGO Detector Subsystem Review Report - Design Requirements Review CDS Control and Monitoring |
Bill Althouse et al. |
Document Migration
|
17 May 1996 |
T950126-x0 |
Conversation with Kleinschmidt of Cambridge Acoustical Associates |
Michael Zucker |
Document Migration
|
18 Dec 1995 |
G950075-x0 |
Technical Updates to Vacuum Equipment Design |
Michael Zucker |
Document Migration
|
10 Oct 1995 |
G950074-x0 |
Vacuum Equipment Science Requirements |
Michael Zucker |
Document Migration
|
09 Oct 1995 |
T950093-x0 |
Ham Isolation Stay-Clear |
Michael Zucker |
Document Migration
|
26 Sep 1995 |
T950050-x0 |
Response to LIGO-T950048-00-O regarding Crane Hook Height in LVEA/VEA |
Michael Zucker |
Document Migration
|
25 Jul 1995 |
T920001-x0 |
LIGO Interferometer Conceptual Design Handbook, Version 2.0 |
Science Team et al. |
Document Migration
|
23 Oct 1992 |
T880039-x0 |
Proposed Power Handling and Reflectivity Tests of Mode Cleaner Mirrors |
Michael Zucker |
Document Migration
|
18 Nov 1988 |
T880010-x0 |
Comments and Additions to "Control Systems and Data Analysis for Large Gravitational Detectors" (LIGO-T880009-00-R) |
Michael Zucker |
Document Migration
|
21 Jul 1988 |
T880023-x0 |
Zeroth Pass at "Receiver/Facility Interface" Questions |
Michael Zucker |
Document Migration
|
16 Jun 1988 |