LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
G1200916-v1 |
Suspension systems for the AEI 10 m prototype |
Alan Cumming et al. |
Preliminary Design
Suspensions
|
05 Nov 2024 |
E2300136-v1 |
DCN Revised Disc Insert (welding puck) |
GariLynn Billingsley et al. |
Fabrication
Suspensions
|
15 May 2023 |
D080117-v1 |
Penultimate Mass, ETM Quad |
Russell Jones |
Final Design
Fabrication
Suspensions
|
14 Feb 2020 |
D060149-v3 |
aLIGO_SUS_CO2 Laser Machine_Spinning Mirror Assembly_[CO2_GLA_ASM_04] |
Russell Jones |
Assembly
Fabrication
Suspensions
|
15 Jan 2020 |
D1800134-v1 |
CO2 Laser Pulling Machine_Alignment Plate 2 |
Russell Jones et al. |
Fabrication
Basic R&D
|
09 Jul 2019 |
D060152-v3 |
aLIGO_SUS_CO2 Laser Machine_PULL_Assembly_[CO2_GLA_ASM_07] |
Russell Jones |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
D1800133-v1 |
CO2 Laser Pulling Machine_Alignment Plate 1 |
Russell Jones et al. |
Fabrication
Basic R&D
|
09 Jul 2019 |
D1001504-v5 |
aLIGO SUS ETM ITM Monolithic Assembly_Fibre Cartridge Assembly |
Russell Jones et al. |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
D070551-v2 |
aLIGO SUS ETM/ITM Monolithic Assembly_ Fuse Jig |
Russell Jones |
Preliminary Design
Fabrication
Suspensions
Basic R&D
|
09 Jul 2019 |
D1000575-v2 |
ALIGO_SUS_CO2 Laser Machine_Dovetail Clamp Interface Assembly [CO2_GLA_ASM_11] |
Russell Jones et al. |
Fabrication
Suspensions
|
09 Jul 2019 |
D060150-v2 |
aLIGO_SUS_CO2 Laser Machine_Conical Mirror FEED Assembly_[CO2_GLA_ASM_05] |
Russell Jones |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
D060148-v1 |
aLIGO_SUS_CO2 Laser Machine_Horizontal Drive Unit_[CO2_GLA_ASM_03] |
Russell Jones |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
D060147-v2 |
aLIGO_SUS_CO2 Laser Machine_Motor Drive Assembly_[CO2_GLA_ASM_02] |
Russell Jones |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
D060146-v1 |
ALIGO_SUS_CO2 Laser Machine_Twin Ballscrew and Support Frame_[CO2_GLA_ASM_01] |
Russell Jones |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
D070560-v2 |
ALIGO SUS CO2 Laser Machine_Overall Assembly_[CO2_GLA_ASM_OVERALL] |
Russell Jones et al. |
Assembly
Fabrication
Suspensions
|
09 Jul 2019 |
G1800845-v1 |
Cryogenic suspensions for future gravitational wave detectors |
Marielle van Veggel et al. |
Conceptual Design
Suspensions
Basic R&D
|
16 May 2018 |
E1000278-v7 |
Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) |
Margot Hennig et al. |
Final Design
Suspensions
|
28 Aug 2012 |
G1701240-x0 |
Glasgow speed meter proof-of-principle experiment update |
Sean Leavey et al. |
Basic R&D
|
09 Jul 2017 |
T1000017-v1 |
Monolithic Test Hang Procedure Notes |
Matthew Maxwell et al. |
Suspensions
Subsystem Test
|
12 Apr 2017 |
D1000760-v4 |
Advanced LIGO SUS ITM Production Monolithic Assembly |
Russell Jones et al. |
Assembly
Final Design
Suspensions
|
19 Jul 2016 |
D1000759-v3 |
Advanced LIGO SUS ETM Production Monolithic Assembly |
Russell Jones et al. |
Assembly
Final Design
Suspensions
|
12 Jul 2016 |
G1601144-v1 |
Factors pertaining to the strength of four-fiber monolithic silica test mass suspensions |
Kirill Tokmakov et al. |
Suspensions
|
19 May 2016 |
E1000752-v5 |
Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) |
Margot Hennig et al. |
Suspensions
Installation
|
08 Mar 2016 |
D080116-v2 |
End Reaction Mass (ERM) |
Russell Jones |
Final Design
Suspensions
|
02 Sep 2015 |
D080201-v1 |
IGR MKII Strength Testing Machine_Pivot Test Assembly |
Russell Jones |
Suspensions
Basic R&D
|
20 Apr 2015 |
D080200-v1 |
IGR MKII Strength Testing Machine_Worm Wheel Drive Assembly |
Russell Jones |
Suspensions
Basic R&D
|
20 Apr 2015 |
D080199-v1 |
IGR MKII Strength Testing Machine_Load Cell Pull Assembly |
Russell Jones |
Suspensions
Basic R&D
|
20 Apr 2015 |
D080198-v1 |
IGR MKII Strength Testing Machine_Drive_Pull Module |
Russell Jones |
Suspensions
Basic R&D
|
20 Apr 2015 |
D080197-v2 |
IGR MKII Strength Testing Machine |
Russell Jones |
Suspensions
Basic R&D
|
20 Apr 2015 |
D080188-v1 |
IGR Strength Testing Machine Design (2002)_Interface Pulling Plate |
Russell Jones |
Suspensions
Basic R&D
|
20 Apr 2015 |
E1000036-v38 |
SUS Drawing Tracker |
Bobby Moore et al. |
Reports
Suspensions
|
17 Apr 2015 |
D1002147-v1 |
aLIGO BS/FM Prism bonding jig |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Dec 2013 |
D1002153-v3 |
aLIGO BS/FM Prism holder |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Dec 2013 |
D1002149-v1 |
aLIGO BS/FM Prism bonding baseplate |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Nov 2013 |
D1002151-v3 |
aLIGO BS/FM Prism bonding support cylinder |
Marielle van Veggel et al. |
Suspensions
Installation
|
11 Nov 2013 |
G1300798-v1 |
Photographic and Ultra-Fast Video Imaging of Fracture of Pristine Silica Glass Fibers |
Kirill Tokmakov et al. |
Suspensions
|
26 Jul 2013 |
E1000277-v13 |
Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) |
Marielle van Veggel et al. |
Final Design
Suspensions
|
25 Jul 2013 |
D1000128-v3 |
Penultimate mass prism holder for D0901592 bonding jig |
Marielle van Veggel et al. |
Preliminary Design
Suspensions
|
18 Jul 2013 |
D1001623-v2 |
aLIGO ETM/ITM penultimate mass prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
18 Jul 2013 |
D020677-v3 |
Library of Clamps (HSTS/OMCS) |
Michael Meyer |
Final Design
Suspensions
|
17 Apr 2013 |
D1102247-v1 |
ALIGO SUS CO2 Laser Machine_Spinning Mirror Assembly_Stage to Clamp Coupling Piece |
Russell Jones et al. |
Assembly
Fabrication
Suspensions
|
20 Dec 2012 |
D080750-v1 |
aLIGO SUS ERM/TCP Wire Break-off Prism |
Russell Jones et al. |
Assembly
Final Design
Suspensions
|
27 Aug 2012 |
D1101017-v3 |
aLIGO SUS ETM ITM MONOLITHIC CENTRAL PROTECTIVE FIN ASSEMBLY |
Russell Jones |
Final Design
Suspensions
|
02 May 2012 |
D070391-v1 |
ALIGO SUS ETM NP-type (Glass Mass) Ear Bonding Jig GA (General Arrangement) |
Russell Jones |
Document Migration
|
13 Mar 2012 |
D1102245-v1 |
ALIGO SUS CO2 Laser Machine_Spinning Mirror Assembly_Stage to Mirror Assembly Coupling |
Russell Jones et al. |
Assembly
Fabrication
Suspensions
|
28 Nov 2011 |
T1000345-v2 |
The Design of the IGR MKII Strength Testing Machine |
Russell Jones et al. |
Suspensions
Basic R&D
|
11 Oct 2011 |
D0900957-v1 |
ALIGO SUS ETM/ITM monolithic assembly - spring clamp for weld mirror on weld hub |
Giles Hammond et al. |
Preliminary Design
|
09 Sep 2011 |
G1100720-v1 |
Breaking tests of fused silica fibers conducted with high speed photography and video imaging. |
Kirill Tokmakov et al. |
Suspensions
|
10 Jul 2011 |
G1100719-v1 |
Tools for GEO-600 test mass repair suspension. |
Kirill Tokmakov et al. |
Suspensions
|
10 Jul 2011 |
T010103-v1 |
aLIGO Suspension System Conceptual Design |
Russell Jones et al. |
Conceptual Design
Suspensions
|
09 Jun 2011 |
G0900791-v1 |
Flame welding tests for monolithic suspension of a 40-kg test mass (as backup for Advanced LIGO) |
Giles Hammond et al. |
Suspensions
|
17 May 2011 |
D080389-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Bearing holder |
Russell Jones et al. |
Assembly
Preliminary Design
Fabrication
Suspensions
|
21 Apr 2011 |
D080036-v4 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Welding Shelf |
Russell Jones |
Assembly
Fabrication
Suspensions
|
24 Mar 2011 |
D1002152-v1 |
aLIGO BS/FM Prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002150-x0 |
aLIGO BS/FM Prism bonding alignment guide |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002146-v1 |
aLIGO TCP/ERM Prism holder |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002142-v2 |
aLIGO TCP Prism bonding baseplate |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002141-v2 |
aLIGO TCP Prism bonding fixture |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002144-v1 |
aLIGO TCP Prism bonding support cylinder |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002143-v1 |
aLIGO TCP Prism bonding alignment guide |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002140-v2 |
aLIGO TCP Prism bonding jig |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002203-v2 |
aLIGO ERM Prism bonding baseplate |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002145-v1 |
aLIGO TCP/ERM Prism holder assembly |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002288-v1 |
aLIGO ERM prism bonding support cylinder |
Marielle van Veggel et al. |
Final Design
Suspensions
|
09 Mar 2011 |
D1002202-v2 |
aLIGO ERM Prism bonding fixture |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D1002201-v2 |
aLIGO ERM Prism bonding jig |
Marielle van Veggel et al. |
Suspensions
Installation
|
09 Mar 2011 |
D0900373-v2 |
ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub |
Giles Hammond et al. |
Suspensions
Installation
Basic R&D
|
08 Mar 2011 |
D080390-v4 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_3-hole Plate |
Russell Jones et al. |
Assembly
Preliminary Design
Fabrication
Suspensions
|
07 Mar 2011 |
D080396-v4 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Micrometer Interface Boss |
Russell Jones et al. |
Assembly
Preliminary Design
Fabrication
Suspensions
|
07 Mar 2011 |
D080394-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_Crossbar |
Russell Jones et al. |
Assembly
Preliminary Design
Fabrication
Suspensions
|
07 Mar 2011 |
D080393-v5 |
aLIGO SUS ETM ITM Monolithic Assembly Tooling_Welding Scaffold_C-section side piece |
Russell Jones et al. |
Assembly
Preliminary Design
Fabrication
Suspensions
|
07 Mar 2011 |
D070077-v2 |
Proof bounce tester top plate |
Russell Jones et al. |
Suspensions
|
01 Mar 2011 |
D1002105-v2 |
aLIGO SUS UK PROOF BOUNCE TESTER BASEPLATE |
Russell Jones et al. |
Suspensions
|
01 Mar 2011 |
D1002082-v1 |
aLIGO SUS UK PROOF TESTER |
Russell Jones et al. |
Suspensions
|
28 Feb 2011 |
D080048-v3 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Articulated Arm_Connector |
Russell Jones |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D080046-v2 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Side wall |
Russell Jones |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D070075-v2 |
Proof bounce tester joint for clevis pin |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D1002071-v1 |
aLIGO SUS UK PROOF BOUNCE TESTER 15KG PROOF MASS |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D1002069-v1 |
aLIGO SUS UK PROOF BOUNCE TESTER DOOR |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D1002067-v1 |
aLIGO SUS UK PROOF BOUNCE TESTER ENCLOSURE |
Russell Jones et al. |
Suspensions
|
25 Feb 2011 |
D080047-v2 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo Box_sunroof |
Russell Jones |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D080045-v1 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_baseplate |
Russell Jones et al. |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D080044-v1 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Galvo Holder |
Russell Jones |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D080041-v2 |
aLIGO SUS_Monolithic Assembly_CO2 Laser Welding_Galvo box_Mounting bracket |
Russell Jones |
Assembly
Fabrication
Suspensions
|
25 Feb 2011 |
D080669-v2 |
aLIGO 40kg (Mock Silica sized) Aluminium Mass |
Russell Jones |
Assembly
Fabrication
Suspensions
Basic R&D
|
24 Feb 2011 |
D060189-v3 |
ERM ESD PATTERN |
Kurt Buckland et al. |
System Engineering
|
14 Oct 2009 |
D1002291-v1 |
aLIGO TCP/ERM Prism holder fixing screw |
Marielle van Veggel et al. |
Suspensions
Installation
|
21 Oct 2010 |
D1002290-v1 |
aLIGO TCP/ERM Prism holder alignment bush |
Marielle van Veggel et al. |
Suspensions
Installation
|
21 Oct 2010 |
D1002289-v1 |
aLIGO TCP/ERM Prism holder alignment screw |
Marielle van Veggel et al. |
Suspensions
Installation
|
21 Oct 2010 |
D1001803-v1 |
aLIGO SUS CO2 Laser Machine Welding Galvo Box_Side Wall 2 |
Russell Jones |
Conceptual Design
Suspensions
|
06 Oct 2010 |
E1000273-v1 |
Design document for PM wire break-off prisms |
Ken Strain et al. |
Final Design
Suspensions
|
02 Sep 2010 |
T1000472-v1 |
Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension |
Marielle van Veggel et al. |
Suspensions
Installation
|
26 Aug 2010 |
T0900586-v1 |
Proof load test and vertical bounce frequency test apparatus for ITM/ETM silica suspension fibres |
Ken Strain et al. |
Final Design
Suspensions
|
26 Aug 2010 |
D1001633-v1 |
aLIGO ETM/ITM ear bonding jig - T-piece |
Russell Jones |
Suspensions
Installation
|
04 Aug 2010 |
T080245-v1 |
ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI |
Russell Jones et al. |
Suspensions
Subsystem Test
|
13 Jul 2010 |
T0900629-v2 |
Response to questions from the review panel on the Final Design Review of the ETM/ITM ears |
Giles Hammond et al. |
Final Design
Suspensions
|
17 Dec 2009 |
T0900278-v2 |
ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 |
Giles Hammond et al. |
System Test
Suspensions
|
02 Jul 2009 |
G0900586-v1 |
Flame welding tests for monolithic suspensions of the mirrors of future GW interferometers. |
Giles Hammond et al. |
Suspensions
Basic R&D
|
19 Jun 2009 |
G0900507-v2 |
Overview of monolithic suspension work for Advanced LIGO |
Timothy Bodiya et al. |
Suspensions
Basic R&D
|
19 Jun 2009 |
T0900203-v2 |
Assembly procedure of monolithic part of the suspension for advanced LIGO |
Giles Hammond et al. |
Preliminary Design
|
09 Jun 2009 |
T0900211-x0 |
Welding tests at Glasgow (5-8 May 2009) |
Marielle van Veggel et al. |
Final Design
Suspensions
|
06 May 2009 |
T0900055-v1 |
Rehang of the Quad NP with glass masses but metal wires (January 12-23 2009) |
Douglas Cook et al. |
Suspensions
|
29 Apr 2009 |
E080112-v1 |
Component Specification: ITM Penultimate Mass |
Russell Jones |
Final Design
Fabrication
Suspensions
|
16 Mar 2009 |
E080090-v1 |
Component Specification: ETM Penultimate Mass |
Russell Jones |
Final Design
Fabrication
Suspensions
|
16 Mar 2009 |
D080128-v1 |
Penultimate Mass, ITM Quad |
Russell Jones |
Final Design
Fabrication
Suspensions
|
16 Mar 2009 |
E080172-v1 |
DCN: ETM and ITM Quad Penultimate Mass drawings and specifications |
Russell Jones |
Final Design
Change Control
Suspensions
|
02 Mar 2009 |
E080171-v1 |
DCN: ALIGO SUS ETM QUAD End Reaction Mass (ERM) Drawing & Specification |
Russell Jones |
Final Design
Change Control
Suspensions
|
02 Mar 2009 |
E080089-v1 |
Component Specification: ETM QUAD End Reaction Mass (ERM) |
Russell Jones |
Final Design
Suspensions
|
02 Mar 2009 |
T080048-v2 |
The Review of Production Drawings for the ALIGO ETM Quad End Reaction Mass: Support Notes |
Ken Strain et al. |
Final Design
System Test
Suspensions
|
27 Feb 2009 |
T080326-v1 |
A Strategy to Prove and Provide Monolithic Suspensions |
Giles Hammond et al. |
Suspensions
|
20 Feb 2009 |
D080701-x0 |
Advanced LIGO, SUS, Monolithic Assembly, Confirmation of Tooling Holes |
Russell Jones |
Document Migration
|
05 Nov 2008 |
T080239-x0 |
Report on R. Jones visit to MIT (4th-9th August 2008) as part of NP-type Monolithic Assembly Activity |
Alastair Heptonstall et al. |
Document Migration
|
07 Oct 2008 |
T080152-x0 |
Questions preliminary design review of silica masses for advanced LIGO |
Mark Barton et al. |
Document Migration
|
20 Jun 2008 |
T080098-x0 |
UK Glass masses FDR overview document |
Russell Jones et al. |
Document Migration
|
03 Jun 2008 |
T080047-x0 |
The review of production drawings for the ALIGO ETM Penultimate Mass: support notes |
Mark Barton et al. |
Document Migration
|
23 Apr 2008 |
D070279-x0 |
ADVANCED LIGO SUS ETM PENULTIMATE MASS METAL WIRE STAND-OFF |
Russell Jones |
Document Migration
|
22 Apr 2008 |
D070504-x0 |
ALIGO SUS ETM Reaction Mass (ERM) Bonding Template |
Russell Jones |
Document Migration
|
22 Apr 2008 |
D070505-x0 |
ALIGO SUS ETM Reaction Mass (ERM) ERM Prism holder_bonding |
Russell Jones |
Document Migration
|
22 Apr 2008 |
D060166-x0 |
Advanced LIGO SUS N-Ptype Reaction Test Mass Break-off Prism |
Russell Jones |
Document Migration
|
22 Apr 2008 |
D070507-x0 |
ALIGO SUS ETM NP-type Reaction Mass (ERM) ERM Prism Bonding Jig |
Russell Jones |
Document Migration
|
22 Apr 2008 |
T080091-x0 |
Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage |
Mark Barton et al. |
Document Migration
|
21 Apr 2008 |
G080220-x0 |
Update on Bonding Ears and Prisms to the Test Masses for LASTI - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Helena Armandula et al. |
Document Migration
|
04 Apr 2008 |
T060135-x0 |
Design development of the SUS ETM structures |
Mark Barton et al. |
Document Migration
|
14 Mar 2008 |
T060113-x0 |
Welding and cleaning specification for SUS ETM structures |
Mark Barton et al. |
Document Migration
|
14 Mar 2008 |
T080023-x0 |
Test prism glueing on disc insert plates |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080020-x0 |
ALIGO NP-Type: Preparations of prism bonding at LASTI on 11th - 17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
T080041-x0 |
ALIGO NP-type - Report on prism bonding at LASTI on 11th -17th February 2008 |
Helena Armandula et al. |
Document Migration
|
26 Feb 2008 |
E060235-x0 |
Document Change Notice (DCN) - Advanced LIGO SUS N-Ptype ETM QUAD Penultimate and Reaction Masses |
Russell Jones |
Document Migration
|
25 Jan 2008 |
T080006-x0 |
Laboratory layout during ear bonding at LASTI |
Helena Armandula et al. |
Document Migration
|
17 Jan 2008 |
T070305-x0 |
ALIGO NP-Type: Report on Ear Bonding at LASTI on 10th -14th December 2007 |
Helena Armandula et al. |
Document Migration
|
16 Jan 2008 |
G070444-x0 |
Production and characterisation of fused silica suspension ribbons for Advanced LIGO - 7th Edoardo Amaldi Conference on Gravitational Waves, July 8 -14 2007, Sydney Australia |
Mark Barton et al. |
Document Migration
|
21 Dec 2007 |
T070298-x0 |
ALIGO NP-Type: Preparations of Ear Bonding at LASTI on 10th -14th December 2007 |
Helena Armandula et al. |
Document Migration
|
06 Dec 2007 |
T070138-x0 |
Ribbon/Fibre Length Budget |
Mark Barton et al. |
Document Migration
|
25 Sep 2007 |
E070164-x0 |
Test report on flatness of `B` ears for Advanced LIGO NP-type monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
E070163-x0 |
Test report on `A` ears for Advanced LIGO NP-type monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
T070158-x0 |
Tooling-induced deformation of ears for Advanced LIGO monolithic suspension |
Mark Barton et al. |
Document Migration
|
18 Sep 2007 |
T060088-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM structures using ANSYS workbench |
Mark Barton et al. |
Document Migration
|
07 Aug 2007 |
T060087-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM Structures using ANSYS Classic beam models |
Mark Barton et al. |
Document Migration
|
07 Aug 2007 |
T060262-x0 |
Accommodation of Glasgow CO2 laser fibre pulling & welding machine at LASTI for noise prototype installation – site visit October 2006 |
Caroline Cantley et al. |
Document Migration
|
20 Nov 2006 |
T060022-x0 |
Early tests on a bonded ear/welded fibre assembly |
Caroline Cantley et al. |
Document Migration
|
07 Nov 2006 |
E060234-x0 |
Document Change Notice (DCN) - ADVANCED LIGO SUS N-Ptype Electrostatic Drive Evaporation Mask |
Russell Jones |
Document Migration
|
25 Oct 2006 |
T050215-x0 |
Monolithic stage conceptual design for Advanced LIGO ETM/ITM |
Helena Armandula et al. |
Document Migration
|
25 Sep 2006 |
T060147-x0 |
Bonding, Ear, Ribbon/Fibre PDR - Response to Committee Report |
Helena Armandula et al. |
Document Migration
|
23 Jun 2006 |
T030137-x0 |
ETM Controls Prototype: Mass Estimate of an ETM Suspension Layout |
Caroline Cantley et al. |
Document Migration
|
13 Apr 2006 |
T050237-x0 |
Advanced LIGO Preliminary Frequency Analysis of the Quadruple Pendulum Controls Prototype (second) Structure |
Mark Barton et al. |
Document Migration
|
13 Apr 2006 |
T060039-x0 |
Caltech controls method for suspending masses |
Mark Barton et al. |
Document Migration
|
10 Apr 2006 |
T060059-x0 |
Finite Element Analysis of Advanced LIGO SUS ETM Structures |
Mark Barton et al. |
Document Migration
|
16 Mar 2006 |
T050171-x0 |
Selection of Aluminum Alloys for Use on Advanced LIGO UK Parts |
Dennis Coyne et al. |
Document Migration
|
02 Dec 2005 |
T050214-x0 |
Concept for variable load clamp for ETM/ITM monolithic assembly |
Caroline Cantley et al. |
Document Migration
|
18 Oct 2005 |
T050206-x0 |
Production and characterization of synthetic fused silica ribbons for Advanced LIGO suspensions |
Gianpietro Cagnoli et al. |
Document Migration
|
18 Oct 2005 |
T050207-x0 |
Optical profiling device for dimensional characterization of ribbons/fibres |
Gianpietro Cagnoli et al. |
Document Migration
|
18 Oct 2005 |
T040213-x0 |
Update on development of a CO2 laser machine for pulling and welding silica fibres and ribbons |
Gianpietro Cagnoli et al. |
Document Migration
|
18 Oct 2005 |
T050211-x0 |
Bonded ear strength tests (serial number 0001, 0002 and 0011 to 0014) |
Helena Armandula et al. |
Document Migration
|
18 Oct 2005 |
G050316-x0 |
Update on Aspects of the Suspension Design for Advanced LIGO |
Helena Armandula et al. |
Document Migration
|
28 Jun 2005 |
G050187-x0 |
ADVANCED LIGO SUS ETM STRUCTURAL DESIGN SUMMARY - LSC Meeting, March 20-23, 2005, Livingston LA |
Caroline Cantley et al. |
Document Migration
|
07 Apr 2005 |
T030278-x0 |
Advanced LIGO SUS Preliminary Frequency Analysis of the Mode Cleaner Structure |
Mark Barton et al. |
Document Migration
|
07 Apr 2005 |
T040214-x0 |
Advanced LIGO Parameters for Current ETM/ITM Main Chain Noise Prototype Design |
Helena Armandula et al. |
Document Migration
|
14 Dec 2004 |
T040080-x0 |
Advanced LIGO Catcher Jig Product Design Specification for the ETM Controls Prototype |
Caroline Cantley et al. |
Document Migration
|
14 Sep 2004 |
T040084-x0 |
Advanced LIGO ETM Controls Prototype Catcher Jig: Design Brief |
Caroline Cantley et al. |
Document Migration
|
14 Sep 2004 |
G040433-x0 |
Development of a CO2 laser machine for pulling and welding of silica fibres and ribbons (GR17 presentation) |
J Bogenstahl et al. |
Document Migration
|
02 Sep 2004 |
T040016-x0 |
ADVANCED LIGO SUS QUAD ETM CONTROLS PROTOTYPE TASK SUMMARY |
Caroline Cantley et al. |
Document Migration
|
26 Aug 2004 |
T030125-x0 |
Controls Prototype: - Library of Clamps for the Cantilever Blades in the Mode Cleaner Suspension. |
Russell Jones et al. |
Document Migration
|
25 Aug 2004 |
D030123-x0 |
SPACER FOR COIL FORMER BRACKET |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D030710-x0 |
Coil Former Clamp One Piece Alt |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D030264-x0 |
Damper Arm |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D030263-x0 |
Copper Sleeve |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D020188-x0 |
Coil Former |
Janeen Romie et al. |
Document Migration
|
04 Aug 2004 |
D020225-x0 |
Coil Assembly |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D030183-x0 |
COIL FORMER CLAMP ONE PIECE |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D030269-x0 |
Blade Damper Assembly |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D030122-x0 |
SHOULDER FOR COIL FORMER BRACKET |
Russell Jones et al. |
Document Migration
|
04 Aug 2004 |
D020215-x0 |
small catcher for lower blades |
Russell Jones et al. |
Document Migration
|
03 Aug 2004 |
D020282-x0 |
Coil Former Bracket |
Russell Jones et al. |
Document Migration
|
03 Aug 2004 |
T040091-x0 |
Brief Summary of Visit to LIGO (Caltech), November 9th - 24th, 2003 |
Russell Jones |
Document Migration
|
25 May 2004 |
T040015-x0 |
Advanced LIGO SUS Controls Prototype Mass Catcher Research: Process Diagram for Use of the GEO600 Mass Catcher |
Russell Jones |
Document Migration
|
07 May 2004 |
E030568-x0 |
Mass Catcher Design for Mode Cleaner Controls Prototype - Product Design Specification |
Russell Jones |
Document Migration
|
07 May 2004 |
E040017-x0 |
Mass Catcher Design for the Mode Cleaner Controls Prototype |
Russell Jones |
Document Migration
|
07 May 2004 |
T040004-x0 |
Review of the GEO 600 Blade Eddy Current Damper |
Russell Jones et al. |
Document Migration
|
03 May 2004 |
T030273-x0 |
Case Study: Using ANSYS to Predict the Lowest Flexural Internal Mode Frequency of the MC and RM Upper Blades |
Russell Jones et al. |
Document Migration
|
03 May 2004 |
T030257-x0 |
Discussion: Supply of COILS and ASSOCIATED PARTS FOR THE LASTI CONTROLS PROTOTYPES |
Russell Jones et al. |
Document Migration
|
04 Nov 2003 |
D030713-x0 |
Glasgow `fullscale` sapphire optic |
Russell Jones |
Document Migration
|
29 Oct 2003 |
T030242-x0 |
Advanced LIGO SUS Summary of Cantilever Blade Wire Clamp Testing |
Caroline Cantley et al. |
Document Migration
|
09 Oct 2003 |
T030223-x0 |
Review of basic shorting tests on Coil Formers D020188-04 and D020188-08 |
Russell Jones et al. |
Document Migration
|
07 Oct 2003 |
T030220-x0 |
ADVANCED LIGO SUSPENSIONS, VISIT TO RUTHERFORD APPLETON LABORATORY, MAY 2002 |
Russell Jones et al. |
Document Migration
|
07 Oct 2003 |
G030384-x0 |
Update and Status on the Controls Prototype Local Control Coil for the MC and RM Suspension |
Helena Armandula et al. |
Document Migration
|
12 Sep 2003 |