LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
D1900281-v3 |
FDS-SQZ optics table layouts |
Lee McCuller |
Preliminary Design
Squeezer
A+
|
09 Jan 2020 |
E1900149-v3 |
MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley |
Auxiliary Optics
A+
|
04 Aug 2020 |
T1900279-v2 |
Filter Cavity Optics Substrates |
Lee McCuller et al. |
Core Optics
A+
|
03 Aug 2020 |
T1800447-v7 |
Design Requirement Document of the A+ filter cavity and relay optics for frequency dependent squeezing |
Lee McCuller et al. |
A+
|
03 Aug 2020 |
D1900066-v3 |
A+ HAM8 84in Cover |
Don Griffith |
A+
|
16 Aug 2019 |
D1900059-v3 |
A+ HAM7 84in Cover |
Don Griffith |
A+
|
16 Aug 2019 |
E1900237-v4 |
In vacuum active elements and electronics for frequency-dependent squeezing |
Lee McCuller et al. |
Squeezer
A+
|
14 Nov 2019 |
D1800027-v25 |
Top Level Conceptual Layout of A+ |
Calum Torrie et al. |
System Engineering
Operations
A+
|
15 Nov 2019 |
E1900148-v2 |
MIRROR POLISH SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley |
Auxiliary Optics
A+
|
21 Oct 2019 |
G1901510-v1 |
A+ Beamsplitter material long lead review |
GariLynn Billingsley |
Core Optics
Requirements
A+
|
20 Aug 2019 |
G1901469-v1 |
A+ ISC review: DRD and conceptual design |
Lee McCuller et al. |
A+
|
15 Aug 2019 |
E1900147-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY INPUT MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
E1900146-v1 |
MIRROR BLANK SPECIFICATION, A+ FILTER CAVITY END MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
D1900146-v1 |
MIRROR BLANK DRAWING, A+ FILTER CAVITY, END MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
D1900147-v1 |
MIRROR BLANK DRAWING, A+ FILTER CAVITY, INPUT MIRROR |
GariLynn Billingsley et al. |
Auxiliary Optics
A+
|
07 Jun 2019 |
E1900159-v1 |
Satellite Box Noise Analysis |
Rich Abbott et al. |
A+
|
04 Jun 2019 |
D1900133-v2 |
A+, LAND USE PERMIT BOUNDARY MAP |
Eduardo Sanchez |
System Engineering
A+
|
08 May 2019 |
D1900069-v6 |
A+, GENERAL ARRANGEMENT DRAWING (H1) |
Eduardo Sanchez |
A+
|
10 Apr 2019 |
T1800042-v5 |
The A+ design curve |
Lisa Barsotti et al. |
Conceptual Design
A+
|
11 Oct 2018 |
G1801680-v1 |
Can you get there from here? |
David McClelland et al. |
Proposals
Upgrades
A+
|
31 Aug 2018 |
G1601435-v3 |
Getting an A+: Enhancing Advanced LIGO |
Michael Zucker et al. |
Conceptual Design
Vacuum
System Engineering
Proposals
Observatory Facilities
Squeezer
Suspensions
Core Optics
Sensing and Control
Seismic Isolation
A+
Basic R&D
Collaboration
|
24 Aug 2018 |