Document List by Author

Fabrice Matichard of LIGO - Massachusetts Institute of Technology is listed as an author on the following documents:
(List events moderated by Fabrice Matichard)

LIGO-Number Title Author(s) Topic(s) Last Updated
D0900857-v2 GS-13 Pod Assembly, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
23 Mar 2010
D047820-v3 L4C Seismometer Pod Assembly Fabrice Matichard Seismic Isolation
Final Design
20 Feb 2010
D047823-v5 D047823- L4C Vacuum Chamber top Fabrice Matichard Seismic Isolation
Final Design
30 Apr 2010
D047822-v5 D047822 L4C chamber baseplate Fabrice Matichard Seismic Isolation
Final Design
30 Apr 2010
E1100997-x0 aLIGO HAM-ISI, Phase II Testing Reports Fabrice Matichard Seismic Isolation
Subsystem Test
10 May 2023
E1100996-x0 aLIGO HAM-ISI, Phase I Testing Reports Fabrice Matichard Seismic Isolation
Subsystem Test
10 May 2023
E1200685-v6 aLIGO BSC-ISI , "Common Documentation" (List of all DCC trees, wikis, and general documentation) Fabrice Matichard et al. Seismic Isolation
17 Apr 2023
D1500295-v4 OPO Suspension (OPOS, VOPO, VIP) Overall Assembly Drawing Fabrice Matichard et al. Basic R&D
Squeezer
12 Sep 2022
E1500359-v1 aLIGO, SQZ Lisa Barsotti et al. Squeezer
17 Mar 2022
E1100989-x0 aLIGO BSC-ISI, Phase I Testing Reports (Assembly Validation) Fabrice Matichard Seismic Isolation
Subsystem Test
12 Jan 2022
T1000388-v17 aLIGO SEI Actuators and Sensors Change of Basis (Transformation, Orientation, Matrix) Fabrice Matichard et al. Seismic Isolation
07 Dec 2021
E0900385-v2 BSC-ISI Mass Budget Fabrice Matichard Seismic Isolation
Final Design
17 Nov 2021
D080177-v4 Compensation Plate ESD Pattern Drawing Kurt Buckland et al. Sensing and Control
Core Optics
Preliminary Design
08 Oct 2021
E080187-x0 Enhanced LIGO ISI Installation into LHO HAM6 Chamber Hazard Analysis Stephany Foley et al. Document Migration
13 May 2008
E1200104-v6 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 3 Celine Ramet et al. Seismic Isolation
23 Jul 2021
E1100786-x0 aLIGO SEI Instruments Testing Reports and Tracking Lists Fabrice Matichard Seismic Isolation
Subsystem Test
23 Jun 2021
E1600168-x0 aLIGO, SQZ, OPOS Suspension (VOPO, VIP) Fabrice Matichard et al. Final Design
Squeezer
29 Mar 2021
E1300815-x0 SEI Controls Document Hub Brian Lantz et al. Seismic Isolation
Final Design
26 Mar 2021
D1500494-v3 1" Mirror Mount,LH,3.5" Beam Height, OFI, aLIGO Assembly Fabrice Matichard Auxiliary Optics
Final Design
24 Mar 2021
E1000309-v13 aLIGO HAM-ISI Testing Procedure, Phase I: Assembly Validation Fabrice Matichard et al. Seismic Isolation
Subsystem Test
27 Feb 2013
E1600171-x0 aLIGO, SQZ, VOPO Cavity Fabrice Matichard et al. Final Design
Squeezer
23 Nov 2020
E1500362-v11 aLIGO, SQZ, Electronics Block Diagram Lisa Barsotti et al. Final Design
Squeezer
06 Feb 2017
E1500358-v2 aLIGO, SQZ, Preliminary Design Documents Lisa Barsotti et al. Preliminary Design
Squeezer
03 Nov 2020
P1000029-v5 Prototyping, Testing and Performance of the Two-Stage Seismic Isolation System for Advanced LIGO Gravitational Wave Detectors Fabrice Matichard Seismic Isolation
Public Talk / Colloquium
17 Jul 2020
G1600930-v2 An overview of the control layers in LIGO 4km interferometers Fabrice Matichard Sensing and Control
Public Talk / Colloquium
03 Jun 2020
P1600104-v2 AN OVERVIEW OF THE CONTROL LAYERS IN LIGO 4KM INTERFEROMETERS Fabrice Matichard et al. Detector
03 Jun 2020
P1200040-v55 Seismic Isolation of Advanced LIGO: Review of Strategy, Instrumentation, and Performance (CQG 2015) Fabrice Matichard et al. Seismic Isolation
Basic R&D
03 Sep 2019
E1600165-v1 VOPO Suspension - Conceptual Design Study Alvaro Fernandez-Galiana et al. Thesis/Dissertation
Squeezer
24 Oct 2018
E1200686-v2 aLIGO HAM-ISI, "Common Documentation" (List of all DCC trees, wikis, and general documentation) Fabrice Matichard et al. Seismic Isolation
22 Oct 2018
D1500297-v8 SQZ in-air optics table Lisa Barsotti et al. Basic R&D
Squeezer
30 Aug 2018
P1200011-v6 Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement Fabrice Matichard et al. Seismic Isolation
Basic R&D
20 Jun 2018
G0900676-v3 Advanced LIGO Preliminary Design Review of the BSC ISI system - Overview Presentation Stephany Foley et al. Seismic Isolation
Preliminary Design
Reviews
20 Jun 2018
G1200910-v4 aLIGO Seismic Isolation Status Update Celine Ramet et al. Seismic Isolation
Public Talk / Colloquium
20 Jun 2018
E1200684-x0 aLIGO, SEI Fabrice Matichard et al. Seismic Isolation
27 Nov 2017
E1700072-v6 Timeline for the aLIGO squeezing upgrade at LLO Lisa Barsotti et al. Upgrades
26 Sep 2017
E1500361-x0 aLIGO, SQZ, VOPO Lisa Barsotti et al. Preliminary Design
Squeezer
17 Apr 2017
E1500467-v1 aLIGO, SQZ, Viewports John Miller et al. Vacuum
Squeezer
28 Dec 2016
P1500278-v4 Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor Krishna Venkateswara et al. Seismic Isolation
Basic R&D
14 Dec 2016
E1600081-v2 Notes on Output Faraday Isolator Installation and Final Alignment Procedure Koji Arai et al. Auxiliary Optics
Subsystem Test
11 Mar 2016
E1600080-v1 AOS/ISC SQZ: Output Faraday Isolator Test Report (LLO) Koji Arai et al. Sensing and Control
Auxiliary Optics
Subsystem Test
Squeezer
08 Mar 2016
D1201327-v1 Rotate dual suspended seismometer short osc platform iso, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
02 Mar 2016
D1201269-v1 Dual suspended seismometer short osc platform iso, Dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
02 Mar 2016
E1100369-v35 aLIGO BSC/HAM-ISI CPS - List of Sensors, Electonics and Units on which they are Installed Eric Quintero et al. Seismic Isolation
Subsystem Test
09 Nov 2015
D0901182-v1 aLIGO, SEI, BSC-ISI, Top Assembly Stephany Foley et al. Seismic Isolation
Final Design
12 Aug 2015
E0900376-v1 HAM Cross Beams Modal Testing Andy Stein et al. Seismic Isolation
Subsystem Test
02 Aug 2015
G1500698-v1 Summary of Controls Sessions (GWADW 2015) Dennis Coyne et al. System Engineering
01 Jun 2015
G1500663-v1 GWADW Controls Sessions Introduction Dennis Coyne et al. System Engineering
01 Jun 2015
G1500454-v1 Controls Workshop at the GWADW 2015 Dennis Coyne et al. Detector
Public Talk / Colloquium
01 Jun 2015
E1200687-v3 aLIGO HEPI, "Common Documentation" (List of all DCC trees, wikis, and general documentation) Fabrice Matichard et al. Seismic Isolation
01 May 2015
T0900301-v1 PSI Actuator Test Plan Fabrice Matichard System Test
03 Apr 2015
E1200690-x0 aLIGO HEPI, "Units" and "Pumping Stations" Acceptance Fabrice Matichard et al. Seismic Isolation
31 Mar 2015
E1200689-v1 aLIGO HAM-ISI, "Units" Acceptance Fabrice Matichard et al. Seismic Isolation
31 Mar 2015
E1200688-v1 aLIGO BSC-ISI, "Units" Acceptance Fabrice Matichard et al. Seismic Isolation
31 Mar 2015
E1100276-v15 aLIGO HEPI Testing Documentation Sebastien Biscans et al. Seismic Isolation
Subsystem Test
25 Mar 2015
E1000486-v6 aLIGO BSC-ISI Testing Procedure, Phase I: Assembly Validation Vincent Lhuillier et al. Seismic Isolation
Subsystem Test
16 Mar 2015
E1000487-v8 aLIGO BSC-ISI Testing Procedure, Phase II : Integration process Fabrice Matichard et al. Seismic Isolation
Subsystem Test
16 Mar 2015
E1300823-v4 aLIGO HEPI H1 HAM1 Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
10 Mar 2015
E1300824-v3 aLIGO HEPI Assembly Validation Procedure Sebastien Biscans et al. Seismic Isolation
Subsystem Test
03 Mar 2015
E1200103-v3 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 4 (Unit #4) James Thomas et al. Seismic Isolation
Subsystem Test
17 Feb 2015
E1200507-v5 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1200506-v4 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1300454-x0 aLIGO HEPI Testing Reports Fabrice Matichard et al. Seismic Isolation
Subsystem Test
12 Feb 2015
E1300838-v1 aLIGO HEPI H1 ITMX Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
12 Feb 2015
E1300839-v1 aLIGO HEPI H1 BS Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
11 Feb 2015
E1300840-v1 aLIGO HEPI H1 ITMY Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
11 Feb 2015
E1300841-v2 aLIGO HEPI H1 ETMY Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
09 Feb 2015
E1300830-v1 aLIGO HEPI H1 HAM4 Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
05 Feb 2015
E1300831-v1 aLIGO HEPI H1 HAM5 Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
04 Feb 2015
E1300832-v1 aLIGO HEPI H1 HAM6 Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
03 Feb 2015
D1002892-v14 aLIGO Flange Layout Document v14 Fabrice Matichard et al. Preliminary Design
System Engineering
19 Jan 2015
E0900389-v1 BSC-ISI, Stage 1 analysis Fabrice Matichard Seismic Isolation
Final Design
10 Jan 2015
T0900226-v1 ISI actuator dynamic response identification Sam Barnum et al. Seismic Isolation
Basic R&D
09 Jan 2015
E1100427-v4 aLIGO SEI Testing, HAM-ISI, Results Compilation Hugo Paris et al. Seismic Isolation
Subsystem Test
05 Nov 2014
E1000330-v3 aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #6 Fabrice Matichard et al. Seismic Isolation
Subsystem Test
26 Oct 2014
E1000331-v3 aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #7 Fabrice Matichard et al. Seismic Isolation
Subsystem Test
26 Oct 2014
E1000329-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #5 (HAM5) Celine Ramet Seismic Isolation
Subsystem Test
23 Oct 2014
E1200106-v2 aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 5 Fabrice Matichard Seismic Isolation
23 Oct 2014
E1100703-x0 Useful Documents for SEI Testing and Commissioning Fabrice Matichard Seismic Isolation
Subsystem Test
08 Oct 2014
E1000304-v3 aLIGO SEI Testing and Commissioning Documentation Fabrice Matichard et al. Seismic Isolation
Subsystem Test
16 Sep 2014
E1300829-v2 aLIGO HEPI H1 HAM3 Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
16 Jul 2014
E1300828-v2 aLIGO HEPI H1 HAM2 Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
16 Jul 2014
T1200482-v2 aLIGO SEI / SUS Watchdog Design Jeffrey Kissel et al. Seismic Isolation
System Test
Integration
Data Acquisition System
Final Design
Suspensions
Installation
System Engineering
10 Jul 2014
G1000125-v9 aLIGO BSC-ISI, HAM-ISI, and HEPI Basis and Naming Conventions Jeffrey Kissel et al. Seismic Isolation
Vacuum
Installation
Observatory Facilities
18 Jun 2014
E1300837-v1 aLIGO HEPI H1 ETMX Assembly Validation Report Hugo Paris et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1300825-v1 aLIGO HEPI Control Implementation Procedure Sebastien Biscans et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100993-x0 aLIGO BSC-ISI, LHO BSC-6 (H2-ETMY) Testing Reports Fabrice Matichard Seismic Isolation
Subsystem Test
18 Jun 2014
E1100992-x0 aLIGO BSC-ISI, LHO BSC-8 (H2-ITMY) Testing Reports Fabrice Matichard Seismic Isolation
Subsystem Test
18 Jun 2014
E1100991-x0 aLIGO BSC-ISI, Phase III Testing Reports (Control Commissioning) Fabrice Matichard Seismic Isolation
System Test
18 Jun 2014
E1100990-x0 aLIGO BSC-ISI, Phase II Testing Reports (Integration process) Fabrice Matichard Seismic Isolation
Subsystem Test
18 Jun 2014
E1100281-x0 aLIGO BSC-ISI First Article Testing at LASTI Fabrice Matichard Seismic Isolation
Subsystem Test
18 Jun 2014
E1300155-v6 aLIGO HAM-ISI, Phase III Testing report (Control Commissioning), LLO HAM 3 Ryan DeRosa et al. Seismic Isolation
Subsystem Test
18 Jun 2014
E1100998-x0 aLIGO HAM-ISI, Phase III Testing Reports Fabrice Matichard Seismic Isolation
Subsystem Test
18 Jun 2014
E1200107-v1 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LLO HAM 6 Fabrice Matichard Seismic Isolation
18 Jun 2014
E1200105-v4 aLIGO HAM-ISI, Pre-integration Test Report, Phase II, LLO HAM 2 Fabrice Matichard et al. Seismic Isolation
18 Jun 2014
E1000324-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) Hugo Paris et al. Seismic Isolation
Subsystem Test
18 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Assembly
Seismic Isolation
Requirements
Subsystem Test
18 Jun 2014
E1100231-v1 aLIGO BSC-ISI Capacitance Position Sensor Testing Fabrice Matichard Seismic Isolation
Subsystem Test
18 Jun 2014
E0900357-v28 aLIGO BSC-ISI, General Assembly Procedure Michael Hillard et al. Assembly
Seismic Isolation
18 Jun 2014
E1000338-v4 Vibration Absorber : Final Design Review Sebastien Biscans et al. Basic R&D
Suspensions
20 May 2014
D0902801-v2 Shoulder Screw, L4C pod Fabrice Matichard Seismic Isolation
Final Design
13 May 2014
G1400032-v1 Advanced LIGO Seismic Isolation Brochure Fabrice Matichard Seismic Isolation
Education, Outreach
12 Jan 2014
E1000323-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) Hugo Paris et al. Seismic Isolation
Subsystem Test
05 Nov 2013
E1000311-v9 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 Hugo Paris et al. Seismic Isolation
Final Design
26 Jun 2013
D1300555-x0 Square bottom plate for POD for regular T240 Alix Carbajo et al. Seismic Isolation
Conceptual Design
13 Jun 2013
D1300554-x0 Square tubing for POD for regular T240 Alix Carbajo et al. Seismic Isolation
Conceptual Design
13 Jun 2013
D1300553-x0 Square top plate for POD for regular T240 Alix Carbajo et al. Seismic Isolation
Conceptual Design
13 Jun 2013
D1300552-x0 Square POD for regular T240 Alix Carbajo et al. Seismic Isolation
Conceptual Design
13 Jun 2013
E1000488-v2 aLIGO BSC-ISI Testing Procedure, Phase III: Control Commissioning Vincent Lhuillier et al. Seismic Isolation
Final Design
23 Apr 2013
E1100995-v10 aLIGO HAM-ISI Testing Procedure, Phase III: Control Commissioning Sebastien Biscans et al. Seismic Isolation
Subsystem Test
23 Apr 2013
E1100994-v6 aLIGO HAM-ISI Testing Procedure, Phase II : Integration process Fabrice Matichard et al. Seismic Isolation
Subsystem Test
23 Apr 2013
D1300353-x0 Square mass 0.166 kilograms Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300351-v1 Wire clamp on the frame Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300301-v1 Wire clamp on the frame part 2 Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300352-v2 Wire clamp on the frame steel part Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300299-v1 Wire clamp on the frame part 1 Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300316-v1 Wire clamp on the suspension steel part Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300298-v1 Wire clamp on the suspension part 2 Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300297-v1 Wire clamp on the suspension part 1 Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300315-v1 Wire clamp on the suspension Alix Carbajo et al. Seismic Isolation
Conceptual Design
18 Apr 2013
D1300318-v1 Square mass 0.628 kilograms Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300317-v1 Plate for CG Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300307-v1 Round mass for the picomotor 0.104 kilograms Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300293-v1 Suspended seismometer platform Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300304-v1 Stop for rotation of the suspension Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300303-v1 Foot supporting the frame Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300296-v1 POD attachment Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
D1300295-v1 Picomotor attachment Alix Carbajo et al. Seismic Isolation
Conceptual Design
04 Apr 2013
E1300257-x0 DCN for Suspended seismometer platform D1300293 Alix Carbajo et al. Seismic Isolation
Final Design
04 Apr 2013
D1300313-x0 Wire for suspension Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300312-x0 Bar to attach the POD - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 2.25'' Length Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300311-x0 External horizontal bar for left and right - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 13'' Length Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300310-x0 Vertical bar - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 9.5'' Length Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300309-x0 Horizontal bar for front and back - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 12.5'' Length Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300308-x0 Internal horizontal bar for left and right - Aluminum Inch T-Slotted Framing System Four-Slot Single, 1-1/2" Hollow Extrusion, 9'' Length Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300306-v1 Round mass 0.333 kilograms Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1300305-v1 Round mass 0.778 kilograms Alix Carbajo et al. Seismic Isolation
Conceptual Design
03 Apr 2013
D1201328-v1 Dual suspended seismometer platform iso, Dual suspended seismometer platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201326-v1 Upper insulation assembly, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201325-v1 Upper insulation top, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201324-v1 Upper insulation narrow, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201323-v1 Upper insulation wide, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201322-v1 Lower insulation narrow, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201321-v1 Lower insulation wide, Rotate dual suspended seismometer short osc platform iso Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201302-v1 Bumper Plate, Rotate dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201270-v1 Internal platform, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201268-v1 Dual suspended seismometer platform, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201265-v1 Base plate, Dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201264-v1 Moving plate, Dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201257-v1 Rotate dual suspended seismometer short osc platform, Rotate dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201256-v1 External top plate, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201255-v1 Supporting structure, Rotate dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201254-v1 Moving top, Rotate dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201253-v1 Base, Rotate dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201241-v1 Base plate reinforcing plate, Dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201240-v1 Split shaft, Dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201239-v1 Side clamp element, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201238-v1 Bottom clamp, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1201237-v1 Top clamp, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
24 Feb 2013
D1300169-x0 Internal lower bar Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
22 Feb 2013
D1300168-x0 Internal upper bar Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
22 Feb 2013
D1300167-x0 Upper Plate Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
22 Feb 2013
D1300166-x0 Middle Plate Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
22 Feb 2013
D1300164-x0 Lower Plate Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
22 Feb 2013
D1300163-x0 Magnetic Weight Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300162-x0 Move Mass 3 Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300161-x0 Move Mass 2 Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300160-x0 Move Mass 1 Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300159-x0 Round Mass Hole Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300158-x0 Rectangular Plate Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300157-x0 Bubble Level Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300156-x0 L4C Clamp Bottom Mass CG Model Assembly, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300154-x0 L4C Clamp Top Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300153-x0 L4C Clamp Bottom Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300155-x0 L4C Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300152-x0 Translation Stage Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300151-x0 Clamp (Koch Design) Mass CG Model, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300150-x0 T240 Mass CG Model Assembly, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300149-x0 T240 Mass CG Model Foot, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300148-x0 T240 Mass CG Model Body, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1300147-x0 Load Configs Tilt Free Platform, Load Configs Tilt Free Platform Philipp Knothe et al. Seismic Isolation
Basic R&D
21 Feb 2013
D1100570-v2 Stage 0-1 Angled Blades Spacer, aLIGO BSC-ISI Fabrice Matichard et al. Seismic Isolation
Final Design
17 Jan 2013
E1000380-v2 aLIGO BSC-ISI, Stage 1-2 Horizontal Actuator Assembly Procedure Sebastien Biscans Seismic Isolation
Final Design
04 Dec 2012
E1000393-v3 aLIGO BSC-ISI, Stage 0-1 Horizontal Actuator Assembly Procedure Sebastien Biscans et al. Seismic Isolation
Final Design
04 Dec 2012
G1200753-v1 aLIGO H2 One Arm Test Update Keita Kawabe et al. Detector
Commissioning
03 Dec 2012
D1003161-v2 TRIM MASS AND DAMPING ASSY, BSC-ISI Fabrice Matichard et al. Seismic Isolation
Final Design
12 Nov 2012
T080261-v3 Building L4-C Pods Stephany Foley et al. Seismic Isolation
Final Design
12 Oct 2012
E1200841-x0 Rotate dual suspended seismometer short osc platform, Rotate dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
18 Sep 2012
D1201271-x0 Supporting structure, Dual suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
13 Sep 2012
D1201267-x0 Moving top, Dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
12 Sep 2012
D1201266-x0 Base, Dual suspended seismometer short osc platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
12 Sep 2012
D1201262-x0 Bottom clamp assembly, Dual Suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
12 Sep 2012
D1201261-x0 Top clamp assembly, Dual Suspended seismometer platform Philipp Knothe et al. Seismic Isolation
Conceptual Design
12 Sep 2012
E1000305-x0 aLIGO HAM-ISI Testing and Commissioning Documentation Fabrice Matichard Seismic Isolation
Subsystem Test
19 Jul 2012
D070300-v2 HAM Riser Assembly Fabrice Matichard et al. Seismic Isolation
Final Design
02 Jul 2012
E1000314-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) Hugo Paris et al. Seismic Isolation
Subsystem Test
28 Jun 2012
E1000313-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) Hugo Paris et al. Seismic Isolation
Subsystem Test
28 Jun 2012
E1000312-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 Hugo Paris et al. Seismic Isolation
Subsystem Test
24 May 2012
E1200486-x0 aLIGO, SEI Ken Mason et al. Seismic Isolation
16 May 2012
E1000310-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 Hugo Paris et al. Seismic Isolation
Subsystem Test
26 Apr 2012
E1000325-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #1 (LIGO-MIT) Celine Ramet Seismic Isolation
Subsystem Test
05 Apr 2012
E1000327-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #3 (HAM3) Celine Ramet Seismic Isolation
Final Design
05 Apr 2012
E1000326-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #2 (HAM2) Celine Ramet Seismic Isolation
Subsystem Test
05 Apr 2012
E1000328-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LLO Unit #4 (HAM4) Celine Ramet Seismic Isolation
Final Design
05 Apr 2012
E080053-v1 HAM ISI Installation into HAM Chamber: Dimensions and Specifications Sam Barnum et al. Seismic Isolation
Installation
01 Apr 2012
D070302-v1 HAM Tube Bracket Fabrice Matichard et al. Document Migration
19 Mar 2012
D070301-v1 HAM Lower Riser Fabrice Matichard Document Migration
19 Mar 2012
E1000387-v4 aLIGO BSC-ISI, Stage 1-2 Vertical Actuator Assembly Procedure Sebastien Biscans et al. Seismic Isolation
Final Design
21 Oct 2011
E1000306-x0 aLIGO BSC-ISI Testing and Commissioning Documentation Fabrice Matichard et al. Seismic Isolation
Subsystem Test
06 Oct 2011
D0902425-v1 Flexure Rod Bracket Assy, Stage 1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
02 Sep 2011
G1100883-v1 Advanced LIGO, nouvelle génération d’interféromètres pour la détection d’ondes gravitationnelles. Fabrice Matichard Seismic Isolation
Education, Outreach
15 Aug 2011
D0902276-v1 Flexure Rod Bracket, Stage 1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
04 Aug 2011
D0901197-v3 Spring Post Assembly, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
12 Jul 2011
D0902277-v2 Flexure Rod Gusset, Stage 1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
07 Jul 2011
D0902777-v2 GS-13 Pod, Vertical Assembly, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
15 Jun 2011
E0900444-v2 DCN for D0900857-V2 "GS13 Pod Assembly, aLIGO BSC ISI" and parts described in this DCN. Fabrice Matichard Seismic Isolation
Final Design
31 May 2011
D070586-v1 HAM ISI, INSTALLATION FIXTURE, aLIGO Sam Barnum et al. Seismic Isolation
Document Migration
Upgrades
Installation
31 May 2011
D1100973-x0 Teflon Blocks for GS13 Fabrice Matichard Seismic Isolation
Final Design
23 May 2011
D0902464-v3 Blade Pusher, Blades Loading Tooling, Stage 0-1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
06 May 2011
L0900118-v8 Advanced LIGO Preliminary Design Review of the BSC ISI system Fabrice Matichard et al. Seismic Isolation
Preliminary Design
Reviews
04 May 2011
G1100447-v3 SEI Technical Status - NSF 2011 Fabrice Matichard Seismic Isolation
Meeting
01 May 2011
E1000390-v2 aLIGO BSC-ISI, Stage 1-2 Position Sensors Assembly Procedure Michael Hillard et al. Seismic Isolation
Final Design
13 Apr 2011
D1100564-v1 Stage 1-2 Angled Blades Spacer, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
04 Apr 2011
E1000308-x0 aLIGO BSC-HEPI Testing and Commissioning Documentation Fabrice Matichard Seismic Isolation
Final Design
28 Mar 2011
D1000875-v2 Sleeve, Stage 1-2 Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
04 Mar 2011
D1000860-v2 Sleeve, Stage 0-1 Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
04 Mar 2011
G1100169-v1 Seismic Testing and Commissioning Overview Fabrice Matichard Seismic Isolation
Final Design
01 Mar 2011
D0902551-v3 Stage1-2 Locker, Base Shim Spacer, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
28 Jan 2011
D0901805-v2 Stage0-1, Locker, Base Shim Spacer Sam Barnum et al. Seismic Isolation
Preliminary Design
28 Jan 2011
D0902778-v5 GS-13 Pod, Horizontal Assembly, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
27 Jan 2011
E1100065-x0 Stage 0-1 Lockers and Stages inspection, aLIGO BSC-ISI, First Assembly at LASTI Fabrice Matichard Assembly
Seismic Isolation
25 Jan 2011
E070341-x0 HAM_ISI_Installation_Hazard_Analysis Fabrice Matichard et al. Seismic Isolation
Document Migration
Installation
26 Oct 2010
D071065-v2 Keel Base Andy Stein et al. Seismic Isolation
Final Design
14 Jan 2011
E1000389-v1 aLIGO BSC-ISI, Position Sensor and Target Assembly Procedure Michael Hillard et al. Seismic Isolation
Final Design
11 Jan 2011
D1002583-v1 Bridge Vertical Middle Post Weldment Sam Barnum et al. Seismic Isolation
Final Design
04 Jan 2011
D1002580-v1 Bridge Vertical Post Weldment Sam Barnum et al. Seismic Isolation
Final Design
04 Jan 2011
D1001461-v1 External Stand Angled Support, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
04 Jan 2011
D1001439-v1 External Stand Horizontal Support, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
04 Jan 2011
D1001466-v1 Middle Stand Horizontal Support, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
04 Jan 2011
D1002798-v1 Angle, External Stand Vertical Support, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
04 Jan 2011
D070590-v2 I-Beam, HAM-ISI Installation fixture Fabrice Matichard Seismic Isolation
Final Design
Document Migration
10 Dec 2010
D070589-v1 Cart, HAM-ISI Installation fixture Fabrice Matichard Seismic Isolation
Final Design
Document Migration
08 Dec 2010
D0901499-v1 Blade spring Post, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
02 Dec 2010
E1000758-x0 Ballast, Trim Mass Release Fabrice Matichard Seismic Isolation
Final Design
30 Nov 2010
D070591-v1 SPACER, HAM-ISI Installation Fixture Sam Barnum et al. Seismic Isolation
Final Design
Upgrades
29 Nov 2010
D070588-v1 Middle Stand, HAM-ISI, Installation Fixture Sam Barnum et al. Seismic Isolation
Final Design
29 Nov 2010
D1001462-v1 External Stand Vertical Support, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
29 Nov 2010
E1000756-x0 Spring Assembly Dowel pin replacement BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
29 Nov 2010
E1000754-x0 Trim Mass Damping Release Fabrice Matichard Seismic Isolation
Final Design
29 Nov 2010
D0902488-v3 Tooling Bracket, Blades Pusher Stg 0-1& Blades Puller Stg 1-2, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
18 Nov 2010
E1000729-x0 Stage 1-2 Safety Restraint, Revise Nut Material Stephany Foley et al. Seismic Isolation
Final Design
17 Nov 2010
D1000466-v1 Hex Nut 1/2-20 Michael Hillard Seismic Isolation
Final Design
17 Nov 2010
E1000225-x0 DCN for D0902165-v2 and D0902167-v2 (Stage 1-2 Safety Restraint) Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
E1000226-x0 DCN for D0901872-v2, D0902118-v2 , D0902130-v2, D0902119-v2 (Stage 0-1 Safety Restraint) Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902130-v2 Left Post for BSC-ISI Stage 0-1Safety Mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0901872-v2 Stage0-1 Blade Spring Safety Restraint Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902167-v2 Post for Small Blade Safety Mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902165-v2 Cap for Small Blade Safety mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902166-v2 Special Screw for Small Blade Safety Mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902117-v2 Cap for BSC-ISI Stage 0-1Safety Mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902131-v2 Center Part for BSC-ISI Stage 0-1Safety Mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D0902119-v2 Right Post for BSC-ISI Stage 0-1Safety Mechanism Fabrice Matichard Seismic Isolation
Final Design
03 Nov 2010
D1000855-v3 Stage 1-2 Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
28 Oct 2010
D1000854-v3 Stage 0-1 Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
28 Oct 2010
E1000614-v1 DCN for: HAM-ISI INSTALLATION FIXTURE Sam Barnum et al. Seismic Isolation
Final Design
21 Oct 2010
D1001465-v1 Middle Stand Vertical Support, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
21 Oct 2010
D070587-v1 External Stand, HAM-ISI Fixture Sam Barnum et al. Seismic Isolation
Final Design
Document Migration
Upgrades
21 Oct 2010
E1000507-v1 aLIGO BSC-ISI, Stage 1 Structural Testing Fabrice Matichard Seismic Isolation
Subsystem Test
01 Oct 2010
D1000861-v2 Post, Stage 0-1 Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
01 Oct 2010
D0902599-v4 Step 1 Bolt, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
21 Sep 2010
G1000815-v1 Passive damping solutions for the BSC-ISI and Quadruple Pendulum structural modes Sebastien Biscans et al. Seismic Isolation
Basic R&D
15 Sep 2010
D047942-v2 Washer, Lockers, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
15 Sep 2010
D1002380-v1 BARREL NUT BAR, STAGE 1-2, aLIGO BSC ISI Michael Hillard et al. Seismic Isolation
Final Design
09 Sep 2010
D1002379-v1 BARREL NUT BAR, SPRING POST, STAGE 0-1, aLIGO BSC ISI Michael Hillard et al. Seismic Isolation
Final Design
09 Sep 2010
E1000399-v1 BSC-ISI passive damping experiments Fabrice Matichard Seismic Isolation
Subsystem Test
08 Sep 2010
E1000400-v1 Quad Local resonances Fabrice Matichard Seismic Isolation
Subsystem Test
08 Sep 2010
D1000908-v3 HOUSING LOCKER SLEEVE, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
02 Sep 2010
E1000381-x0 aLIGO BSC ISI Assembly Drawing revisions Fabrice Matichard Seismic Isolation
Final Design
02 Sep 2010
D1001806-v2 Pin Cap, Locker, Stage 1-2, aLIGO BSC ISI Andy Stein et al. Seismic Isolation
Final Design
31 Aug 2010
G1000721-v1 aLIGO SEI, HAM-ISI, LHO Unit #1, Testing Presentation - Part II Fabrice Matichard Seismic Isolation
Final Design
25 Aug 2010
D1000469-v2 Position Sensor Base, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
23 Aug 2010
E1000341-v1 HAM-ISI LHO test stand: software, electronic checks, and user guide Fabrice Matichard Seismic Isolation
Subsystem Test
20 Aug 2010
T1000433-v3 HAM-ISI LHO test stand, software and electronic check Fabrice Matichard Seismic Isolation
Final Design
20 Aug 2010
D1000642-v1 Small Vertical Actuator Assy W/Tooling, aLIGO BSC ISI Andy Stein et al. Seismic Isolation
Final Design
20 Aug 2010
D1000470-v2 Position Sensor Target, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
20 Aug 2010
E1000307-x0 aLIGO HAM-HEPI Testing and Commissioning Documentation Fabrice Matichard Seismic Isolation
Subsystem Test
11 Aug 2010
D0902281-v2 Door, Stage1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
11 Aug 2010
D0902280-v2 Ballast, Stage 1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
10 Aug 2010
D0902274-v2 Flexure Wall, Stage 1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
10 Aug 2010
D0902278-v2 L4C Wall, Stage 1, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
06 Aug 2010
D1001113-v2 STAGE 1-2 TOOLING STANDOFF WASHER, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
03 Aug 2010
D1001111-v2 STAGE 0-2 ALIGNMENT WASHER, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
03 Aug 2010
E0900028-v1 BSC ISI-Quad Modal analysis Fabrice Matichard Seismic Isolation
System Test
02 Aug 2010
D1000873-v2 Post, Stage 1-2 Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
30 Jul 2010
D047935-v4 Locker Spherical Pin Andy Stein et al. Seismic Isolation
Final Design
30 Jul 2010
D1000862-v2 Pin Cap, Locker, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
28 Jul 2010
D1000472-v1 Position Sensor Target Body, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
28 Jul 2010
D0902673-v1 Joint Cable Tie, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
27 Jul 2010
D0902671-v1 Top Cable Tie, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
27 Jul 2010
D0902672-v1 Bottom Cable Tie, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
27 Jul 2010
D0902603-v1 Bolt Cap, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
27 Jul 2010
D0902602-v1 Bottom Pivot, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
27 Jul 2010
D0902200-v1 Top Saddle on Bracket, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
27 Jul 2010
D0902483-v2 Saddle on Large Blades, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
27 Jul 2010
E1000276-x0 DCN for D0902310-v2 Fabrice Matichard Seismic Isolation
Final Design
26 Jul 2010
T1000439-x0 aLIGO SEI Testing Report, HAM-ISI, LHO Unit #2 Fabrice Matichard Seismic Isolation
Final Design
26 Jul 2010
D1000679-v1 Spherical Washer, 1in OD Convex, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
26 Jul 2010
D1000678-v1 Spherical Washer, 2 in OD Convex, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
26 Jul 2010
D0902503-v2 BSC-ISI, Stage 1, Close Out Plate Cover Fabrice Matichard Seismic Isolation
Final Design
23 Jul 2010
D0900859-v5 GS-13 Pod Top Hat , aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
23 Jul 2010
D0902283-v1 L4C Interposer, Stage 1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
21 Jul 2010
D0902282-v1 Hex Inner Wall, Stage 1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
21 Jul 2010
D0900858-v1 GS-13 Pod Interposer Sam Barnum et al. Seismic Isolation
Final Design
21 Jul 2010
D0902541-v2 Diaphragm, Vert GS-13, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
21 Jul 2010
D1001737-v1 Step Pin, Small Actuator, aLIGO BSC ISI Andy Stein et al. Seismic Isolation
Final Design
09 Jul 2010
E1000229-x0 DCN for D1001527-v1 Fabrice Matichard Seismic Isolation
Final Design
22 Jun 2010
E1000227-x0 DCN for D0902236-V2 (Small Actuator Assembly) Fabrice Matichard Seismic Isolation
Final Design
21 Jun 2010
E1000224-x0 DCN for D0902454-V2 "Stage 1-2 Spring Loader" and Children Fabrice Matichard Seismic Isolation
Final Design
21 Jun 2010
D1001612-x0 Obsolete Fabrice Matichard Seismic Isolation
Final Design
21 Jun 2010
D0900860-v3 GS-13 Pod BaseFlange Sam Barnum et al. Seismic Isolation
Final Design
03 Jun 2010
D0901832-v2 GS-13 Horiz Stabilizer Assembly. aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
26 May 2010
D0902800-v2 Custom Weld nut, GS13 Diaphragm, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
26 May 2010
D0901829-v2 GS-13 Stabilizer Plate, aLIGO BSC-ISI Sam Barnum et al. Seismic Isolation
Final Design
26 May 2010
D0902279-v2 Base Plate, Stage1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
25 May 2010
D0902273-v2 Close Out Plate, Stage 1, BSC ISI Fabrice Matichard Seismic Isolation
Final Design
24 May 2010
D0902670-v1 Cable Tie, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
13 May 2010
D1001110-v1 STAGE 0-2 ALIGNMENT PIN ASSY, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
13 May 2010
D1001112-v1 STAGE 1-2 TOOLING STANDOFF PIN ASSY, aLIGO BSC ISI Michael Hillard Seismic Isolation
Final Design
13 May 2010
D1000468-v1 Position Sensor Target Assembly, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
04 May 2010
D047824-v5 Clamp for L4C in pod Fabrice Matichard Seismic Isolation
Final Design
30 Apr 2010
D1000478-v1 Sensor Assembly Horizontal, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
29 Apr 2010
D1000477-v1 Positon Sensor Assembly, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
28 Apr 2010
D1000467-v1 Positon Sensor Assembly, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
28 Apr 2010
D1000471-v1 Position Sensor Target Shaft, aLIGO BSC ISI Sam Barnum et al. Seismic Isolation
Final Design
28 Apr 2010
D0901541-v1 Blade Spring, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
26 Apr 2010
E0900443-v2 DCN for LIGO-D0900648-V2 "Trillium Pod, aLIGO BSC-ISI" and parts described in this DCN. Fabrice Matichard Seismic Isolation
Final Design
13 Apr 2010
D047941-v1 Stages Lockers, prototype BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
08 Apr 2010
D047934-v1 Sleeve, Lockers, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
07 Apr 2010
D0902616-v1 Small Trim Mass, Stage 1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902615-v1 Front Upper Trim Mass 10 Lbs, Stage 1, BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902614-v1 Front Lower Trim Mass 10 Lbs, Stage 1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D1000525-v1 L4C-ADL Interposer Assy, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902441-v1 Side Ribs, Stage 1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902443-v1 Back Ribs, Stage 1, aLIGO BSC ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902271-v1 Angled Hex wall, Stage 1, BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902272-v1 Blocks Links, Stage 1, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
24 Mar 2010
D0902696-v1 Spring Clamp Plate, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
01 Mar 2010
D0902697-v1 Spring Clamp Cap, Stage 0, aLIGO BSC ISI Andy Stein et al. Seismic Isolation
Final Design
01 Mar 2010
D0901542-v1 D0901542 Barrel Nut Bar, Stage 0-1, aLIGO BSC-ISI Andy Stein et al. Seismic Isolation
Final Design
01 Mar 2010
D0902600-v1 Step 2 Bolt, Stage 0-1 Blade Pusher, aLIGO BSC-ISI Fabrice Matichard Seismic Isolation
Final Design
21 Feb 2010
D1000337-v1 Blade Shims, Stage 0-1, BSC-ISI LASTI Prototype Fabrice Matichard Seismic Isolation
Final Design
17 Feb 2010
D0902583-v1 Spacer, Horz GS-13 Stiffener, aLIGO BSC ISI Andy Stein et al. Seismic Isolation
Final Design
09 Feb 2010
T0900593-x0 Trillium OBS Pod Assembly Procedure Adv LIGO BSC ISI Stephany Foley et al. Seismic Isolation
Final Design
25 Nov 2009
T0900592-x0 GS-13 Pod Assembly Procedure for Adv LIGO BSC ISI Stephany Foley et al. Seismic Isolation
Final Design
25 Nov 2009
D071063-v2 Keel Wall Andy Stein et al. Seismic Isolation
Final Design
11 May 2009
E0900104-v3 BSC-ISI Design, Stage1 Kick off meeting notes Fabrice Matichard Conceptual Design
22 Apr 2009
G0900169-v1 BSC Internal Seismic Isolation (BSC-ISI) and Quadruple Pendulum Noise Prototype (Quad NP) Testing at LASTI Brett Shapiro et al. Meeting
25 Mar 2009
E080176-x0 HAM ISI Installation Fixture for LLO - Fixture Assembly and Tests under load done at Southern Enterprises Fabrice Matichard Document Migration
07 Oct 2008
E080071-x0 Document Change Notice (DCN) - HAM ISI installation at LLO Fabrice Matichard Document Migration
03 Jun 2008
E080072-x0 Document Change Notice (DCN) - HAM ISI installation Fixture drawings Fabrice Matichard Document Migration
15 Apr 2008
D070304-x0 HAM Upper Riser Fabrice Matichard Document Migration
07 Feb 2008
D070303-x0 HAM Riser Preloading Tool Fabrice Matichard Document Migration
07 Feb 2008
D070574-x0 HAM ISI Fixture Table to Hoist Connector Fabrice Matichard Document Migration
05 Feb 2008
D070573-x0 HAM ISI Fixture Trolley Connector Fabrice Matichard Document Migration
05 Feb 2008

Number of documents found: 363


DCC Version 3.4.2, contact Document Database Administrators