LIGO Document E1400472-v3
- Although this document is written as a general in situ cleaning procedure for test mass optics, it is motivated by the need to clean residue from the perimeter of a central alignment window in a First Contact™ (FC) layer which has been observed in imaging of the H1 ETMy HR surface with Arm Length Stabilization (ALS) system green light (see LHO elog entry #15479):
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=15479
- At GariLynn's request I switched the drag wipe procedure from T0900402 to E070304 (with acetone, not methanol). This procedure is now final for the H1 ETMy vent this week.
DCC Version 3.4.3, contact
Document Database Administrators