Document List by Topic

These documents on Incoming Inspection (subtopic of Activity) are available:

LIGO-Number Title Author(s) Topic(s) Last Updated
G2201909-v3 A+ / O4 OMC DCPD Whitening Chassis Redesign Oct 2022 Update Jeffrey Kissel et al. Subsystem Test
Incoming Inspection
Commissioning
Sensing and Control
05 Sep 2023
Q2000005-v1 TMS shroud Post-coating Inspection Kyle Baric et al. Incoming Inspection
30 Nov 2021
E1700080-x0 AERM08 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700079-x0 AERM07 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700078-x0 AERM06 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
E1700077-x0 AERM05 Characterization GariLynn Billingsley Incoming Inspection
Core Optics
16 Jun 2020
T1900395-v1 Incoming Test of Spare SQZ Mephisto 1000NE Laser System Jason Oberling Incoming Inspection
Laser Systems
06 Aug 2019
E1800096-v1 CVD Silicon Carbide Beam Dump Inspection Regina Lee Incoming Inspection
08 Nov 2018
E1800039-v3 Baffle Inspection D1003301-v9 Regina Lee Incoming Inspection
System Engineering
08 Nov 2018
T1600204-v2 Mirror loss estimates for aLIGO pre-modecleaners Liyuan Zhang et al. Incoming Inspection
Laser Systems
Operations
30 Jul 2016
G1501372-v1 O1 DARM Loop Design Comprisons and Critiques Jeffrey Kissel Incoming Inspection
Integration
Sensing and Control
Modelling
Calibration
07 Mar 2017
E0900426-v5 HEPI Kaman Sensor Receiving Analysis Hugh Radkins et al. Incoming Inspection
Seismic Isolation
10 Mar 2015
D1101941-v2 ETM HWS EtherCAT breakout box Aidan Brooks et al. Incoming Inspection
Auxiliary Optics
25 Jun 2014
F0900070-v6 GS-13 Inspection Checklist Joe Hanson et al. Subsystem Test
Incoming Inspection
Installation
Seismic Isolation
18 Jun 2014
T0900564-v2 aLIGO Large Actuator Test Results from Qinetiq Brian O'Reilly Incoming Inspection
Seismic Isolation
18 Jun 2014
E1000295-v8 aLIGO TCS Ring Heater Assembies, Formal Drawing Tree & BOM Reference Guido Mueller et al. Vacuum
Incoming Inspection
Auxiliary Optics
Fabrication
25 Oct 2013
T1300812-v1 Manifold-cryo-baf_Blades_Weight_Req Michael Smith Incoming Inspection
Auxiliary Optics
17 Sep 2013
T1300789-v1 OFI Wedge Prism Reflectance Data Michael Smith Incoming Inspection
Auxiliary Optics
16 Sep 2013
E1300424-v1 Thickness Inspection D0902817–v4 Blade Manifold/Cryo Baf Michael Smith Incoming Inspection
Auxiliary Optics
13 Sep 2013
E1100583-v1 SEM Examination of Spotted and Rusted Cantilever Blades Jeffrey Lewis Incoming Inspection
13 Sep 2013
E1300368-v1 Install BS Elliptical Baffle LLO BSC2 X&Y Test Michael Smith Incoming Inspection
Auxiliary Optics
15 May 2013
F1100002-v4 Winding Template, aLIGO TCS Ring Heater Elements Mindy Jacobson et al. Vacuum
Incoming Inspection
Auxiliary Optics
Fabrication
07 Mar 2013
T1200083-v1 aLIGO Kepco DC Power Supply Acceptance Testing Scripts Carl Adams Incoming Inspection
16 Apr 2012
E1101200-v1 6in VP Type 1 Run Numbers-Serial Numbers Michael Smith Incoming Inspection
15 Dec 2011
E1101199-v1 6in VP Type 1 AR data Michael Smith Incoming Inspection
15 Dec 2011
G1100147-v1 HLTS Kickoff Presentation Derek Bridges et al. Subsystem Test
Assembly
Incoming Inspection
Meeting
Suspensions
06 Jul 2011
E1000498-x0 aLIGO SUS BOSEM Testing Documentation Derek Bridges et al. Subsystem Test
Incoming Inspection
Suspensions
04 Mar 2011
T1000700-v2 Transmon Telescope Mirror Test Procedure Michael Smith et al. Subsystem Test
Incoming Inspection
Auxiliary Optics
Final Design
21 Dec 2010
E1000376-v1 RGA Test Results: A-OSEM Circuit Board Sub-Assembly (223 units) Dennis Coyne et al. Vacuum
Incoming Inspection
System Engineering
Suspensions
01 Sep 2010
E1000217-v1 LHO QUAD Lower Structure FTIR Post Bake, Repeat Betsy Weaver Incoming Inspection
Suspensions
11 Aug 2010
E1000102-v2 LHO LABO FTIR Sample Record HR202 Hugh Radkins Incoming Inspection
Seismic Isolation
08 Apr 2010
E1000002-v1 Certification for Viton for L1 HAM6 OMC damping struts Robert Taylor et al. Incoming Inspection
Commissioning
Installation
Suspensions
Seismic Isolation
11 Jan 2010

Number of documents found: 32


DCC Version 3.4.3, contact Document Database Administrators