Document List by Author

Marielle van Veggel of University of Glasgow is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
D080751-v4 Advanced LIGO, Suspension, ETM/ITM Test Mass, Production ear Marielle van Veggel Final Design
Suspensions
28 Sep 2023
T0900447-v4 Final Design Document ETM/ITM Ears Marielle van Veggel Fabrication
Suspensions
24 Feb 2014
E1000828-v2 Prism bonding jig settings calculation sheet for the ERM and TCP Marielle van Veggel Installation
Suspensions
13 Sep 2011
T1100438-v1 Report on fiducial line position measurements for ETM04 Gerardo Moreno et al. Installation
Core Optics
Suspensions
01 Jul 2020
T1100404-v4 Note to support corrected jig settings-calculations for off-set fiducial lines of ETM04 Marielle van Veggel et al. Installation
Suspensions
01 Jul 2020
G1800845-v1 Cryogenic suspensions for future gravitational wave detectors Marielle van Veggel et al. Conceptual Design
Basic R&D
Suspensions
16 May 2018
E1000278-v7 Preparation of an end or input test mass (ETM/ITM) (Hydroxide-Catalysis Bonding of ears) Margot Hennig et al. Final Design
Suspensions
28 Aug 2012
T1000017-v1 Monolithic Test Hang Procedure Notes Matthew Maxwell et al. Subsystem Test
Suspensions
12 Apr 2017
G1601661-v2 Some optical properties of hydroxide catalysis bonds Marielle van Veggel et al. Meeting
29 Aug 2016
G1601717-v1 Non-destructive bond thickness and refractive index values from measurements of the optical reflectivity of hydroxide-catalysis bonds Valentina Mangano et al. Meeting
Core Optics
28 Aug 2016
D1000759-v3 Advanced LIGO SUS ETM Production Monolithic Assembly Russell Jones et al. Assembly
Final Design
Suspensions
12 Jul 2016
D090007-v4 Advanced LIGO, Suspension, ETM/ITM Quad PM, Production Ear with Recess Marielle van Veggel Final Design
Suspensions
14 Apr 2016
E1000752-v5 Preparation of a thermal compensation plate (TCP) or end reaction mass (ERM) (Gluing wire break-off prisms and earthquake stops) Margot Hennig et al. Installation
Suspensions
08 Mar 2016
G1501438-v1 Status of hydroxide catalysis and indium bonding research for use in cryogenic mirror suspensions in KAGRA, ET and upgrades to aLIGO Marielle van Veggel Meeting
02 Dec 2015
G1500638-v1 Current status of bonding research for sapphire and silicon suspensions Marielle van Veggel Meeting
19 May 2015
G1500637-v1 Current status of bonding research for sapphire and silicon suspensions Marielle van Veggel Meeting
18 May 2015
T1500177-v1 Inspect PUM Ears D090007 Serial number 0128 GariLynn Billingsley et al. Suspensions
17 Apr 2015
G1400857-v1 Studies of some properties of hydroxide-catalysis bonds Valentina Mangano et al. Meeting
24 Aug 2014
D0901592-v2 ASSEMBLY DRAWING - ear bonding jig Marielle van Veggel Preliminary Design
Suspensions
16 Jun 2014
G1400524-v1 Advances in bonding for the construction of mirror suspensions of future generation gravitational wave detectors Marielle van Veggel Basic R&D
26 May 2014
D0902505-v9 Fiber Guard Assembly (Installation Instructions) Marielle van Veggel et al. Preliminary Design
Suspensions
02 Apr 2014
D0902513-v4 Fibre guard angle section 5 Marielle van Veggel et al. Preliminary Design
Suspensions
12 Feb 2014
D0902511-v4 Fibre guard angle section 3 Marielle van Veggel et al. Preliminary Design
Suspensions
12 Feb 2014
D1002147-v1 aLIGO BS/FM Prism bonding jig Marielle van Veggel et al. Installation
Suspensions
11 Dec 2013
D1002153-v3 aLIGO BS/FM Prism holder Marielle van Veggel et al. Installation
Suspensions
11 Dec 2013
D1002149-v1 aLIGO BS/FM Prism bonding baseplate Marielle van Veggel et al. Installation
Suspensions
11 Nov 2013
D1002151-v3 aLIGO BS/FM Prism bonding support cylinder Marielle van Veggel et al. Installation
Suspensions
11 Nov 2013
E1000277-v13 Preparation of an end or input penultimate mass (ETM-PM/ITM-PM) (Hydroxide-Catalysis Bonding of ears and gluing prisms and magnet flags) Marielle van Veggel et al. Final Design
Suspensions
25 Jul 2013
D1000128-v3 Penultimate mass prism holder for D0901592 bonding jig Marielle van Veggel et al. Preliminary Design
Suspensions
18 Jul 2013
D1001623-v2 aLIGO ETM/ITM penultimate mass prism holder assembly Marielle van Veggel et al. Installation
Suspensions
18 Jul 2013
E050228-v2 Silicate Bonding Procedure (Hydroxide-Catalysis Bonding) Marielle van Veggel Basic R&D
Suspensions
31 Aug 2010
E1000829-v6 BS/FM Prism Gluing Jig Settings Calculation Spreadsheet Marielle van Veggel et al. Installation
Suspensions
16 Jan 2013
T0900369-v1 Removal of the ears and prisms at LASTI in July 2009 Liam Cunningham et al. Installation
Suspensions
17 Sep 2012
D0902507-v6 Fibre guard Main Body Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902519-v4 aLIGO SUS, Fibre guard angle section 11 Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902518-v4 aLIGO SUS, Fibre guard angle section 10 Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902517-v4 aLIGO SUS,Fibre guard angle section 9 Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902508-v5 aLIGO SUSFibre guard Separator Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902516-v4 aLIGO SUS,Fibre guard angle section 8 Marielle van Veggel et al. Final Design
Suspensions
13 Feb 2012
D0902515-v3 Fibre guard angle section 7 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902514-v3 Fibre guard angle section 6 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902512-v6 Fibre guard angle section 4 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902510-v3 Fibre guard angle section 2 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902509-v3 Fibre guard angle section 1 Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
D0902506-v9 Fibre guard assembly Marielle van Veggel et al. Preliminary Design
Suspensions
09 Feb 2012
T1000345-v2 The Design of the IGR MKII Strength Testing Machine Russell Jones et al. Basic R&D
Suspensions
11 Oct 2011
D0900957-v1 ALIGO SUS ETM/ITM monolithic assembly - spring clamp for weld mirror on weld hub Giles Hammond et al. Preliminary Design
09 Sep 2011
T1100238-v2 Report on hydroxide catalysis bonding done at LHO in March and April 2011 Marielle van Veggel et al. Installation
Core Optics
Suspensions
02 Aug 2011
T1100081-v1 Shear strength testing of hydroxide catalysis bonded discs Marielle van Veggel et al. Basic R&D
22 Jun 2011
G0900791-v1 Flame welding tests for monolithic suspension of a 40-kg test mass (as backup for Advanced LIGO) Giles Hammond et al. Suspensions
17 May 2011
D1100555-v1 Metrology baseplate for ear and prism position measurements Gerardo Moreno et al. Installation
Suspensions
31 Mar 2011
D1000017-v3 Fibre storage rack - inner cross rib Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000018-v3 Fibre storage rack - horizontal tie bar Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000016-v3 Fibre storage rack - inner rib Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000015-v3 Fibre storage rack - long side rib Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000014-v3 Fibre storage rack - Cross rib Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000012-v3 Fibre storage rack - horizontal rail side 2 Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000011-v3 Fibre storage rack - horizontal rail side 1 Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
D1000009-v3 Fibre storage rack - baseplate Marielle van Veggel et al. Preliminary Design
Suspensions
21 Mar 2011
G1100166-v3 Hydroxide catalysis bonding for aLIGO, eaLIGO and beyond Marielle van Veggel Meeting
Suspensions
16 Mar 2011
D1002152-v1 aLIGO BS/FM Prism holder assembly Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002150-x0 aLIGO BS/FM Prism bonding alignment guide Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002148-v1 aLIGO BS/FM Prism bonding fixture Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002146-v1 aLIGO TCP/ERM Prism holder Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002142-v2 aLIGO TCP Prism bonding baseplate Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002141-v2 aLIGO TCP Prism bonding fixture Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002144-v1 aLIGO TCP Prism bonding support cylinder Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002143-v1 aLIGO TCP Prism bonding alignment guide Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002140-v2 aLIGO TCP Prism bonding jig Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002203-v2 aLIGO ERM Prism bonding baseplate Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002145-v1 aLIGO TCP/ERM Prism holder assembly Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002288-v1 aLIGO ERM prism bonding support cylinder Marielle van Veggel et al. Final Design
Suspensions
09 Mar 2011
D1002202-v2 aLIGO ERM Prism bonding fixture Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D1002201-v2 aLIGO ERM Prism bonding jig Marielle van Veggel et al. Installation
Suspensions
09 Mar 2011
D0900373-v2 ALIGO SUS ETM/ITM Monolithic Assembly_Advanced Welding Hub Giles Hammond et al. Installation
Basic R&D
Suspensions
08 Mar 2011
D1002291-v1 aLIGO TCP/ERM Prism holder fixing screw Marielle van Veggel et al. Installation
Suspensions
21 Oct 2010
D1002290-v1 aLIGO TCP/ERM Prism holder alignment bush Marielle van Veggel et al. Installation
Suspensions
21 Oct 2010
D1002289-v1 aLIGO TCP/ERM Prism holder alignment screw Marielle van Veggel et al. Installation
Suspensions
21 Oct 2010
T1000016-v1 ALIGO NP-type: - Preparations of Ear Bonding at LASTI (February 2010) Marielle van Veggel et al. Installation
Suspensions
12 Oct 2010
D1001685-v1 V-block - assembly Marielle van Veggel Installation
Suspensions
21 Sep 2010
E1000273-v1 Design document for PM wire break-off prisms Ken Strain et al. Final Design
Suspensions
02 Sep 2010
D1000013-v3 Fibre storage rack - fibre support crossbar Marielle van Veggel et al. Preliminary Design
Suspensions
01 Sep 2010
D1000019-v3 Fibre storage rack - fibre support peg Marielle van Veggel et al. Preliminary Design
Suspensions
01 Sep 2010
T1000472-v1 Technical Design Document of the fibre guard in the aLIGO ETM/ITM quad suspension Marielle van Veggel et al. Installation
Suspensions
26 Aug 2010
T0900586-v1 Proof load test and vertical bounce frequency test apparatus for ITM/ETM silica suspension fibres Ken Strain et al. Final Design
Suspensions
26 Aug 2010
T1000464-v1 De-Bonding Experiments on Samples Cured for up to Forty-Eight Hours Marielle van Veggel Basic R&D
04 Aug 2010
T080245-v1 ALIGO NP-type: - Report on bonding Viton stops, magnet holders and break-off prisms at LASTI Russell Jones et al. Subsystem Test
Suspensions
13 Jul 2010
D1000008-v3 Fibre storage rack Giles Hammond et al. Preliminary Design
Suspensions
18 May 2010
D1000010-v3 Fibre storage rack - vertical support Marielle van Veggel et al. Preliminary Design
Suspensions
18 May 2010
F1000013-v1 Ear quality control sheets Marielle van Veggel Fabrication
Suspensions
27 Apr 2010
G1000436-v3 Progress monolithic suspension work Glasgow and MIT since April 2009 Giles Hammond et al. Meeting
Reviews
Suspensions
16 Apr 2010
F1000006-v1 Bond quality monitoring form Marielle van Veggel Final Design
Suspensions
14 Apr 2010
T1000114-v1 ALIGO NP-type: - Ear Bonding at LASTI - February 2010 Gerardo Moreno et al. Installation
Suspensions
15 Mar 2010
D1000129-x0 Assembly of the bonding jig with prism holder on the ETM/ITM penultimate mass Marielle van Veggel Preliminary Design
Suspensions
25 Jan 2010
T0900629-v2 Response to questions from the review panel on the Final Design Review of the ETM/ITM ears Giles Hammond et al. Final Design
Suspensions
17 Dec 2009
G0900652-v2 Gravitational wave detectors - broadening their horizon Marielle van Veggel Detector
08 Jul 2009
T0900278-v2 ALIGO NP-type: Preparations and hazard analysis for test hangs at LASTI in July/August 2009 Giles Hammond et al. System Test
Suspensions
02 Jul 2009
G0900586-v1 Flame welding tests for monolithic suspensions of the mirrors of future GW interferometers. Giles Hammond et al. Basic R&D
Suspensions
19 Jun 2009
G0900507-v2 Overview of monolithic suspension work for Advanced LIGO Timothy Bodiya et al. Basic R&D
Suspensions
19 Jun 2009
G0900583-v1 Properties of hydroxy-catalysis bonds for use in advanced gravitational wave detectors Karen Haughian et al. Basic R&D
19 Jun 2009
T0900203-v2 Assembly procedure of monolithic part of the suspension for advanced LIGO Giles Hammond et al. Preliminary Design
09 Jun 2009
T0900211-x0 Welding tests at Glasgow (5-8 May 2009) Marielle van Veggel et al. Final Design
Suspensions
06 May 2009
T080326-v1 A Strategy to Prove and Provide Monolithic Suspensions Giles Hammond et al. Suspensions
20 Feb 2009
T080152-x0 Questions preliminary design review of silica masses for advanced LIGO Mark Barton et al. Document Migration
20 Jun 2008
T080091-x0 Proposal for baseline change from ribbons to fibres in AdvLIGO test mass suspension monolithic stage Mark Barton et al. Document Migration
21 Apr 2008
G080220-x0 Update on Bonding Ears and Prisms to the Test Masses for LASTI - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 Helena Armandula et al. Document Migration
04 Apr 2008
T080023-x0 Test prism glueing on disc insert plates Helena Armandula et al. Document Migration
26 Feb 2008
T080041-x0 ALIGO NP-type - Report on prism bonding at LASTI on 11th -17th February 2008 Helena Armandula et al. Document Migration
26 Feb 2008
T080020-x0 ALIGO NP-Type: Preparations of prism bonding at LASTI on 11th - 17th February 2008 Helena Armandula et al. Document Migration
26 Feb 2008
T080006-x0 Laboratory layout during ear bonding at LASTI Helena Armandula et al. Document Migration
17 Jan 2008
T070305-x0 ALIGO NP-Type: Report on Ear Bonding at LASTI on 10th -14th December 2007 Helena Armandula et al. Document Migration
16 Jan 2008
T070298-x0 ALIGO NP-Type: Preparations of Ear Bonding at LASTI on 10th -14th December 2007 Helena Armandula et al. Document Migration
06 Dec 2007
G070733-x0 Bonding Ears on the Penultimate Mass and Test Mass at LASTI - LSC/Virgo Collaborations Meeting, October 22-25 2007, Hannover Germany Marielle van Veggel Document Migration
30 Oct 2007

Number of documents found: 113


DCC Version 3.4.2, contact Document Database Administrators