LIGO-E1400310-v1
17 Nov 2014, 16:54 |
section 6.1:
- revised the availability numerical estimate
- added an estimate of dual coincidence up-time based on scheduled simultaneous maintenance periods
- revised the plots and table
section 6.2:
- added more detail of L1 and H1 power interruption data
- noted lower power interruption rate more recently at LLO
- noted decision to drop consideration of a UPS system for now
- revised the hardware failure table; in particular the DAQ failure rate (derived from the Sparing Analysis was unrealistically high)
- added a facility maintenance event to the table
- added explanatory text on how the failures requiring prompt attention are treated differently than deferred repairs (which occur during maintenance event periods)
- Added note that repair of non-trivial hardware failures can only occur (more or less) immediately if they occur during normal work hours. If a non-trivial hardware failure occurs during the owl shift or a weekend, it will necessarily take considerably longer to repair, since it will require expert science or engineering staff to make the repair/replacement. This has not yet been factored into the analysis. This will increase somewhat the 3.48% estimate for repair time for failures requiring prompt attention.
section 6.9: added notes on Facility failure/repair considerations
DCC Version 3.5.0, contact
DCC Help