LIGO Document D080503-v3
- ADVANCED LIGO, SUS, THIS, BEAM SPLITTER UPPER STRUCTURE, SHEAR PLATE
- 1) NOTES AND CHANGES WITH v3 REFER TO DCN LINKED BELOW
2) IT SHOULD BE NOTED THAT THE ADVANCED LIGO PRODUCTION SHEAR PLATES ALSO REQUIRE ELECTROPOLISHING, NOT COVERED IN THE UPDATED DRAWING.
DCC Version 3.4.3, contact
Document Database Administrators