LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
M1100040-v7 |
SOP for Arm Length Stabilization Setup in LVEA and VEA at LHO |
Bram Slagmolen et al. |
Sensing and Control
Safety
|
26 Aug 2015 |
D1400241-v8 |
H1 ALS Y-End Station Optical Table Layout (ISCTEY) - LHO actual installation |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
04 Apr 2024 |
D1800270-v2 |
H1 ALS X-End Station Optical Table Layout (ISCTEX) - LHO actual installation |
Aidan Brooks et al. |
Auxiliary Optics
|
04 Apr 2024 |
D1800271-v3 |
L1 ALS X-End Station Optical Table Layout (ISCTEX) - LLO actual installation |
Aidan Brooks et al. |
Auxiliary Optics
|
04 Apr 2024 |
G1500623-v6 |
aLIGO, CAL, Official Advanced LIGO Sensitivity Plots |
Jeffrey Kissel et al. |
Calibration
Commissioning
|
23 Jun 2023 |
G2301086-v3 |
ER15/O4 public alerts so far |
Keita Kawabe et al. |
Operations
Detector
Astrophysics / Multi-messenger
|
25 May 2023 |
G2300908-v4 |
LVK Rapid Response in ER15/O4 |
Keita Kawabe et al. |
Astrophysics / Multi-messenger
|
27 Apr 2023 |
T1500516-v3 |
Timing Witness Signals Indicate Trustworthy Timing for G184098, a BBH Event Candidate |
Stefan Countryman et al. |
Data Acquisition System
|
23 Dec 2022 |
E2100162-v1 |
Modifications to the ISS second loop servo |
Daniel Sigg et al. |
Laser Systems
|
03 May 2021 |
T1400745-v2 |
General ISCT assembly procedures |
Keita Kawabe |
Assembly
Sensing and Control
|
08 Oct 2020 |
G2000997-v1 |
LVK Status, June 2020 |
Keita Kawabe |
Operations
Detector
Commissioning
Public Talk / Colloquium
Astrophysics / Multi-messenger
|
29 Jun 2020 |
D2000251-v1 |
Optical table spacer (LHO) |
Keita Kawabe |
Sensing and Control
|
01 Jun 2020 |
T060035-x0 |
Orientation of Quadrant Diode for Wave Front Sensing |
Keita Kawabe |
Sensing and Control
Commissioning
|
07 May 2020 |
G2000497-v2 |
O3 LIGO-Virgo-KAGRA Update, April 2020 |
Keita Kawabe et al. |
Operations
Detector
Public Talk / Colloquium
Astrophysics / Multi-messenger
|
02 Apr 2020 |
T1900364-v5 |
Radio Frequency Noise Reduction in the LIGO Hanford Observatory |
Matthew Withers et al. |
Detector
|
01 Mar 2020 |
G2000246-v4 |
O3 LIGO-Virgo-KAGRA Update, February 2020 |
Nicolas Arnaud et al. |
Detector
Public Talk / Colloquium
Astrophysics / Multi-messenger
Public relations
|
20 Feb 2020 |
G2000062-v5 |
O3 LIGO-Virgo-KAGRA Update, January 2020 |
Keita Kawabe et al. |
Detector
Public Talk / Colloquium
Astrophysics / Multi-messenger
Public relations
|
16 Jan 2020 |
G1902213-v4 |
O3 LIGO-Virgo-KAGRA Update |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
|
21 Nov 2019 |
G1902055-v2 |
O3 commissioning break update |
Keita Kawabe et al. |
Detector
Commissioning
Astrophysics / Multi-messenger
|
23 Oct 2019 |
P1500248-v15 |
Calibration of the Advanced LIGO detectors for the discovery of the binary black-hole merger GW150914 |
LIGO Scientific Collaboration et al. |
Calibration
|
13 Oct 2019 |
G1901885-v2 |
O3 LIGO-Virgo-KAGRA Update |
Keita Kawabe et al. |
Detector
|
26 Sep 2019 |
G1901482-v2 |
O3 LIGO-Virgo-KAGRA Update |
Keita Kawabe et al. |
Public Talk / Colloquium
|
15 Aug 2019 |
G1901349-v4 |
O3 LIGO-Virgo-KAGRA Update, July 18 2019 |
Joseph Betzwieser et al. |
Operations
Detector
Astrophysics / Multi-messenger
|
18 Jul 2019 |
G1901130-v2 |
O3 LIGO-Virgo (and KAGRA) update, June 20 2019 |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
|
19 Jun 2019 |
G1901007-v2 |
Detectors in O3 for the LV-EM meeting |
Lisa Barsotti et al. |
Astrophysics / Multi-messenger
|
23 May 2019 |
G1900994-v2 |
The Retraction of S190518bb |
Alessio Rocchi et al. |
Data quality / vetoes
Compact Binaries
Detector Characterization
|
23 May 2019 |
G1900824-v10 |
Detectors and observations in O3 for the LV-EM meeting |
Alessio Rocchi et al. |
Detector
Astrophysics / Multi-messenger
|
25 Apr 2019 |
P080118-v3 |
Precise calibration of LIGO test mass actuators using photon radiation pressure |
Daniel Sigg et al. |
Calibration
|
16 Mar 2019 |
P0900155-v6 |
Accurate calibration of test mass displacement in the LIGO interferometers |
Jeffrey Kissel et al. |
Calibration
Observatory Facilities
Commissioning
|
16 Mar 2019 |
T1800265-v1 |
RF Noise Sources and GPS Jitter at LHO |
Nolan King et al. |
Sensing and Control
Basic R&D
|
16 Mar 2019 |
G1900437-v2 |
Detectors and Observation in O3 |
Keita Kawabe et al. |
Detector
Astrophysics / Multi-messenger
|
14 Mar 2019 |
G1900213-v5 |
Detectors and observations in O3 |
Keita Kawabe et al. |
Operations
Detector
Astrophysics / Multi-messenger
|
14 Feb 2019 |
L1800079-v4 |
O3 coincident observation strategy |
Brian O'Reilly et al. |
Policies
|
12 Feb 2019 |
D1201448-v9 |
ISCTEX Optical Layout |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
16 Mar 2015 |
G1802174-v3 |
Status of LIGO and Virgo and timeline of ER13, ER14 and O3 |
Lisa Barsotti et al. |
Operations
|
14 Nov 2018 |
E1100440-v5 |
aLIGO HAM Tip-Tilt Suspension Assembly Procedure |
Bram Slagmolen et al. |
Assembly
Sensing and Control
|
05 Oct 2018 |
P1700260-v13 |
Improving astrophysical parameter estimation via offline noise subtraction for Advanced LIGO |
Jenne Driggers et al. |
Detector
Cleaning
|
25 May 2018 |
G1800395-v5 |
Post O2 Installation and Commissioning |
Brian O'Reilly et al. |
Public Talk / Colloquium
Public relations
|
16 Mar 2018 |
T1700332-v1 |
RF Leakage Studies & GPS Signal Phase Jitter Analysis |
John Schaefer et al. |
Sensing and Control
|
19 Feb 2018 |
G1701180-v1 |
Measuring Scattering Off of LIGO Test Masses |
Christian Pluchar et al. |
Core Optics
|
19 Feb 2018 |
G1701194-v1 |
LIGO detectors in O2 and beyond |
Keita Kawabe et al. |
Detector
|
09 Jul 2017 |
P170104-v12 |
GW170104: Observation of a 50-Solar-Mass Binary Black Hole Coalescence at Redshift 0.2 |
LIGO Scientific Collaboration et al. |
Compact Binaries
|
01 Jun 2017 |
T1600385-v1 |
Developing a Coherent Search Algorithm to Identify Phase Modulated Continuous Gravitational Wave Sources |
Camilla Compton et al. |
Continuous Wave
|
11 Jan 2017 |
T1600390-v2 |
ITM Camera Focuser Control Interface and Calibration |
Chen-Jie Xin et al. |
Installation
Basic R&D
|
03 Jan 2017 |
T1000317-v1 |
Mode Matching Telescope for Advanced LIGO Output Mode Cleaners |
Keita Kawabe |
Detector
|
26 Oct 2016 |
G1601973-v1 |
Status: New ISS second loop board and related things |
Keita Kawabe et al. |
Commissioning
|
23 Sep 2016 |
G1601542-v1 |
ITM Camera Focuser Control Interface and Calibration (Midterm Presentation) |
Chen-Jie Xin et al. |
Installation
Basic R&D
|
19 Aug 2016 |
G1601659-v1 |
ITM Camera Focuser Control Interface and Calibration (Final Presentation) |
Chen-Jie Xin et al. |
Installation
Basic R&D
|
18 Aug 2016 |
E1600204-v1 |
ECR: PSL frontend should handle a binary output ON/OFF request as true binary, not a 16 bit integer |
Keita Kawabe |
Integration
Laser Systems
|
12 Jul 2016 |
T1500542-v2 |
Cavity Alignment Using Fringe Scanning: LIGO SURF Final Report |
Laura Sinkunaite et al. |
Sensing and Control
Data analysis software
|
23 Dec 2015 |
G1501275-v2 |
Gravitational Wave Experiments |
Keita Kawabe et al. |
Public Talk / Colloquium
|
16 Dec 2015 |
T1500461-v3 |
Frequency Response of the aLIGO Interferometer: part2 |
Kiwamu Izumi et al. |
Modelling
|
14 Dec 2015 |
E1500432-v1 |
Add RF centering to AS wavefront sensors |
Keita Kawabe |
Sensing and Control
|
04 Dec 2015 |
T1500559-v3 |
Frequency Response of the aLIGO Interferometer: part3 |
Kiwamu Izumi et al. |
Modelling
|
02 Dec 2015 |
E1500373-v1 |
Add critical duotone readback channels in science frames at 16kHz for OMC and PCAL |
Keita Kawabe |
Calibration
|
04 Sep 2015 |
E1500272-v2 |
ECR: Move HAM6 BDV2 and corresponding V-beam dump to the upstream of QPD sled and beam splitter. |
Keita Kawabe et al. |
Sensing and Control
Installation
System Engineering
|
25 Jun 2015 |
T1100476-v2 |
H2 TMS Y QPD Sled - As Built |
Bram Slagmolen et al. |
Assembly
Sensing and Control
|
17 Jun 2015 |
G1500698-v1 |
Summary of Controls Sessions (GWADW 2015) |
Dennis Coyne et al. |
System Engineering
|
01 Jun 2015 |
G1500694-x0 |
Keeping a good lock |
Keita Kawabe |
Meeting
Integration
Commissioning
|
20 May 2015 |
G1500664-v1 |
Post-Facto Noise Subtraction, Bilinear Coupling |
Keita Kawabe et al. |
Meeting
|
19 May 2015 |
E1300483-v5 |
ALS Components BOM |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
17 Mar 2015 |
E1500169-v1 |
ECR to remove ALS-PD6 from all ISCTEX and ISCTEY |
Keita Kawabe |
Sensing and Control
Installation
|
12 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Sensing and Control
Integration
Basic R&D
|
05 Mar 2015 |
T1300903-v4 |
ISC End Station User's Manual |
Daniel Sigg et al. |
Sensing and Control
|
04 Mar 2015 |
T1400371-v2 |
Installation and Alignment procedure for the ISC components in HAM3 |
Valery Frolov et al. |
Sensing and Control
Installation
|
11 Feb 2015 |
E1200453-v6 |
Fine Initial Alignment Procedure of the Transmission Monitor Telescope |
Keita Kawabe et al. |
Installation
|
22 Jan 2015 |
T1200433-v4 |
H1 HAM3 Gouy Telescope Preparation |
Keita Kawabe et al. |
Installation
Fabrication
|
21 Jan 2015 |
T1200555-v2 |
H1 HAM1 Gouy Telescope Preparation |
Keita Kawabe et al. |
Installation
Fabrication
|
21 Jan 2015 |
T1000311-v7 |
aLIGO TransMonSUS Assembly & Installation Hazards Analysis |
Ken Mailand et al. |
Final Design
Safety
Auxiliary Optics
|
21 Jan 2015 |
T1400588-v1 |
HAM6 Alignment procedure |
Koji Arai et al. |
Sensing and Control
Installation
|
22 Dec 2014 |
E1300887-v3 |
aLIGO HAM Tip-Tilt Suspension Testing and Installation Procedure |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
27 Nov 2014 |
E1300888-v3 |
aLIGO HAM Tip-Tilt Suspension Test Plan |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
26 Nov 2014 |
T1100603-v2 |
TMS Telescope Alignment Procedure |
Keita Kawabe et al. |
Installation
Final Design
Auxiliary Optics
|
17 Nov 2014 |
G1401257-v1 |
Initial alignment at LHO: status and plans |
Kiwamu Izumi et al. |
Commissioning
|
28 Oct 2014 |
E1201012-v8 |
TransMonSUS Assembly & Installation Procedure |
Ken Mailand et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
22 Oct 2014 |
G1400813-v1 |
Comparison of Best Strain Sensitivity for the iLIGO Science Runs |
Keita Kawabe |
Calibration
|
28 Jul 2014 |
E1400313-v1 |
Realignment plan for H1 TMSX IR QPD sled, July 2014 |
Keita Kawabe |
Sensing and Control
Installation
|
08 Jul 2014 |
L1400110-x0 |
Executive Summary of the LHO HIFO-XY Test |
Daniel Sigg et al. |
Integration
|
08 Jul 2014 |
E1201002-v1 |
ECR: change the IO_MB_M2 beam splitter on the PSL table |
Alberto Stochino et al. |
Installation
|
19 Jun 2014 |
T1300712-v2 |
Summary of H1 HIFO-Y results |
Sheila Dwyer et al. |
Sensing and Control
|
18 Jun 2014 |
T1300174-v2 |
Commissioning Advanced LIGO’s HIFO-Y |
Daniel Sigg et al. |
Integration
System Engineering
Commissioning
|
18 Jun 2014 |
L1300176-v1 |
Executive Summary of the LHO HIFO-Y Test |
Daniel Sigg et al. |
Integration
|
18 Jun 2014 |
T1400385-v2 |
Incursion/installation plan for WHAM6, June 2014 |
Keita Kawabe et al. |
Installation
|
10 Jun 2014 |
T1300161-v1 |
ALS/POP beam path alignment in WHAM3/1 |
Keita Kawabe et al. |
Input Optics
Sensing and Control
Installation
|
30 May 2014 |
T1200559-v1 |
H1 EX TransMon QPD sled tuning |
Keita Kawabe et al. |
Sensing and Control
Installation
Fabrication
|
13 May 2014 |
G1101254-v2 |
H1 TransMonEy Telescope focal tuning results |
Keita Kawabe et al. |
Sensing and Control
Installation
Auxiliary Optics
|
13 May 2014 |
G1400514-v1 |
H1 TransMonEx Telescope focal tuning results |
Keita Kawabe |
Subsystem Test
Installation
|
07 May 2014 |
T1300464-v1 |
Sidebands on Sidebands in Finesse |
Keita Kawabe |
Modelling
Sensing and Control
|
06 Dec 2013 |
L1200261-v2 |
Executive Summary of the One Arm Test |
Daniel Sigg et al. |
Integration
|
16 Aug 2013 |
T1300613-v1 |
Scattering on aLIGO Transmission Monitor (TransMon) Optics |
Keita Kawabe |
Auxiliary Optics
|
02 Jul 2013 |
G1300531-v3 |
Advanced LIGO |
Keita Kawabe |
Public Talk / Colloquium
|
06 Jun 2013 |
T1300419-v1 |
OFI 1st Article Data_hanford iLog |
Keita Kawabe |
System Test
Auxiliary Optics
|
25 Apr 2013 |
M1100185-v2 |
Temporarily Standard Operating Procedure for In-vacuum Work for Squeezing Experiment |
Keita Kawabe et al. |
Safety
|
10 Apr 2013 |
T1100600-v3 |
Requirement For Adjustment Procedure Of Advanced LIGO Transmission Monitor Telescope |
Keita Kawabe |
Auxiliary Optics
|
08 Apr 2013 |
G1100189-v13 |
Photon Calibrator Investigations During S6 |
Jonathan Berliner et al. |
Calibration
|
19 Mar 2013 |
T1300158-v2 |
Arm cavity geometry for H1 ALS test with X and Y arm |
Keita Kawabe |
Sensing and Control
Core Optics
Commissioning
|
18 Mar 2013 |
G1300050-v3 |
Output Mode Cleaners |
Keita Kawabe et al. |
Commissioning
|
28 Jan 2013 |
P1100166-v4 |
Controlling calibration errors in gravitational-wave detectors by precise location of calibration forces |
Hernan Daveloza et al. |
Modelling
Collaboration
Calibration
Core Optics
|
24 Dec 2012 |
G1200753-v1 |
aLIGO H2 One Arm Test Update |
Keita Kawabe et al. |
Detector
Commissioning
|
03 Dec 2012 |
E1201011-x0 |
TransMonSUS Assembly & Installation Procedure |
Ken Mailand et al. |
Sensing and Control
Final Design
Auxiliary Optics
|
12 Nov 2012 |
T1200475-v1 |
Use of Green Beam for IR QPD Path on Transmission Monitor Telescope |
Keita Kawabe |
Installation
Fabrication
|
08 Oct 2012 |
M1200320-v1 |
Standard Operating Procedure for Prometheus Dual Wave Length Laser in the OSB Optics Lab at LHO |
Keita Kawabe et al. |
Safety
|
24 Sep 2012 |
M1200295-v1 |
Standard Operating Procedure for OzOptics IR laser in the OSB Optics Lab at LHO |
Keita Kawabe et al. |
Safety
|
07 Sep 2012 |
M1200283-v1 |
Standard Operating Procedure (SOP) for End Station Optics Labs at LHO |
Keita Kawabe et al. |
Safety
|
24 Aug 2012 |
T1200200-v1 |
H2 One Arm Test Beam Geometry |
Keita Kawabe et al. |
Commissioning
|
07 May 2012 |
D1200658-x0 |
Flexible Tube Mount, 10in, ISC Table, aLIGO |
Sam Barnum et al. |
Final Design
Auxiliary Optics
|
27 Apr 2012 |
T1200145-x0 |
Frequency Domain Calibration of Post-S6 Squeezing Experiment for LIGO H1 Instrument |
Keita Kawabe |
Calibration
|
22 Mar 2012 |
T1100071-v9 |
Frequency Domain Calibration Error Budget of LIGO Instruments in S6 |
Keita Kawabe et al. |
Calibration
Detector
|
06 Jan 2012 |
T1100443-v1 |
H1 HAM6 vent plan for cleaning eLIGO OMC |
Keita Kawabe |
Commissioning
|
15 Aug 2011 |
G050111-v1 |
Summary of recent measurements of g factor changes induced by thermal loading in the H1 interferometer |
Joseph Betzwieser et al. |
Core Optics
Commissioning
Cleaning
Auxiliary Optics
|
07 Jun 2011 |
T050074-x0 |
Optical Absorption in Initial LIGO Interferometers |
Stefan Ballmer et al. |
Core Optics
Commissioning
Cleaning
Auxiliary Optics
|
05 Jun 2011 |
T1000227-v1 |
Summary of S5 Calibration Models and Uncertainties |
Keita Kawabe et al. |
Calibration
Detector
|
09 Aug 2010 |
P070137-x0 |
Status of LIGO |
Keita Kawabe |
Document Migration
Public relations
|
19 Oct 2009 |
T0900189-v1 |
Vibrational Transfer Function and the Sound Velocity in a Finite Elastic Body |
Keita Kawabe |
Basic R&D
Suspensions
|
20 Apr 2009 |
G0900202-x0 |
Enhanced LIGO Commissioning Update |
Keita Kawabe |
Commissioning
|
17 Mar 2009 |
E0900097-v1 |
LHO HAM6 incursion procedure – Mar 09 |
Keita Kawabe et al. |
Sensing and Control
|
01 Apr 2009 |
T080242-x0 |
S5 V3 h(t) Review and Validation |
Joseph Betzwieser et al. |
Document Migration
|
22 Sep 2008 |
T080082-x0 |
E-LIGO Wavefront Sensor Telescope Upgrade |
Muzammil Arain et al. |
Document Migration
|
14 Apr 2008 |
G080102-x0 |
Calibration Review - LSC/Virgo Collaborations Meeting @ Caltech, March 17-20, 2008 |
Keita Kawabe |
Document Migration
|
04 Apr 2008 |
T070274-x0 |
Making use of Spring Compensation (SC) system for 2K |
Eiichi Hirose et al. |
Document Migration
|
09 Nov 2007 |
G070617-x0 |
Status of LIGO |
Keita Kawabe |
Document Migration
|
02 Oct 2007 |
G060164-x0 |
Current status of USA LIGO experiment and international collaboration (mostly in Japanese) |
Keita Kawabe |
Document Migration
|
01 May 2006 |
G060186-x0 |
Coherent searches for periodic gravitational waves from unknown isolated sources and Scorpius X-1: results from the second LIGO science run. |
Keita Kawabe |
Document Migration
|
01 May 2006 |
G050324-x0 |
Plans for DC Readout Experiment at the 40m Lab |
Benjamin Abbott et al. |
Document Migration
|
08 Sep 2005 |
G040326-x0 |
Design and Performance of the Output Mode Cleaner |
Keita Kawabe |
Document Migration
|
23 Jun 2005 |
G050362-x0 |
Measurement of Thermally Induced Test Mass Surface Curvature Changes in a LIGO 4-km Interferometer - 6th Edoardo Amaldi Conference on Gravitational Waves |
Keita Kawabe et al. |
Document Migration
|
20 Jun 2005 |
G050085-x0 |
H1 arm cavity g factor changes resulting from 1064 nm heating |
Joseph Betzwieser et al. |
Document Migration
|
15 Mar 2005 |
G050076-x0 |
In-situ Measurements of Thermally-Induced Input Test Mass Curvature Changes |
Keita Kawabe et al. |
Document Migration
|
24 Feb 2005 |
T050030-x0 |
Summary of H1 g factor measurements |
Joseph Betzwieser et al. |
Document Migration
|
24 Feb 2005 |
T040158-x0 |
Excess Noise Mechanism in LIGO Output Mode Cleaner |
Joseph Betzwieser et al. |
Document Migration
|
26 Aug 2004 |
T040156-x0 |
Study of the Output Mode Cleaner Prototype using the Phasecamera |
Joseph Betzwieser et al. |
Document Migration
|
23 Aug 2004 |
G040415-x0 |
Study of the Output Mode Cleaner Prototype Using the Phasecmaera - LSC Meeting, August 16th-19th, 2004, Hanford WA |
Joseph Betzwieser et al. |
Document Migration
|
20 Aug 2004 |
T000080-x0 |
Study of Power Recycling of a Fabry-Perot-Michelson Interferometer |
Masaki Ando et al. |
Document Migration
|
15 Aug 2000 |