LIGO Document T1000049-v3
- The procedure for rehanging the test mass of the NP quad at LASTI on fused silica fibres. Includes removal from the tank, bonding ears to the test mass and PM, production and welding of fibres, and reinstallation.
This is still a work in progress but is available on the DCC for comments and revision.
- -v3 incorporates revisions to sections 2.1 to 2.4 based on the recent experience at LASTI preparing the quad for the welding.
DCC Version 3.4.3, contact
Document Database Administrators