LIGO Document E1000313-v2
- HAM-ISI Unit #4 was built in March 2012. Tests presented here were performed between March 28th 2012 and April 4th 2012.
Particularities:
------------------
-This Unit received two production GS13s from Unit #2
-Full set of production GS13
-L4C Brackets but no L4C
Complementary inquiry:
--------------------------------
Investigation of the effect of washers’ disposition/thickness on high frequency unwanted resonances/noise (LHO alog # 2520)
Minor issues that don’t imply further work:
----------------------------------------------------------
-CPS gap measurement with a jig was waived to avoid scratching targets
-Excessive STD measured on CPSs is associated to ground motion
Minor issues that imply further work:
---------------------------------------------------
-Actuators linearity is within requirement. However the average slope deviation is out of spec. It seems to correlate with the cable+actuator resistance measurements. This observation needs to be correlated with the final measurements made with the in-field cables.
- The assembly is validated.
Comments were added to failed tests.
DCC Version 3.4.3, contact
Document Database Administrators