Document List by Author

Eric Allwine of LIGO - Hanford Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T1100537-v3 HEPI Pump Servo VFD controls Eric Allwine et al. Subsystem Test
Seismic Isolation
Reports
05 Feb 2018
E1101149-v19 HEPI Pier Components - LHO Eric Allwine et al. Commissioning
Seismic Isolation
21 Oct 2015
Q1200009-v1 HEPI KAMAN INDUCTIVE POSITION SENSOR (IPS) CALIBRATION SHEETS Eric Allwine et al. Assembly
Seismic Isolation
14 Oct 2015
Q0900007-v1 LHO HEPI L4C Acceptance Testing Data Eric Allwine Seismic Isolation
10 Mar 2015
E0900426-v5 HEPI Kaman Sensor Receiving Analysis Hugh Radkins et al. Incoming Inspection
Seismic Isolation
10 Mar 2015
E1200507-v5 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1000324-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1000323-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2013
E1000311-v9 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 Hugo Paris et al. Seismic Isolation
Final Design
26 Jun 2013
E1000314-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000313-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000312-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 Hugo Paris et al. Subsystem Test
Seismic Isolation
24 May 2012
E1000310-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 Hugo Paris et al. Subsystem Test
Seismic Isolation
26 Apr 2012

Number of documents found: 13


DCC Version 3.4.2, contact Document Database Administrators