Document List by Author

Hugo Paris of Stanford University is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T1300559-v1 Changing the ISI CPS offsets to the Cartesian (CART) Basis Brian Lantz et al. Integration
Seismic Isolation
09 May 2022
E1000309-v13 aLIGO HAM-ISI Testing Procedure, Phase I: Assembly Validation Fabrice Matichard et al. Subsystem Test
Seismic Isolation
27 Feb 2013
T1600090-v2 04/01/16 HAM-ISI Model Update - Release Notes Hugo Paris et al. Seismic Isolation
01 Apr 2016
T1600062-v2 BSC-ISI model update Hugo Paris et al. Seismic Isolation
24 Mar 2016
T1500406-v3 SEI watchdog update - saturation history update Hugo Paris et al. Integration
Seismic Isolation
12 Aug 2015
T1400012-v1 Jan 2014 ISI update Brian Lantz et al. Integration
Seismic Isolation
24 Jun 2015
E1100276-v15 aLIGO HEPI Testing Documentation Sebastien Biscans et al. Subsystem Test
Seismic Isolation
25 Mar 2015
E1300823-v4 aLIGO HEPI H1 HAM1 Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
10 Mar 2015
E1300824-v3 aLIGO HEPI Assembly Validation Procedure Sebastien Biscans et al. Subsystem Test
Seismic Isolation
03 Mar 2015
E1200509-v1 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 5 (Unit #6) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1200508-v1 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 4 (Unit #7) Jim Warner Subsystem Test
Seismic Isolation
17 Feb 2015
E1200507-v5 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1200506-v4 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1300454-x0 aLIGO HEPI Testing Reports Fabrice Matichard et al. Subsystem Test
Seismic Isolation
12 Feb 2015
E1300838-v1 aLIGO HEPI H1 ITMX Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
12 Feb 2015
E1300839-v1 aLIGO HEPI H1 BS Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
11 Feb 2015
E1300840-v1 aLIGO HEPI H1 ITMY Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
11 Feb 2015
E1300841-v2 aLIGO HEPI H1 ETMY Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
09 Feb 2015
E1300830-v1 aLIGO HEPI H1 HAM4 Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Feb 2015
E1300831-v1 aLIGO HEPI H1 HAM5 Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
04 Feb 2015
E1300832-v1 aLIGO HEPI H1 HAM6 Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
03 Feb 2015
E1400104-x0 ECR: Replacing the Cart-Bias custom ramp parts with cdsFiltCrtl2 blocks Brian Lantz et al. State Control and Monitoring
Integration
Seismic Isolation
29 Jan 2015
G1401362-v1 HEPI update, bias hold and watchdog Brian Lantz et al. Integration
Installation
Seismic Isolation
08 Dec 2014
E1100427-v4 aLIGO SEI Testing, HAM-ISI, Results Compilation Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2014
E1000330-v3 aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #6 Fabrice Matichard et al. Subsystem Test
Seismic Isolation
26 Oct 2014
E1000331-v3 aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #7 Fabrice Matichard et al. Subsystem Test
Seismic Isolation
26 Oct 2014
E1300829-v2 aLIGO HEPI H1 HAM3 Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
16 Jul 2014
E1300828-v2 aLIGO HEPI H1 HAM2 Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
16 Jul 2014
E1300837-v1 aLIGO HEPI H1 ETMX Assembly Validation Report Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100849-v3 aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #5 - BSC9 - ETMX Jim Warner et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100848-v8 aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #4 - BSC3 - ITMX Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
G1201026-v1 LHO HAM ISI Operator Training Session Hugo Paris et al. Operations
Seismic Isolation
18 Jun 2014
G1200757-v1 HAM-ISI MEDM screens and troubleshooting for LHO Operators Hugo Paris Operations
Seismic Isolation
18 Jun 2014
E1200080-v2 List of HAM-ISIs with feedforward L4Cs Hugo Paris Installation
Seismic Isolation
18 Jun 2014
E1200510-v1 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 6 Hugo Paris Subsystem Test
18 Jun 2014
E1000324-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
Q1100073-v32 Seismometer and Pod Issue Tracking Michael Vargas et al. Assembly
Requirements
Subsystem Test
Seismic Isolation
18 Jun 2014
G1300769-v2 HAM-ISI Guardian State Evolution Brian Lantz et al. Conceptual Design
State Control and Monitoring
Seismic Isolation
20 Jan 2014
T1300936-v1 HEPI model updates Nov 2013 Brian Lantz et al. Integration
Installation
Seismic Isolation
09 Dec 2013
E1300872-v1 ECR - HEPI model updates Nov 2013 Brian Lantz et al. Integration
Seismic Isolation
09 Dec 2013
E1000323-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2013
E1000311-v9 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 Hugo Paris et al. Final Design
Seismic Isolation
26 Jun 2013
E1100995-v10 aLIGO HAM-ISI Testing Procedure, Phase III: Control Commissioning Sebastien Biscans et al. Subsystem Test
Seismic Isolation
23 Apr 2013
E1100994-v6 aLIGO HAM-ISI Testing Procedure, Phase II : Integration process Fabrice Matichard et al. Subsystem Test
Seismic Isolation
23 Apr 2013
E1300256-v1 Updates to ISI Master Models: MASTER Block Revision, Watchdog Display Update Brian Lantz et al. Data Acquisition System
Installation
Seismic Isolation
03 Apr 2013
E1000314-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000313-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000312-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 Hugo Paris et al. Subsystem Test
Seismic Isolation
24 May 2012
E1000310-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 Hugo Paris et al. Subsystem Test
Seismic Isolation
26 Apr 2012

Number of documents found: 49


DCC Version 3.4.3, contact Document Database Administrators