Document List by Author

Jim Warner of LIGO - Hanford Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
T2200025-v2 Update to the BLRMS Code: Custom BLRMS, Transposed Direct Form 2, and Reduced DC Order Nathan Holland et al. Seismic Isolation
08 Aug 2022
T2100269-v1 Comparing Wind-Driven Motion at LHO’s Corner and End Stations Between O3a and O3b Andrew Gao et al. Seismic Isolation
Observatory Facilities
12 Jul 2021
P1800038-v4 Towards windproofing LIGO: Reducing the effect of wind-driven floor tilt by using rotation sensors in active seismic isolation. Krishna Venkateswara et al. Seismic Isolation
Basic R&D
12 Mar 2020
T1900768-v4 SEI Roadmap - Plans and Ideas for better isolation and control for Advanced LIGO Brian Lantz et al. Seismic Isolation
26 Dec 2019
T1900777-v1 Reducing differential motion using CPS sensors Chiara DiFronzo et al. Seismic Isolation
20 Nov 2019
T1900107-v1 Some thoughts on Controlling SRCL Sam Cooper et al. Sensing and Control
Seismic Isolation
Suspensions
19 Nov 2019
T1800066-v2 typical motion of HAM Suspension points in O2 Brian Lantz et al. Installation
Seismic Isolation
17 Dec 2018
G1800399-v1 Seismic Control during Earthquakes: Review of new technique Brian Lantz et al. Seismic Isolation
Integration
14 Dec 2018
P1700149-v7 Tilt Seismology Michael Ross et al. Seismic Isolation
11 Jul 2017
P1500278-v4 Subtracting tilt from a horizontal-seismometer using a ground-rotation-sensor Krishna Venkateswara et al. Seismic Isolation
Basic R&D
14 Dec 2016
E1000486-v6 aLIGO BSC-ISI Testing Procedure, Phase I: Assembly Validation Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
16 Mar 2015
E1000487-v8 aLIGO BSC-ISI Testing Procedure, Phase II : Integration process Fabrice Matichard et al. Subsystem Test
Seismic Isolation
16 Mar 2015
E1200509-v1 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 5 (Unit #6) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1200508-v1 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 4 (Unit #7) Jim Warner Subsystem Test
Seismic Isolation
17 Feb 2015
E1200507-v5 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1200506-v4 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1100303-v1 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #10 Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
09 Feb 2015
E1100847-v1 aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #3 BSC2 BS Jim Warner Subsystem Test
Seismic Isolation
28 Jan 2015
D1001797-v2 aLIGO Installation, LHO Y-End Station, Cartridge & Cleanroom, Layout Dennis Coyne Installation
14 Jan 2015
E1100302-v2 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #9 Jim Warner Subsystem Test
Seismic Isolation
19 Nov 2014
E1100849-v3 aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #5 - BSC9 - ETMX Jim Warner et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100848-v8 aLIGO BSC-ISI, Test Report, Phase 2, LHO Unit #4 - BSC3 - ITMX Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100299-v4 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #6 Jim Warner Subsystem Test
Seismic Isolation
18 Jun 2014
G1201026-v1 LHO HAM ISI Operator Training Session Hugo Paris et al. Operations
Seismic Isolation
18 Jun 2014
E1000324-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1000323-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2013
E1000311-v9 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 Hugo Paris et al. Final Design
Seismic Isolation
26 Jun 2013
D070107-v2 HAM6 Septum Plate for ELIGO Jim Warner Final Design
Vacuum
10 Jun 2013
E1000314-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000313-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000312-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 Hugo Paris et al. Subsystem Test
Seismic Isolation
24 May 2012
E1000310-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 Hugo Paris et al. Subsystem Test
Seismic Isolation
26 Apr 2012
D1002314-v2 BSC ISI Stage 0 Plate Flip Bracket Hugh Radkins et al. Assembly
Seismic Isolation
10 Mar 2011
D0900946-v4 D0900946 Adapter A-16, 44 1/4" I.D. x 60 1/2" I.D., LIGO Vacuum Equipment Dennis Coyne et al. System Engineering
Final Design
Vacuum
23 Aug 2010
D1000188-v1 44 5/8" Grooved and slotted flange John Worden et al. Vacuum
11 May 2010
D1000245-v1 IO Tubes CORNER STATION LAYOUT John Worden et al. Vacuum
02 Feb 2010
D0902724-v2 84.25 IN Flange - Flat Faced (PSI Ref. V0494127) John Worden et al. Vacuum
11 Jan 2010
D0900928-v2 D0900928 Vacuum Equipment Layout, Right End Station, LHO, Adv. LIGO John Worden et al. System Engineering
Vacuum
Integration
11 Jan 2010

Number of documents found: 38