LIGO-Number |
Title |
Author(s) |
Topic(s) |
Last Updated |
P2400364-v1 |
LIGO Spectra special edition comic |
Joey Key et al. |
Education, Outreach
|
21 Aug 2024 |
E1000671-v1 |
aLIGO ISC Optics: 1" and 2" 50:50 beam splitters |
Lisa Barsotti et al. |
Auxiliary Optics
|
15 Mar 2013 |
E980268-x0 |
HAM Seismic Installation Procedure, Rev. 03 |
Dennis Coyne et al. |
Document Migration
|
23 Apr 2021 |
D2000493-x0 |
4' x 8' Enclosure for ISC, SQZ and IO Tables (one sided panels) |
Daniel Sigg et al. |
Sensing and Control
|
08 Oct 2020 |
D1201103-v16 |
ISCT1 Optical Layout |
Adam Mullavey et al. |
Sensing and Control
Installation
|
19 Jan 2015 |
E1300450-v6 |
FMP Acceptance-Facility Modifications |
Carolyn Peterson et al. |
Observatory Facilities
|
26 Sep 2017 |
G1600721-v2 |
509 Salsa LIGO Tour |
Corey Gray |
Education, Outreach
|
19 Mar 2016 |
G1600397-v1 |
GW150914: Beginning A New Era For LIGO & Gravitational Wave Astronomy |
Corey Gray |
Detector
Public Talk / Colloquium
Compact Binaries
Education, Outreach
|
03 Mar 2016 |
E1300483-v5 |
ALS Components BOM |
Bram Slagmolen et al. |
Sensing and Control
Installation
|
17 Mar 2015 |
P1400105-v5 |
Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer |
Alexa N Staley et al. |
Sensing and Control
Integration
Basic R&D
|
05 Mar 2015 |
E1200507-v5 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
E1200506-v4 |
aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) |
Hugo Paris et al. |
Subsystem Test
|
17 Feb 2015 |
T1200433-v4 |
H1 HAM3 Gouy Telescope Preparation |
Keita Kawabe et al. |
Installation
Fabrication
|
21 Jan 2015 |
T1200555-v2 |
H1 HAM1 Gouy Telescope Preparation |
Keita Kawabe et al. |
Installation
Fabrication
|
21 Jan 2015 |
E1000324-v1 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
18 Jun 2014 |
T1400385-v2 |
Incursion/installation plan for WHAM6, June 2014 |
Keita Kawabe et al. |
Installation
|
10 Jun 2014 |
G990046-x0 |
Seismic Isolation Installation - PAC 6 Meeting Presentation, 20-21 May 1999 - Hanford Observatory |
Corey Gray |
Document Migration
|
16 May 2014 |
T1200559-v1 |
H1 EX TransMon QPD sled tuning |
Keita Kawabe et al. |
Sensing and Control
Installation
Fabrication
|
13 May 2014 |
D1301029-v1 |
PSL Table Photo Layout for H1 Advanced LIGO |
Corey Gray |
Assembly
Detector
Laser Systems
|
13 Dec 2013 |
E1000323-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
05 Nov 2013 |
E1000311-v9 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 |
Hugo Paris et al. |
Final Design
Seismic Isolation
|
26 Jun 2013 |
G1201071-v3 |
Complexities in Operating Large-scale Gravitational Wave Interferometers |
Corey Gray |
Public Talk / Colloquium
|
29 Apr 2013 |
G1300440-v1 |
Environmentors Poster Presentation |
Corey Gray |
Education, Outreach
|
09 Apr 2013 |
E1000314-v3 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
28 Jun 2012 |
E1000313-v2 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
28 Jun 2012 |
E1000312-v5 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
24 May 2012 |
E1000310-v7 |
aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 |
Hugo Paris et al. |
Subsystem Test
Seismic Isolation
|
26 Apr 2012 |
M990034-v2 |
OBSOLETE |
Richard Savage et al. |
Operations
Policies
Observatory Facilities
|
01 Aug 2011 |
P080016-x0 |
The LSC glitch group: monitoring noise transients during the fifth LIGO science run |
Robert Schofield et al. |
Document Migration
Public relations
|
22 Oct 2009 |
E0900075-v1 |
Response to HAM-ISI Watchdog Committee Recommendations |
Jeffrey Kissel et al. |
Seismic Isolation
Commissioning
|
09 Mar 2009 |
E080181-x0 |
Process Traveler - stainless-conflats_blanks_shims |
Corey Gray |
Document Migration
|
22 Nov 2008 |
E080122-x0 |
Process Traveler - SEI_LHO_helicoils_stainless |
Corey Gray |
Document Migration
|
12 May 2008 |
E070332-x0 |
Process Traveler - SEI-LHO-feedthroughs from HPD |
Corey Gray |
Document Migration
|
25 Apr 2008 |
E080007-x0 |
Process Traveler - steel bolts for LLO |
Corey Gray |
Document Migration
|
25 Apr 2008 |
G080246-x0 |
Activities of the LSC glitch group during S5 |
Lindy Blackburn et al. |
Document Migration
|
11 Apr 2008 |
E080085-x0 |
EXTERNAL SEI INSTALLATION FOR HAM6 |
Corey Gray |
Document Migration
|
27 Feb 2008 |
T070122-x0 |
Facilities Modifications and Preparations Conceptual Design |
Betsy Weaver et al. |
Document Migration
|
19 Jun 2007 |
G060666-x0 |
LIGO Photon Calibrators |
Evan Goetz et al. |
Document Migration
|
22 Dec 2006 |
D040118-x0 |
2k Photon Calibrator Optical Layout |
Corey Gray |
Document Migration
|
06 May 2004 |
D040116-x0 |
4k Photon Calibrator Optical Layout |
Corey Gray |
Document Migration
|
06 May 2004 |
T000005-x0 |
2k FMy Pendulum Q |
Betsy Weaver et al. |
Document Migration
|
29 Sep 2000 |
G000262-x0 |
Source and Propagation of Predominant 1-50 HZ Seismic Signal from Off-Site at LIGO-Hanford - LSC Meeting at Hanford, August 15-17, 2000 |
Gabriela Gonzalez et al. |
Document Migration
|
20 Sep 2000 |