Document List by Author

Corey Gray of LIGO - Hanford Observatory is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
E1000671-v1 aLIGO ISC Optics: 1" and 2" 50:50 beam splitters Lisa Barsotti et al. Auxiliary Optics
15 Mar 2013
E980268-x0 HAM Seismic Installation Procedure, Rev. 03 Dennis Coyne et al. Document Migration
23 Apr 2021
D2000493-x0 4' x 8' Enclosure for ISC, SQZ and IO Tables (one sided panels) Daniel Sigg et al. Sensing and Control
08 Oct 2020
D1201103-v16 ISCT1 Optical Layout Adam Mullavey et al. Sensing and Control
Installation
19 Jan 2015
E1300450-v6 FMP Acceptance-Facility Modifications Carolyn Peterson et al. Observatory Facilities
26 Sep 2017
G1600721-v2 509 Salsa LIGO Tour Corey Gray Education, Outreach
19 Mar 2016
G1600397-v1 GW150914: Beginning A New Era For LIGO & Gravitational Wave Astronomy Corey Gray Detector
Public Talk / Colloquium
Compact Binaries
Education, Outreach
03 Mar 2016
E1300483-v5 ALS Components BOM Bram Slagmolen et al. Sensing and Control
Installation
17 Mar 2015
P1400105-v5 Achieving Resonance in the Advanced LIGO Gravitational-Wave Interferometer Alexa N Staley et al. Sensing and Control
Integration
Basic R&D
05 Mar 2015
E1200507-v5 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 3 (Unit #5) Hugo Paris et al. Subsystem Test
17 Feb 2015
E1200506-v4 aLIGO HAM-ISI, Pre-Installation Test Report, Phase II, LHO HAM 2 (Unit #4) Hugo Paris et al. Subsystem Test
17 Feb 2015
T1200433-v4 H1 HAM3 Gouy Telescope Preparation Keita Kawabe et al. Installation
Fabrication
21 Jan 2015
T1200555-v2 H1 HAM1 Gouy Telescope Preparation Keita Kawabe et al. Installation
Fabrication
21 Jan 2015
E1000324-v1 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #7 (HAM4) Hugo Paris et al. Subsystem Test
Seismic Isolation
18 Jun 2014
T1400385-v2 Incursion/installation plan for WHAM6, June 2014 Keita Kawabe et al. Installation
10 Jun 2014
G990046-x0 Seismic Isolation Installation - PAC 6 Meeting Presentation, 20-21 May 1999 - Hanford Observatory Corey Gray Document Migration
16 May 2014
T1200559-v1 H1 EX TransMon QPD sled tuning Keita Kawabe et al. Sensing and Control
Installation
Fabrication
13 May 2014
D1301029-v1 PSL Table Photo Layout for H1 Advanced LIGO Corey Gray Assembly
Detector
Laser Systems
13 Dec 2013
E1000323-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #6 (HAM5) Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2013
E1000311-v9 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #2 Hugo Paris et al. Final Design
Seismic Isolation
26 Jun 2013
G1201071-v3 Complexities in Operating Large-scale Gravitational Wave Interferometers Corey Gray Public Talk / Colloquium
29 Apr 2013
G1300440-v1 Environmentors Poster Presentation Corey Gray Education, Outreach
09 Apr 2013
E1000314-v3 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #5 (HAM3) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000313-v2 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #4 (HAM2) Hugo Paris et al. Subsystem Test
Seismic Isolation
28 Jun 2012
E1000312-v5 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #3 Hugo Paris et al. Subsystem Test
Seismic Isolation
24 May 2012
E1000310-v7 aLIGO HAM-ISI, Test Report, Phase I: Assembly Validation, LHO Unit #1 Hugo Paris et al. Subsystem Test
Seismic Isolation
26 Apr 2012
M990034-v2 OBSOLETE Richard Savage et al. Operations
Policies
Observatory Facilities
01 Aug 2011
P080016-x0 The LSC glitch group: monitoring noise transients during the fifth LIGO science run Robert Schofield et al. Document Migration
Public relations
22 Oct 2009
E0900075-v1 Response to HAM-ISI Watchdog Committee Recommendations Jeffrey Kissel et al. Seismic Isolation
Commissioning
09 Mar 2009
E080181-x0 Process Traveler - stainless-conflats_blanks_shims Corey Gray Document Migration
22 Nov 2008
E080122-x0 Process Traveler - SEI_LHO_helicoils_stainless Corey Gray Document Migration
12 May 2008
E070332-x0 Process Traveler - SEI-LHO-feedthroughs from HPD Corey Gray Document Migration
25 Apr 2008
E080007-x0 Process Traveler - steel bolts for LLO Corey Gray Document Migration
25 Apr 2008
G080246-x0 Activities of the LSC glitch group during S5 Lindy Blackburn et al. Document Migration
11 Apr 2008
E080085-x0 EXTERNAL SEI INSTALLATION FOR HAM6 Corey Gray Document Migration
27 Feb 2008
T070122-x0 Facilities Modifications and Preparations Conceptual Design Betsy Weaver et al. Document Migration
19 Jun 2007
G060666-x0 LIGO Photon Calibrators Evan Goetz et al. Document Migration
22 Dec 2006
D040118-x0 2k Photon Calibrator Optical Layout Corey Gray Document Migration
06 May 2004
D040116-x0 4k Photon Calibrator Optical Layout Corey Gray Document Migration
06 May 2004
T000005-x0 2k FMy Pendulum Q Betsy Weaver et al. Document Migration
29 Sep 2000
G000262-x0 Source and Propagation of Predominant 1-50 HZ Seismic Signal from Off-Site at LIGO-Hanford - LSC Meeting at Hanford, August 15-17, 2000 Gabriela Gonzalez et al. Document Migration
20 Sep 2000

Number of documents found: 41


DCC Version 3.4.2, contact Document Database Administrators