Document List by Author

Adrien Le Roux of LIGO - Massachusetts Institute of Technology is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
P1200011-v6 Dynamics Enhancements of Advanced LIGO Multi-Stage Active Vibration Isolators and Related Control Performance Improvement Fabrice Matichard et al. Basic R&D
Seismic Isolation
20 Jun 2018
G1100507-v2 aLIGO SEI Testing Presentation, HAM-ISI, LLO Unit 3 Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
20 Jun 2018
E1300926-v3 aLIGO HEPI L1 HAM5 Assembly Validation Report Celine Ramet et al. Subsystem Test
Seismic Isolation
06 Mar 2015
E1300925-v2 aLIGO HEPI L1 HAM4 Assembly Validation Report Celine Ramet et al. Subsystem Test
Seismic Isolation
06 Mar 2015
E1300924-v2 aLIGO HEPI L1 HAM3 Assembly Validation Report Celine Ramet et al. Subsystem Test
Seismic Isolation
06 Mar 2015
E1100427-v4 aLIGO SEI Testing, HAM-ISI, Results Compilation Hugo Paris et al. Subsystem Test
Seismic Isolation
05 Nov 2014
E1100858-v4 aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #4 (L1-BSC4 ETMX) Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100856-v2 aLIGO BSC-ISI, Test Report, Phase 2, LLO Unit #2 (L1-BSC1 - ITMY) Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100855-v3 aLIGO BSC-ISI, Test Report, Phase 2, L1 BSC 2 (LLO Unit #1) Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100308-v1 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LLO Unit #5 Adrien Le Roux Subsystem Test
Seismic Isolation
18 Jun 2014
E1100307-v2 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LLO Unit #4 Adrien Le Roux Subsystem Test
Seismic Isolation
18 Jun 2014
E1100306-v1 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LLO Unit #3 Vincent Lhuillier et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E1100305-v1 aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LLO Unit #2 Adrien Le Roux Subsystem Test
Seismic Isolation
18 Jun 2014
E1100304-v3 aLIGO BSC-ISI, LLO Unit #1: Phase I Testing Report (Assembly Validation) Adrien Le Roux et al. Subsystem Test
Seismic Isolation
18 Jun 2014
E0900357-v28 aLIGO BSC-ISI, General Assembly Procedure Michael Hillard et al. Assembly
Seismic Isolation
18 Jun 2014
E1000393-v3 aLIGO BSC-ISI, Stage 0-1 Horizontal Actuator Assembly Procedure Sebastien Biscans et al. Final Design
Seismic Isolation
04 Dec 2012
E1000402-v10 aLIGO BSC-ISI, Parts Preparation Matrix for Helicoils and Dowel Pins Michael Hillard et al. Final Design
Seismic Isolation
18 Jan 2012
E1000387-v4 aLIGO BSC-ISI, Stage 1-2 Vertical Actuator Assembly Procedure Sebastien Biscans et al. Final Design
Seismic Isolation
21 Oct 2011
E1000523-v5 Trillium Pod Assembly Procedure Michael Hillard et al. Final Design
Seismic Isolation
06 Oct 2011

Number of documents found: 19


DCC Version 3.4.3, contact Document Database Administrators