Document List by Author

Marty Tellalian of Unknown Institution is listed as an author on the following documents:

LIGO-Number Title Author(s) Topic(s) Last Updated
C930023-x0 Livingston Site Survey of 7 December 1993 Marty Tellalian Document Migration
09 Mar 2020
P990007-v1 LIGO Beam Tube Module Design, Fabrication & Installation Lance Buboltz et al. Vacuum
Document Migration
02 Feb 2019
C930063-x0 CBI Beam Tube Module Design and Qualification Test: Preliminary Design Review Data Package (DRD #8) Cbi et al. Document Migration
15 Feb 2018
E950055-x0 Receiving Inspection, Rev. 01 Marty Tellalian Document Migration
18 Jan 2018
E950023-x0 Coil Material Bake Specification Marty Tellalian Document Migration
30 Jan 2013
E970010-x0 Expansion Joint Material Specification Marty Tellalian Document Migration
14 Jun 2012
E950102-x0 CBI Equipment Qualification Test for the LIGO Beam Tube Modules Marty Tellalian Document Migration
12 Jun 2012
E950097-x0 Weld Shelter Specification Marty Tellalian Document Migration
12 Jun 2012
E950074-x0 Procedure for Alignment Maintenance Using the Global Positioning System (GPS) Technique, Rev. 03 Marty Tellalian Document Migration
12 Jun 2012
E950073-x0 Initial and Final Alignment During Installation of LIGO Beam Tube Modules Using GPS System, Rev. 09 Cbi et al. Document Migration
12 Jun 2012
E950071-x0 Leak Test Decision Tree, Rev. 01 Marty Tellalian Document Migration
12 Jun 2012
E950070-x0 Helium Mass Spectrometer Hood Test of Beam Tube Module, Rev. 02 Marty Tellalian Document Migration
12 Jun 2012
E950069-x0 RGA Performance Test of Beam Tube Module, Rev. 01 Marty Tellalian Document Migration
12 Jun 2012
E950068-x0 Leak Testing Procedure - Helium Mass Spectrometer Hood Test of Pump Ports with Valve, Rev. 06 Marty Tellalian et al. Document Migration
12 Jun 2012
E950067-x0 Leak Testing Procedures - Helium Mass Spectrometer Hood Test of Closing Weld Joints Between Beam Tube Sections Cbi et al. Document Migration
12 Jun 2012
E950066-x0 Leak Testing Procedure - Helium Mass Spectrometer Hood Test of Beam Tube Sections Cbi et al. Document Migration
12 Jun 2012
E950065-x0 Clean Room Wearing Apparel for Beam Tube Access during Construction Inspection Activity, Rev. 03 Cbi et al. Document Migration
12 Jun 2012
E950064-x0 Final Cleaning & Inspection of Beam Tube Module Inner Surfaces, Rev. 02 Marty Tellalian Document Migration
12 Jun 2012
E950063-x0 Contamination Control for Construction Activities During Beam Tube Installation, Rev. 04 Cbi et al. Document Migration
12 Jun 2012
E950061-x0 Cleaning of Outgas Coupons, Rev. 04 Marty Tellalian Document Migration
12 Jun 2012
E950059-x0 Visual Inspection Requirements for Beam Tube and Components Marty Tellalian Document Migration
12 Jun 2012
E950058-x0 Visual Inspection Procedure Marty Tellalian Document Migration
12 Jun 2012
E950057-x0 Final Alignment and Module Testing Sequence, Rev. 02 Marty Tellalian Document Migration
12 Jun 2012
E950056-x0 Dimensional Control Procedure, Rev. 02 Marty Tellalian Document Migration
12 Jun 2012
E950054-x0 Positive Blower/Dryer/Filtration System (BDF) Installation and Maintenance, Rev. 03 Marty Tellalian Document Migration
12 Jun 2012
E950053-x0 Clean Room Transporting, Storage and Maintenance Procedure, Rev. 04D Marty Tellalian Document Migration
12 Jun 2012
E950052-x0 Fitting/Purge Procedure for Pump Port Attachment Welds, Rev. 06 Cbi et al. Document Migration
12 Jun 2012
E950051-x0 Fitting/Purge Procedure for Stiffener Attachment Welds, Rev. 06 Cbi et al. Document Migration
12 Jun 2012
E950050-x0 Fitting/Purge Procedure for Circumferential Butt Welds, Rev. 06 Cbi et al. Document Migration
12 Jun 2012
E950049-x0 Beam Tube Can Section Installation Sequence, Rev. 07 Cbi et al. Document Migration
12 Jun 2012
E950048-x0 Beam Tube Can Section Fabrication Sequence, Rev. 03 Marty Tellalian Document Migration
12 Jun 2012
E950047-x0 Plate Clean-Up Procedure for Tube Modules Marty Tellalian Document Migration
12 Jun 2012
E950046-x0 General Repair Procedure for Materials and Welds Marty Tellalian Document Migration
12 Jun 2012
E950045-x0 Storage and Care of Welding Consumables, Rev. 02 Marty Tellalian Document Migration
12 Jun 2012
E950044-x0 Welding Procedure for Structural (Carbon to Carbon) Marty Tellalian Document Migration
12 Jun 2012
E950043-x0 Welding Procedure for Structural (Carbon to Carbon) Marty Tellalian Document Migration
12 Jun 2012
E950042-x0 Welding Procedure for Structural (Carbon to Stainless) Marty Tellalian Document Migration
12 Jun 2012
E950041-x0 Welding Procedure for Structural (Stainless to Stainless) Marty Tellalian Document Migration
12 Jun 2012
E950040-x0 Welding Procedure for Structural (Carbon to Carbon) Marty Tellalian Document Migration
12 Jun 2012
E950039-x0 Welding Procedure Specification (ER308L/REPAIR) Marty Tellalian Document Migration
12 Jun 2012
E950038-x0 Weld Procedure, GMA Welding for 304L Materials, Rev. 03 Marty Tellalian Document Migration
12 Jun 2012
E950037-x0 Welding Procedure Specification (ER308L/PORT) Marty Tellalian Document Migration
12 Jun 2012
E950036-x0 Welding Procedure Specification (ER308L/STIFFENER) Marty Tellalian Document Migration
12 Jun 2012
E950035-x0 Welding Procedure for Expansion Joint to Beam Tube Can Assemblies Marty Tellalian Document Migration
12 Jun 2012
E950034-x0 General Welding Procedure GMAW & FCAW Marty Tellalian Document Migration
12 Jun 2012
E950033-x0 General Welding Procedure GTAW Marty Tellalian Document Migration
12 Jun 2012
E950032-x0 General Welding Procedure SMAW Marty Tellalian Document Migration
12 Jun 2012
E950031-x0 Pump Port Reinforcing Pad Fabrication Specification Marty Tellalian Document Migration
12 Jun 2012
E950030-x0 Pump Port Fabrication Specification Cbi et al. Document Migration
12 Jun 2012
E950029-x0 Support Ring Fabrication Specification, Rev. 04 Marty Tellalian Document Migration
12 Jun 2012
E950028-x0 Beam Tube Support Specification Marty Tellalian Document Migration
12 Jun 2012
E950027-x0 Vacuum Stiffener Fabrication Specification Marty Tellalian Document Migration
12 Jun 2012
E950026-x0 LIGO Beam Tube Expansion Joints Construction Option, Rev. 06 Marty Tellalian Document Migration
12 Jun 2012
E950025-x0 LIGO Beam Tube Sections Construction Option, Rev. 02 Marty Tellalian Document Migration
12 Jun 2012
E950022-x0 Beam Tube Material Specification Marty Tellalian Document Migration
12 Jun 2012
E950009-x0 Monitoring Procedure Marty Tellalian Document Migration
12 Jun 2012
E950008-x0 Baffle Cleaning and Support Attachment Marty Tellalian Document Migration
12 Jun 2012
E950007-x0 Emergency Procedure Instructions, Outgas Procedure Comments, Baffle Cleaning, Schedule Marty Tellalian Document Migration
12 Jun 2012
E930002-x0 Cleaning Procedure for Outgas Test Coupons, CLCOUP - Rev. 0 Marty Tellalian Document Migration
07 Jun 2012
E950096-x0 Clean Room Specification Marty Tellalian Document Migration
13 Feb 2012
E950062-v1 Cleaning of Beam Tube Can Modules Dennis Coyne Fabrication
Vacuum
27 Oct 2009
E960119-x0 Welding Procedure Specification (COIL-SPLICE) Marty Tellalian Document Migration
19 Sep 1996
E960118-x0 Welding Procedure Specification (ER308L/MANUAL) Marty Tellalian Document Migration
19 Sep 1996
E960120-x0 Welding Procedure Specification (SPIRAL) Marty Tellalian Document Migration
19 Sep 1996
T960022-x0 Sketches Showing the Cut Lines in the Qualification Test Assembly Marty Tellalian Document Migration
24 May 1996
T950092-x0 Support Bracket Calculations Marty Tellalian Document Migration
18 Sep 1995
T950041-x0 Service Road Access to the Beam Tube Fiberglas Reinforced Pastic Rebar Marty Tellalian Document Migration
06 Jun 1995
T950023-x0 Man-Hour Estimate for Module Leak Testing Marty Tellalian Document Migration
14 Apr 1995
T950013-x0 Proposed Modifications to the Beam Tube Slab and Cover Marty Tellalian Document Migration
24 Mar 1995
T940043-x0 Status of Section Cleaning and Pumpdown Readiness Meeting Marty Tellalian Document Migration
11 Dec 1994
T940039-x0 FTIR Reports on the 7` Tube Section Sampling Marty Tellalian Document Migration
23 Nov 1994
T940036-x0 Cleaning Procedure for the 8` Trial Section Marty Tellalian Document Migration
16 Nov 1994
T940035-x0 FTIR Analysis of Contaminated Propanol Flushed Through Test Tube Section Marty Tellalian Document Migration
16 Nov 1994
T940033-x0 MSDS for Ansul AFFF Foaming Agent Marty Tellalian Document Migration
10 Nov 1994
T940032-x0 Cleaning Assessment Sampling Procedure Marty Tellalian Document Migration
08 Nov 1994
T940030-x0 Laboratory Analysis of the Contaminated Solvent Marty Tellalian Document Migration
02 Nov 1994
T940025-x0 Lab Notes for Section Leak Test - October 6 - 10, 1994 Marty Tellalian Document Migration
11 Oct 1994
T940024-x0 Lab Notes for Section Leak Test - October 11, 1994 Marty Tellalian Document Migration
11 Oct 1994
T940019-x0 Section Leak Test - Day 3 Marty Tellalian Document Migration
05 Oct 1994
T940054-x0 Dent Calculation Example and GPS Convention Marty Tellalian Document Migration
26 Aug 1994
T940014-x0 Weld Wire Cleaning and Quality Control Marty Tellalian Document Migration
04 May 1994
T940016-x0 Beam Tube Erection Sequence and QT Item Listing Marty Tellalian Document Migration
22 Apr 1994
T940015-x0 Support Thermal Insulation and Analysis Marty Tellalian Document Migration
04 Feb 1994

Number of documents found: 83


DCC Version 3.4.3, contact Document Database Administrators