LIGO Document T1500405-v1
- In response to a review of the final design of the Hardware Watchdog, and analysis and review of the hardware was conducted at Caltech. The focus of the review was to understand:
1. Issues relating to unreliable boot operation in the field
2. Mitigation for an undesirable logic level choice with respect to the safe reporting of status
3. Installed code revision verification
-
- PDF Version (HardwareWatchdogAnalysis_v1.pdf, file is not accessible)
- Other Files:
- Word Version (HardwareWatchdogAnalysis_v1.docx, file is not accessible)
DCC Version 3.4.3, contact
Document Database Administrators