LIGO Document G1000022-v1
- Slides shown to the Gingin Advisory Committee on Dec 8, 2009.
Included in information on the East arm extension, change to the LaCoste stage springs, high power laser from Adelaide, thermal tuning test mass RoC, AdLIGO like control system, site seismic noise survey, control mass control from upper stage, tabletop PI experiments, and plans for the next 3 months.
DCC Version 3.4.3, contact
Document Database Administrators