LIGO Document E1800108-v1

FTIR sample taken from LHO's IP11 isolation gate valve

Document #:
LIGO-E1800108-v1
Document type:
E - Engineering documents
Other Versions:
Abstract:
A potential contamination event occurred during installation of the newly rebuilt 2500 L/s ion pump at LHO's Y-end station (IP11).
Files in Document:
Topics:
Authors:
Keywords:
FTIR IP11 contamination
Referenced by:

DCC Version 3.4.3, contact Document Database Administrators