LIGO Document E1600114-v1

ECR: TCS Laser Patch Panel Power Feedthrough Upgrade

Document #:
LIGO-E1600114-v1
Document type:
E - Engineering documents
Other Versions:
Abstract:
The laser power feedthroughs at the table patch panels currently use CONNEC connectors that are not reliable due to strain induced on the backshell. Several upgrade possibilities were discussed, but the simplest option is to replace the connectors with a hard-wired screw connection inside a metal electrical box. This allows use of standard cable clamps appropriate for the large diameter cable. Patch panel will need drilled to mount box.
Notes and Changes:
4/12/2016: approved by Dennis Coyne


Before an associated FRS (Integration issue & ECR Tracker) entry is created (in order to follow the implementation of this ECR), we need clarification - does this ECR resolve/fix the problem reported in FRS #4531:
https://services.ligo-la.caltech.edu/FRS/show_bug.cgi?id=4531
Referenced by:

DCC Version 3.4.2, contact Document Database Administrators