Reason/background: All optical levers have the ability to readout out laser diode power monitors. Readout channels for these monitors were an intended part of the Optical Lever design per these drawings:
HAM Table and Optics levers
https://dcc.ligo.org/LIGO-D1002740, pg 16
ITMS and BS
https://dcc.ligo.org/LIGO-D1100022, pg 21
ETMs
https://dcc.ligo.org/LIGO-D1002741, pg 16
such that we could assess (and perhaps alarm on) the health of the optical lever lasers.
As of Feb-2015 neither observatory has laid the necessary cabling for this system, nor are their channels built into in the SUSAUX front-end code expecting them.
A decision has been made to eliminate the laser diode power monitoring from the baseline design. See integration issue #1017:
https://services.ligo-wa.caltech.edu/integrationissues/show_bug.cgi?id=1017
DCC Version 3.5.0, contact
DCC Help