LIGO Document E1400463-v5
- aLIGO Installation Acceptance Document for WBSC9.
- WBSC9_acceptance_notes_2014-12-17 (S.Aston)
Change list from E1400463-v1 to v2
Section 1 (Installation)
- Electronics Rack Designations have now been populated for SUS and ISC. But, SEI & TCS are still missing.
- Noted that there is a temporary T240 Ground Seismometer at X end, in place of a STS-2 D1400077.
Section 2 (Procedures)
- Added OpLev aLOG links for installation, alignment and calibration.
Section 3 (Drawings)
- Added Electronics Rack Drawings for SUS, SEI and ISC.
Section 4 (Serial Numbers)
- Added ICS link for HEPI, D0901150, sub-assembly there of.
Section 5 (Testing)
- Viewports, removed link to old ICS record E1300447, replaced with more suitable T1200363, but still needs updating, and test status not shown.
- AOS/ACB, added photodiode tested in-situ using baffle OpLev alignment & calibration tests, aLOG link 10331.
- AOS/TCS/RHx, added initial testing link to aLOG 9272, but need acceptance testing measurements.
- TMSX, confirmed that no B&K measurements have been taken.
- ESD, added aLOG links to ESD initial and TF tests.
Section 6 (Installation Completeness)
- ICS assembly records to be updated.
Section 7 (Integration Issues / ECRs)
- I noticed there was an open integration issue regarding a noisy channel on the ETMX L2 UL OSEM (Bug#929).
Change list from E1400463-v2 to v3
Section 1 (Installation)
- Electronics Rack Designations have now been populated for the remaining SEI & TCS racks. Added hyper-links to DCC.
- Other equipment, added a DCC link showing placement of ground seismometer for X end.
Section 5 (Testing)
- Noted that testing is on TCS to-do list.
Section 7 (Integration Issues and ECRs)
- Added a link to integration issue container for WBSC9 (#987)
Change list from E1400463-v3 to v4
Preserved hyper-links in PDF document.
Section 3 (Drawings)
- Added Electronics Rack Drawings for SUS, SEI and ISC as well as TCS.
Section 7 (Integration Issues and ECRs)
- Removed an out of date comment noting that this was still the LLO buglist.
Change list from E1400463-v4 to v5
Section 5 (Testing)
- Added note to AOS/CMB B&K testing stating that links are to equivalent LLO measurements, but no LHO measurements have been found.
Section 6 (Installation Completeness)
- Amended note to state that all items are installed.
- Removed note regarding ICS completeness.
DCC Version 3.4.3, contact
Document Database Administrators