LIGO Document E1400047-v1
- The arm initial alignment (dither alignment) code needs the green arm transmitted signals to be available in the ASC front-end. Those signals are currently only available in Beckhoff corner system. A DB9 cable and 4 ADC channels are required to make the signals available
-