LIGO Document E1200795-v6
- This is the procedure for the initial alignment of the Washington BSC2. This document describes the necessary equipment and procedures for setting the initial positions and the angular alignments of the principal optics both for the cartridge installation on the test stand and the later installation of the cartridge into the chamber.
- 6/2/2014 J. Oberling: Pitch data entry format changed to coincide with other IAS As Built documents.
3/17/2014 J. Oberling: Various format and cross reference fixes.
11/20/2013 J. Oberling: Since this alignment is completed the As Built document is getting its own version.
Document now reflects alignment procedure as performed in WBSC2.
Added As Built document
DCC Version 3.4.3, contact
Document Database Administrators