LIGO Document E1101022-v1
- This document describes the plan for acceptance testing of the ITM Elliptical Baffle during manufacturing, and for testing the final assembly before installing in the aLIGO chambers.
- Removed "Fabrication, Installation" from the title. The Assembly of the SLC ITM Elliptical Baffle is defined in E1200677 and the Installation is defined in E1101021.
Note: The title must still be changed in the document itself.
DCC Version 3.4.3, contact
Document Database Administrators