LIGO Document E0900216-v6

Assembly Procedure: HAM ISI, Advanced LIGO

Document #:
LIGO-E0900216-v6
Document type:
E - Engineering documents
Other Versions:
Abstract:
Detailed instructions for assembling a HAM ISI table for Advanced LIGO.
Files in Document:
Other Files:
Authors:
Notes and Changes:
Significant update. Much more detail on leveling Stage 1 and aligning the Actuators and Sensors.
Addendum uploaded on July 23, 2010. This document shows CAD snapshots of Shipping Braces being mounted to the system, to clamp Stage 1 to Stage 0.

-v6: Arnaud Pele Added note p89 for installing the horizontal GS13 when using the A+ cables (more details in https://alog.ligo-la.caltech.edu/SEI/index.php?callRep=1765)

Related Documents:

DCC Version 3.4.3, contact Document Database Administrators