LIGO Document D961108-x0

Preliminary Design Update - Beam Splitter Chamber (BSC), LIGO Vacuum Equipment, Annulus Piping Arrangement

Document #:
LIGO-D961108-x0
Document type:
D - Drawings
Abstract:
None
Files in Document:
Authors:
Notes and Changes:
Migrated document information from the old DCC:
- Full document number: LIGO-D961108-P1-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1996-03-08
- Document received date: 1996-10-17
- Document entry date: 1996-10-17
- ContDocNo: V049-4-025, Rev. P1
- Location: Livingston

Rev D961108-04-V:
- Full document number: LIGO-D961108-04-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1997-04-04
- Document received date: 1997-07-10
- Document entry date: 1997-07-10
- ContDocNo: V049-4-025, Rev 4
- Location: Livingston

Rev D961108-03-V:
- Full document number: LIGO-D961108-03-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1997-01-28
- Document received date: 1997-01-28
- Document entry date: 2001-08-06
- ContDocNo: V049-4-025, Rev. 3
- Location: Livingston

Rev D961108-00-V:
- Full document number: LIGO-D961108-00-V
- Author(s): Process Systems Int'l, Inc.
- Document date: 1996-02-06
- Document received date: 1996-02-06
- Document entry date: 1996-07-12
- ContDocNo: V049-4-025, Rev. 0
- Location: Livingston

DCC Version 3.4.3, contact Document Database Administrators