LIGO Document D1201390-v2
- Installation of October 11, 2012
The only optics installed are the ones which allow the REFL, POP/ALS and PSL beams to be routed to ISCT1.
-
- [PDF] D1201390-v2 (D1201390_HAM1_HIFOInstallation_Oct2012.pdf, file is not accessible)
- Other Files:
- Fixed a couple of typos
**OBSOLETE (DO NOT USE), HAM1 is now fully populated at both sites**
DCC Version 3.4.3, contact
Document Database Administrators