LIGO Document D1102101-v1

HSTS Secondary Prism Placement Fixture Arrangement, Metal Bottom Mass

Document #:
LIGO-D1102101-v1
Document type:
D - Drawings
Other Versions:
Abstract:
This is an assembly drawing of the HSTS Metal Bottom Mass Secondary Prism Placement Fixture Arrangement.
Files in Document:
Other Files:
Authors:
Notes and Changes:
Initial release.

DCC Version 3.4.3, contact Document Database Administrators