LIGO Document D1001944-v3
- Possible layout of ALS optics on the PSL table.
- Removed SHG and 532nm beat heterodyne measurements from PSL table.
Routed PSL pick-off beam into HAM1.
Removed one fibre coupler and switched to a fibre based beamsplitter for the beams sent to the end stations.
DCC Version 3.4.3, contact
Document Database Administrators