LIGO Document D0901809-v9
- aLIGO Systems, HAM1-L1 Top Level Chamber Assembly
Both a high resolution and a low resolution pdf are included. Low resolution for tablets etc ...
- v9 Updated for pictorial purposes to capture changes at lower lever assemblies.
v8 Updates layout to add L4C Pods
-v10(WIP) notes :
0.The output beam from the JAC needs to be modified as per attached
1.Move the two beam diverters to fit them on the table
2.Keep the JAC lens at the design position
3.Add a placeholder lens for the POP REFL WFS
4.Remember to add a 2nd refl PD for LHO
5.Check that flipping the ASC sled conserves the path length (this should be a good reference T1000247)
DCC Version 3.5.0, contact
DCC Help