LIGO Document D0901522-v1
- Vertical wall on lower part of Stage 2 structure. The stiffener on the back of the Horizontal GS-13 mounts to this wall.
- Initial release for Advanced LIGO fabrication.
DCC Version 3.4.3, contact
Document Database Administrators