LIGO Document D0901519-v2
- Top half of Keel structure for Stage 2 of the aLIGO BSC ISI. Includes a breadboard pattern of threaded inserts for attaching Ballast masses as needed for balancing the stage.
- See DCN E1000129 for changes made since v1 release.
DCC Version 3.4.3, contact
Document Database Administrators