LIGO Document D0900859-v2

GS-13 Pod Top Hat , aLIGO BSC-ISI

Document #:
LIGO-D0900859-v2
Document type:
D - Drawings
Other Versions:
LIGO-D0900859-v5
23 Jul 2010, 09:38
LIGO-D0900859-v4
03 Jun 2010, 12:38
LIGO-D0900859-v3
30 Apr 2010, 13:07
LIGO-D0900859-v1
11 Feb 2010, 08:02
Abstract:
GS-13 Pod Top Hat for aLIGO BSC-ISI
Files in Document:
Keywords:
GS-13 Pod
Notes and Changes:
- Note 7 has been completed with "All trapped volumes must vent to inside".
- updated the revision block (DCC revision #, Drawing tree update...)
- Note 15, "ELECTROPOLISH BEFORE WELDING" replaced by "ELECTROPOLISH AFTER WELDING"
- Note 15 completed with "MASK CF FLANGE GASKET SURFACES"
- the weld symbol on the inside spec now a 1/2-3 Length-Pitch (To not trap gas between the external and the internal weld).
- added a MMC
- BOM, Item 1, completed with "or MACHINED TO SAME DIMENSIONS AND TOLERANCES".