LIGO Document D080728-v2
- This is an assembly drawing of the HLTS Bottom Mass Upper Earthquake Stop Assembly.
- Modified to be a two-part earthquake stop for the upper side of the HLTS Bottom Mass to allow for easier and safer optic insertion.
DCC Version 3.4.3, contact
Document Database Administrators