LIGO Document D071321-v2
- Temporarily inserted in Stage 1 Floor (HAM ISI), during Spring tensioning. Intended to protect the Floor, though nominally there is no contact between the Bushing and the Pull-Down Tool.
- Release for Advanced LIGO procurement.
Changes from Enhanced LIGO version include:
1. Minor change to fillet and chamfer details.
DCC Version 3.4.3, contact
Document Database Administrators