LIGO Document E1200344-v4
- All BSC, Install Completed Cartridge Into Chamber Procedure, aLIGO
Note that a full listing of top level installation procedures can be found at E1200023.
- 1) Name Change.
2) Must be used in conjunction with relevant Top Level Installation Procedure, Cartridge Hazard Analysis, relevant Critical Lift Plan and relevant Cartridge Flight Document.
i) TOP LEVEL INSTALLATION PROCEDURES
LIGO-E1200023: aLIGO Chamber Chamber (Top Level) Installation Procedures
ii) CARTRIDGE HAZARD ANALYSIS
LIGO-E1200925: BSC Cartridge Installation Hazard Analysis, aLIGO
iii) CRITICAL LIFT PLANS (Refer to LIGO-E1200901)
LIGO-E1200950: Critical Lift Plan for the aLIGO BSC1-L1 Cartridge Installation
LIGO-E1200328: Critical Lift Plan for the aLIGO BSC2-L1 Cartridge Installation
LIGO-E1200275: Critical lift plan for the aLIGO BSC6 cartridge installation
LIGO-E1100988: Critical lift plan for the aLIGO BSC8 cartridge installation
iv) CARTRIDGE FLIGHT DOCUMENTS (REFER TO LIGO-E1200900)
LIGO-E1200927: BSC1-L1 Requirements and Procedure, Cartridge Flight and Insertion into BSC Chambers, aLIGO
LIGO-E1200322: BSC2-L1 Requirements and Procedure, Cartridge Flight and Insertion into BSC Chambers, aLIGO
LIGO-E1100278: BSC6-H2 Requirements and Procedure, Cartridge Flight and Insertion into BSC Chambers, aLIGO
LIGO-E1101016: BSC8 H2, Requirements and Procedure, Cartridge Flight and Insertion into BSC Chamber, aLIGO